|
| 1 | SHS Primary Rack (with Inconel-600 cooler coils) |
| 2 | SHS Wet panel- Walkway through enclosed type |
| 3 | SHS Dry Panel |
| 4 | Chiller 2x100% Redundant - Min. 5 TR rating (with 25% extra capacity) - 1 chiller for U#1 & Common chiller for U#2&3 |
| 5 | SWAS Loose supply Items as per Annexure-A |
| 6 | COMMISSIONING SPARES- Reagents /Calibrators/Standard solutions as required for commissioning & handing over of System to Owner. |
| 7 | CONSUMABLES OTHER THAN CHEMICAL REAGENTS LIKE pH CELL, DO Sensors ETC. |
| 8 | Freight charges for complete indigenous scope of supply upto project site |
| 9 | Erection Supervision & successful commissioning of SWAS in each unit of power plant (as per sl.no.11 under Scope of supply sheet of Technical specification) |
| 10 | CHEMICAL REAGENTS FOR 12 months continuous OPERATION of Analysers |
| 11 | Optional item for Ordering - Price for one line of High Pressure & High Temp.- Primary & Secondary cooling to be considered along with other instruments as per P&ID applicable for the project. |
| 12 | Optional item for Ordering -Price for one line of Low Pressure & Low Temp. -Secondary cooling to be considered along with other instruments as per P&ID applicable for the project. |
| 13 | Conductivity (Specific, Cation) Analyser - Single channel |
| 14 | Conductivity (specific) analyser for Hotwell - Single channel |
| 15 | pH Analyser- Single channel |
| 16 | Dissolved Oxygen Analyser- Single channel |
| 17 | Sodium Analyser (Multi channel-6 channel including spare channel) |
| 18 | Silica Analyser (Multi channel-5 channel including spare channel) |
| 19 | Hydrazine Analyser- Single channel |
| 20 | Iron Analyser |
| 21 | Turbidity Analyser |
| 22 | Degassed Cation Conductivity Analyser |
| 23 | 06 months deputation period of expert engineer post commissioning of equipment in each unit of power plant |
| 24 | Comprehensive Annual Maintenance contract in each unit of power plant for 03 yrs. post completion of warranty |
| 25 | Mandatory Spares for SHS (ref. Annexure-B) |
| 26 | Mandatory Spares for Analysers (ref. Annexure-B) |