| 1 | Material & labour for Servicing of 1200/1400MM ceilingfan by dismantling carefully and taking out unserviceable parts, dust & grease, cleaning of internal parts with kerosene oil, washing, checking of alignment of shaft, oiling and re-greasing of bearing/bushes including replacing of unserviceable part like bearing ,gun metal bush, capacitor,Rubber reel of suitable capacity and re-assembling the same and complete all as specified and as directed byEngineer-in-Charge. |
| 2 | Material & labour for taking out & removing old burnt-out windings of electric fans of any description and rewinding of fan motor with appropriate size super enameled copper wire as approved by Eng-in-charge including insulating material such as illuminous paper,Letherized paper,cotton tape,glass sleeving,insulating varnish etc.and transportation to site after testing at workshop,connecting and testing on full load ,hanging/fixing the repaired fans in same position or at position complete all as specified and as directed byEngineer-in-Charge. as directed for the following fans:-(a) Rewinding of motor of ceiling fans 1200/1400 mm sweep complete all as specified and directed By Engr-in -Charge. |
| 3 | All as per item No 02here-in-before but rewinding of motor of exhaust fans of 300/450 mmsweep complete all as specified and directed By Engr-in -Charge. |
| 4 | All as per item No.02 here-in-before but rewinding of motor of wall mounted fans of 450/600 mm sweep complete all as specified and directed By Engr-in -Charge. |
| 5 | All as per item No.02 here-in-before but rewinding of flame proof exhaust fans of 300 mm sweep complete all as specified and directed By Engr-in -Charge. |
| 6 | Supply & fix in replacement ballbearing suitable forceiling fan/exhaust fan/wall mounted fan/pedestal fan complete all as specified and as directed byEngineer-in-Charge |
| 7 | Supply & fix in replacement gun metal bushes suitable forceiling fan/exhaust fan/wall mounte fan/pedestal fan etc complete all as specified and as directed byEngineer-in-Charge |
| 8 | Supply & fix in replacement rotor shaft suitable for ceiling fan complete all as specified and as directed byEngineer-in-Charge |
| 9 | Supply & fix in replacement capacitor 2.5 MFD 250 volts AC complete all as specified and as directed byEngineer-in-Charge |
| 10 | Supply & fix in replacement capacitor 4 MFD 250 volts AC complete all as specified and as directed byEngineer-in-Charge |
| 11 | Supply & fix in replacement only rubber reel, bolt & nut, including cotter pin etc, complete all as specified and directed By Engr-in -Charge. |
| 12 | Supply & fix in replacement flexible wire 23/.0076 twin core copper conductor complete all as specified and as directed byEngineer-in-Charge |
| 13 | Material & labour for fabrication of fan hook made out of MS strip 32x6mm duly welded with 12mm dia MS rod and fan hook bend to shape \"S\" after taking out old one complete all as specified and as directed byEngineer-in-Charge |
| 14 | Supply & fix in replacementin repair ceiling fan down rod of length 300/450 mm, inner diameter 15mm and thickness not less than 1.5mm with clamps nuts, bolts and washers for existing ceiling fan complete all as specified and as directed byEngineer-in-Charge |
| 15 | Supply & fix in replacementin repair ceiling fan down rod of length 600 mm, inner diameter 15mm and thickness not less than 1.5mm with clamps nuts, bolts and washers for existing ceiling fan as approved by Engr-in-Charge etc complete all as specified and as directed byEngineer-in-Charge |
| 16 | Supply & fix alluminiumfan blades white colour suitable for 1200mm sweep ceiling fan with suitable nuts and bolts complete all as specified and as directed byEngineer-in-Charge |
| 17 | Material & labourfor complete painting of ceiling fan and sweep with two coats synthetic enameled paint(spray paining) of existing colour or ordered colour on one coat of red oxide primer after scratching and making/prepration of clean and smooth surfaces by applying putty complete all as specified and as directed byEngineer-in-Charge. |
| 18 | All as per item No 17here-in-before but painting of exhaust fans of 300/450 mm sweep complete all as specified and as directed byEngineer-in-Charge |
| 19 | Supply & fix in replacement of PVC body exhaust fan, AC single phase 230/240V of size 250 mm sweep with louvers including making hole of suitable size/ alteration to the existing hole to fix the exhaust fan complete all as specified and as directed byEngineer-in-Charge. (Note: Old unserviceable exhaust fan will be deposited in MES store yard). |
| 20 | All as per item No 19here-in-before butPVC exhaust fan of size 300 mm sweep complete all as specified and as directed byEngineer-in-Charge. |
| 21 | All as per item No 19here-in-before butmetal exhaust fan of size 230/250 mm sweep complete all as specified and as directed byEngineer-in-Charge. |
| 22 | All as per item No 19here-in-before butmetal exhaust fan of size 300 mm sweep complete all as specified and as directed byEngineer-in-Charge. |
| 23 | All as per item No 19here-in-before but heavy duty exhaust fan of size 380 mm sweep complete all as specified and as directed byEngineer-in-Charge. |
| 24 | All as per item No 19here-in-before but heavy duty exhaust fan of size 450 mm sweep complete all as specified and as directed byEngineer-in-Charge. |
| 25 | Supply & fix in replacement of flame proof metal body exhaust fan AC single phase 230/240V of size 375 mm sweep with louvers including making hole of suitable size/ alteration to the existing hole to fix the exhaust fan complete all as specified and as directed byEngineer-in-Charge. ( Note: Old unserviceable flame proof exhaust fan will be deposited in MES AGE E/M store yard). |
| 26 | Supply & fix in replacementenergy saving ceilling fan 1200mm sweep min air delivery 210 CFM with brushless direct current motor (BLDC) and connecting up including provision of cable from ceilling roseor connectorto fan and complete all as specified and as directed byEngineer-in-Charge . (Note:- Old unserviceable Ceiling fan will be deposit in AGE E/M store yard) |
| 27 | Supply & fixbollard luminaire die cast housing and clear acrylic of IP 65 protection Inverted tripod type , resistanceto corrsion of 10 watt with LED lamp with all fixing arrangementsfixedwith soft 360 deg light distribution complete including taking down old unserviceble fitting of any typecomplete all as specified and as directed byEngineer-in-Charge. |
| 28 | Supply & fix in replacement energy saving, evironment friendly, long life, corrosion resistent, impact proof, Mini LED building securitylight made up of pressure die cast housing with prismatic polycarbonate diffuser and individual LEDs with secondary optics and IP 65 protection with LED 20 W light source including material and labour for suitable bracket made of 20 mm dia light grade GI pipe & MS clamps complete with nuts and bolts and washers complete all as specified and as directed byEngineer-in-Charge |
| 29 | Supply & fix in replacement inverter type LED street light 60 watt, PDC housing, IP-66 inbuilt battery backup auto On/Off/ Dimm including connecting with min 2.5 mtr, 1.5 Sqmmmultistranded copper wire complete all as specified and as directed byEngineer-in-Charge. |
| 30 | Supply and fixingin repairs wall mounted decorative ultra slim LED lighting fixture with extruded polycarbonate, environmental friendly, energy efficient ready to use pack instant start with uniform light distribution 10 W 2 ft indoor decorative with 2 core copper wire from ceiling rose to light fitting etc complete all as specified and as directed byEngineer-in-Charge |
| 31 | Supply and fixingin repairs wall mounted decorative ultra slimLED lighting fixture with extruded polycarbonate, environmental friendly, energy efficient ready to use pack instant start with uniform light distribution18/20 W 4 ft indoor decorative with 2 core copper wire freom ceiling rose to light fitting etc complete all as specified and as directed byEngineer-in-Charge |
| 32 | Supply & fix in replacement LED retrofit 4 ft 18/20 watt T8 Tube light including disconnecting existing copper/ electronic ballast and connected items like starter, flexible wire etc complete in the existing flourescent T/L fittings of 36/40 watt and 1x36/40W , 2x36/40 W complete all as specified and as directed byEngineer-in-Charge |
| 33 | Labour only for attending emergent complaints i.e no light ,earth leakage,short circuit, neutral break, mains/ sub main/internal circuit of existing system of main building /block, making continious electric supply including carrying out minor repairs etc as required to make the system in order/functional including replacing fuse wire,copper cable,copper thimbles, glands,earthing wire complete all as specified and as directed byEngineer-in-ChargeNote:-1.Rate of fuse wire,copper cable of size 1.5,2.5,4 Sqmm upto 3 RM,copper thimbles, glands, earthing wire are deemed to be considered in this item.2.Minimum One electrician to be present daily during the contract period,if found absent Rs-600 per day will be deducted daily. |
| 34 | Pulling down the existing U/S wires of any type from concealedwiring carefully of aluminium point wiring (light, fan, bell, socket, power point etc.) with or without conduit, along with all connected accessories such as ceiling rose, switches, sockets, switch boards, fan regulator etc complete all as specified and as directed byEngineer-in-Charge |
| 35 | Pulling outsub main wiring only any size of aluminium conductor cable PVC insulated with or without condiut complete all as specified and as directed byEngineer-in-Charge. |
| 36 | Material & labour for point wiring complete with 1.5 Sqmm single core multistranded copper conductor FRLSH PVC insulated and unsheathed cable 1100 volts grade ISI marked drawn through and including PVC CASING & CAPPING INCLUDING accessories etc including fixed to wall/ceiling including provision of 1.5 sqmm single core multistranded copper conductor FRLSH PVC insulated and unsheathed as earth wire continuity with wooden board (1st class teak wood) with laminated sheet top cover, 3mm thick complete all as specified and as directed byEngineer-in-Charge for:- |
| 37 | One light point controlled by one, one way switch single pole piano type |
| 38 | One Fan point controlled by one, one way switch single pole piano type |
| 39 | One 3 pin 5 Amp socket outlet on the same board . |
| 40 | One 3 pin 5 Amps socket out let on independent board |
| 41 | One bell point controlled by one bell push on independent board. |
| 42 | All as per item No.36 here-in-before but with 2.5 Sqmm copper conductor cable for one 3 pin, 15 Amps socket out let on independent board complete all as specified and as directed byEngineer-in-Charge |
| 43 | Supply & fix modular white cover plate with frame of module 2 flush ISI marked complete all as specified and as directed byEngineer-in-Charge. |
| 44 | Supply & fix modular white cover plate with frame of module 3 flush ISI marked complete all as specified and as directed byEngineer-in-Charge. |
| 45 | Supply & fix modular white cover plate with frame of module 6 flush ISI marked complete all as specified and as directed byEngineer-in-Charge. |
| 46 | Supply & fix modular white cover plate with frame of module 8ISI marked complete all as specified and as directed byEngineer-in-Charge. |
| 47 | Supply & fix modular blank plate module 1 complete all as specified and as directed byEngineer-in-Charge. |
| 48 | Material & labour for sub main wiring with two runs of PVC insulated and unsheathed FRLSH cable 650/1100 Volts grade, conforming to IS-1536-1977 multi-stranded 4 Sqmm single core, copper conductor drawn through and including PVC casing capingISI marked with accessories and 4 Sqmm single core multistranded copper conductor FRLSH PVC insulated and unsheathed cable 1100 volts grade, ISI marked as earth continuity wire complete all as specified and as directed byEngineer-in-Charge.(Note: Two runs of conductor with one run of earth wire and PVC casing capping will be measured & paid as one unit) |
| 49 | All as per item No 43 but with 6 sqmm copper conductor in existing conduit |
| 50 | Supply & fix in replacement, switch piano type, 5 Amp. SP, one way complete all as specified and as directed byEngineer-in-Charge |
| 51 | Supply & fix in replacement switch socket combination, 2 in 1, 5 Amp, flush type complete all as specified and as directed byEngineer-in-Charge. |
| 52 | Supply & fix in replacement switch socket combination 2 in 1, 5/16A 5 in 1 Amp flush type universal complete all as specified and as directed byEngineer-in-Charge. |
| 53 | Supply & fix in replacement switch bell push, flush type, 5 Amp complete all as specified and as directed byEngineer-in-Charge |
| 54 | Supply & fix in replacement, modular switch flush type, 6 Amp. SP, one way ,1 module complete all as specified and as directed byEngineer-in-Charge. |
| 55 | Supply & fix in replacementmodularswicth, 16 Amp flush type 1 module complete all as specified and as directed byEngineer-in-Charge. |
| 56 | Supply & fix in replacement modular socket outlet, 3 pin, 6 Amp, flush type 2 module complete all as specified and as directed byEngineer-in-Charge. |
| 57 | Supply & fix in replacementmodularsocket outlet, 3 pin, 6/16 Amp flush type 2 module complete all as specified and as directed byEngineer-in-Charge. |
| 58 | Supply & fix in replacementmodularbell push, flush type, 6 Amp,1 module complete all as specified and as directed byEngineer-in-Charge |
| 59 | Supply & fix in replacement bell, AC, 230 V, SP, ding dong type complete all as specified and as directed byEngineer-in-Charge |
| 60 | Supply & fix in replacement switch piano flush type 230/250 Volt, 5 Amps single pole two way, complete all as specified and as directed byEngineer-in-Charge. |
| 61 | Supply & fix in replacement stepped type electronic fan regulator flush type on the existing phenolic laminated etc as reqd single pole 240 volts grade 350 watts heavy duty ISI marked complete all as specified and as directed byEngineer-in-Charge. |
| 62 | Supply & fix in replacement of ceiling fan regulator 120 Watt 2 module type electronic step type 5 step 360 deg complete all as specified and as directed byEngineer-in-Charge. |
| 63 | Supply & fix in replacement lamp holder, PVC/Polycarbonate type with back plate suitable for batten fittings complete all as specified and as directed byEngineer-in-Charge. |
| 64 | Supply & fix in replacement of ceiling rose 3 phase, PVC/Polycarbonate body complete all as specified and as directed byEngineer-in-Charge. |
| 65 | Supply & fix in replacement double door sheet metal enclosures factory made DBsprotection class IP-43, suitable for fixing of MCBs, Isolators etc, confirming to IS 13032 triple pole and neutral 4 ways with 200 Amp rated bus bar 415 volts powder coatedcomplete all as specified and as directed byEngineer-in-Charge. |
| 66 | All as per item No. 60 above but SPN 8 way with 200 Amp rated busbar complete all as specified and as directed byEngineer-in-Charge. |
| 67 | All as per item No 60 above but SPN, 4 way complete all as specified and as directed byEngineer-in-Charge. |
| 68 | Supply & fix in replacement of isolators, MCBs, etc. In distribution board of the following rating and capacities complete all as specified and as directed byEngineer-in-Charge |
| 69 | MCB TPN 415 volts 63 Amps Capacity, 10 KA |
| 70 | MCB TPN 415 volts 100 Amps Capacity, 10 KA |
| 71 | MCB SPN of 240 volts 20/32/40 Amps Capacity, \"C\" series, 10 KA |
| 72 | MCBSP of 240 volts 5-40 Amps Capacity, \"C\" series, 10 KA |
| 73 | Material & labour for earthing complete with galvanised steel earth plate electrode 60cmx60cm x 6 mm thick buried directly in ground vertically to depth not less than 2.25 mtr below ground level with top edge of earth plate at a depth not less than 1.5 mtr below ground level connected to galvanised earth lead wire 4.0mm dia by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No. 3 connected to earthing test point all as specified or indicated including testing on completion provn of GI protectionpipe light grade of 32mm bore upto 7.5m length and connected earth wire to earthing test point all as shown in electrical plate No. 3 of SSR Part - I 2009 and as specified or indicatedand testing on completion including necessary excavation & earthwork in any type of soil, PCC (1:3:6) type C1 chamber, precast slab 50mm thick in cement concrete (1:2:4)type B1 (rein forced with welded steel wire fabric (XPM) of weight not less than 4kg/sqm) with frame, funnel with watering pipe of 20mm bore medium grade, wire mesh and lugs test point etc complete all as specified and as directed byEngineer-in-Charge. |
| 74 | Supply & fix in replacementmetal clad enclosure pole and neutral with a two pin and earth plug and socket complete with one single pole MCB of 20 Amps complete all as specified and as directed byEngineer-in-Charge. |
| 75 | Supply andfixing tamper proof single phase AC KWH meter10-60 Amps with following features including sealing and sealing wire, Class – 1 accuracy as per IS 13779, 240V, 50HZ LCD display, forward energy recording irrespective of current direction,LED indication for earth leakage, elegant polycarbonate enclosure high surge with stand up to 8 KV anti temper feature. Measures & displays KWh complete all as specified and as directed byEngineer-in-Charge. ( Note: Old unserviceable elect meter will be deposited in MES store yard). |
| 76 | Supply & fix wall mounted fan 400 mm sweep, 240 volts osillating type study, copper winding and heavy duty PVC blades for higher air dilivery nickel chrom plate guard, smooth oscillation complete in exisiting wall etc complete all as specified and directed by Engineer-in-Charge. ( Note: Old unserviceable wall mounted fan will be deposited in MES store yard). |
| 77 | Supply & fix in replacementenergy saving ceilling fan 1200mm sweep, super air delivery, high speed, 5 star rate, 5 years warrenty, 210 CFM with brushless direct current motor (BLDC) and connecting up including provision of cable from ceilling roseor connectorto fan and complete all as specified and as directed byEngineer-in-Charge. (Note:- Old unserviceable Ceiling fan deposit in AGE E/M store yard) |
| 78 | Note for above subject work:- Minimum02 Electricians will be attended the office of AGE E/M GE (AF) Bhuj from 0900 hrs to 1700 hrs(Except Gazetted / Weekly holidays) for attending day to day complaints/work of subject work contract as directed by JE (E/M) . |