|
| 1 | (i)Sulphur Furnace scrubber from M.S. Plate from 10mm (including all connections with pipe lines) complete jobs D, F & E |
| 2 | (ii)Replacement of cooling pipes of Scrubber. |
| 3 | (iii) Top Cover of Scrubber. |
| 4 | Sulphur Furnace melter/ receiver from M.S. Plate from 10mm (including all connections with pipe lines)A) Dismantling |
| 5 | B) Fabrication |
| 6 | C) Erection |
| 7 | Juice heater outer shell from MS plate 10mmA) Dismantling |
| 8 | B) Fabrication |
| 9 | C) Erection |
| 10 | i) Fabrication & Erection of mud mixture shaft side plates with proper Alignment |
| 11 | ii) Fabrication & Erection of bottom curved portion of mud mixture with proper Alignment |
| 12 | (i)clarifier inside compartment coil from M.S. Pipe 5\" with all nipple, flanges etc. complete job (as where it is)A)Dismantling |
| 13 | B) Fabrication |
| 14 | C) Erection |
| 15 | (ii)Replacement of Stirrers arms of clarifier |
| 16 | Dismantling, Fabrication & erection of distance piece of diameter 400mm. Upto 1.5-meter length (M.S. Plate 8mm). |
| 17 | 500 mm up to 1.5-meter length (M.S. Plate 8mm). |
| 18 | 600 mm up to 1.5-meter length (M.S. Plate 8mm). |
| 19 | 700 mm up to 1.5-meter length (M.S. Plate 8mm). |
| 20 | 800 mm up to 1.5-meter length (M.S. Plate 8mm). |
| 21 | 900 mm up to 1.5-meter length (M.S. Plate 8mm). |
| 22 | (i)Dismantling, Fabrication & Erection of Juice Heater (top & bottom) compartment partition plate with rubber fitting channels from M.S/EN-8 square bar & rubber strip fitting to make it leak proof (to avoid short circuiting) |
| 23 | (ii) Replacementof compartments partition plates of Juice Heater.(a) Top |
| 24 | (b) Bottom |
| 25 | PANBody Shell from M.S Plate 12mm A) Dismantling |
| 26 | B) Fabrication |
| 27 | C) Erection |
| 28 | Top cone from M.S Plate 12mmA) Dismantling |
| 29 | B) Fabrication |
| 30 | C) Erection |
| 31 | Umbrella from M.S Plate 10mmA) Dismantling |
| 32 | B) Fabrication |
| 33 | C) Erection |
| 34 | Down Take from M.S Plate 12mmA) Dismantling |
| 35 | B) Fabrication |
| 36 | C) Erection |
| 37 | Save all of PANs(i) Complete Jobs from M.S. Plate 10mm and 8mm plate.A) Dismantling |
| 38 | B) Fabrication |
| 39 | C) Erection |
| 40 | (ii) Outer shell (D,F & E) |
| 41 | (iii) Inner portion (D,F & E) |
| 42 | (iv) Top cover (D, F & E) with strengthening |
| 43 | (a) Syrup/ Molasses tank from M.S plate 8mmA) Dismantling |
| 44 | B) Fabrication |
| 45 | C) Erection |
| 46 | b) Patch work of Syrup/ Molasses storage tanks of all PANs. |
| 47 | Replacement of worn-out of M.S. Runner of inter carrier, elevator, RBC, cross carrier & Cane Carrier Chains. |
| 48 | Replacement of rail line of cane unloader with 50mm square bar |
| 49 | Molasses Storage Tank(a) Replacement of worn out body shell of final molasses storage tank with M.S. Plate |
| 50 | (b) Patch work of Molasses storage tanks. |
| 51 | Dismantling, Fabrication & Erection of Suction Pipes of injection pumps |
| 52 | Dismantling, Fabrication & erection of cooling coils including connection pipe of Crstallizers |
| 53 | Replacement of worn-out ducting of boiler & APCD including angle, channel, Flats & Flanges |
| 54 | Replacement of side plates of cane carrier chain/RBC/cross elevator/Baggasse elevator |
| 55 | Replacement of trough RBC/ trough cross elevator/ trough Bagasse Elevator |
| 56 | Mill house screw conveyor assembly (complete with bearings) A) Dismantling |
| 57 | B) Fabrication |
| 58 | C) Erection |
| 59 | Mill house screw conveyor trough only |
| 60 | Dismantling, Fabrication & Erection both top juice receiving tanks and bottom drain tanks of DSM screen |
| 61 | Replacement of worn out portion of APCD includes casing/scrubber and flue gas entry connected to chimney portion etc. |
| 62 | Cane Cutter hood and chopper top platefrom 12mm thick M.s plate A) dismantling |
| 63 | B) Fabrication |
| 64 | C) Erection |
| 65 | Dismantling , Fabrication & Erection of worn out portion of Chute cane carrier to 1st mill |
| 66 | Dismantling , Fabrication & Erection of Juice Tray of mill No. 1 & 2 from M.S. plate8mm |
| 67 | 10mm |
| 68 | Dismantling , Fabrication & Erection of Juice Tray of mill No. 1 & 2 from S.S. plate6mm |
| 69 | 8mm |
| 70 | Repair of rotary baggase feeders of boilers A) Body |
| 71 | B) Rotor |
| 72 | Replacement of casing of boiler (both plate & supporting angle) |
| 73 | (a) Replacement of Magma mixture body including driving units in all aspects (Complete Job).A- magma |
| 74 | B- magma |
| 75 | (b) Shell of A, B & C magma mixers. |
| 76 | Replacement of worn out portion of crystallizer body |
| 77 | Repair and fitting of bush to Crystallizer\"s Central shaft |
| 78 | Replacement of worn out condensate receiving bottles |
| 79 | Replacement of worn out down take of quad |
| 80 | Dismantling, Fabrication & Erection of Dorr\"s scrapper (complete job). |
| 81 | I.D Fan worn out casting of both boilers A) Dismantling |
| 82 | B) Fabrication |
| 83 | C) Erection |
| 84 | Replacement of the expansion joints of boilers |
| 85 | Replacement of worn out ducting the boilers |
| 86 | Erection and Fabrication of any thing from scrap |
| 87 | Replacement of (i) S.S ventury of Condensor |
| 88 | (b) Cone of condensor from S.S plate |
| 89 | Replacement of tail pipe of pan |
| 90 | Replacement of inter carrier side plates |
| 91 | Replacement of scrapper bar side plates size :- 1 meter square |
| 92 | Replacement of the casing of air heater |
| 93 | Replacement of condenser jet box |
| 94 | Replacement of the bottom curved portion of pug mill (centrifugal machine) |
| 95 | Replacement of the outer shell of the clarifier |
| 96 | Replacement of the worn-out portion of cane carrier |
| 97 | D.F. & E. Of shaft & string pedals of (i) A- massecuite pugmill |
| 98 | (ii) B- massecuite pugmill |
| 99 | a) Conversion of B& C double cured crystallizers as A-vacuum crystallizer with complete shell fabrication, erection alongwith drives and commissiong of the crystallizer with satisfactory trials. |
| 100 | a) Replacement of broken arms of Dry seed cryst. |
| 101 | a) Replacement of dropping Massecuite gutter of A-, B- & C of PANs |
| 102 | b) Replacement of Massecuite gutter of Crystallizers |
| 103 | (PART B) (General) Pipe Line M.S 1\" to 12\" diaa) Dismantling |
| 104 | b) Erection |
| 105 | Pipe Line M.S above 12\"\" dia upto 32\". (other than vapour pipe of pan and quadA) Dismantling |
| 106 | B) Fabrication |
| 107 | C) Erection |
| 108 | Pipe Line S.S 1\" TO 12\" diaA) Dismantling |
| 109 | b) Erection |
| 110 | Pipe Line C.I. 1\"\" TO 12\" diaA) Dismantling |
| 111 | B) Erection |
| 112 | Steam Pipe Line 1\" to 12\" diaA) Dismantling |
| 113 | b) Erection |
| 114 | Steam Pipe Line bendsA) Dismantling |
| 115 | b) Erection |
| 116 | A) Bend M.S upto 12\" diaa) Dismantling |
| 117 | b) Fabrication |
| 118 | c) Erection |
| 119 | B) Bend M.S. above 12\" dia up to 32\" dia |
| 120 | Welding joints of Water, Juice, Vapour and Exhaust Pipe Line of all sizes |
| 121 | Man hole of all sizes a) Dismantling |
| 122 | B) Fabrication |
| 123 | C) Erection |
| 124 | Flangesa) Dismantling |
| 125 | b) Fabrication |
| 126 | c) Erection |
| 127 | Tee/ Nipple/ Cross/ Reducers (M.S)a) Dismantling |
| 128 | b) Fabrication |
| 129 | c) Erection |
| 130 | Dismantling, Fabrication and Erection of a) M.S Coil |
| 131 | b) M.S Steam Coil |
| 132 | PlatformA) Dismantling |
| 133 | B) Fabrication |
| 134 | C) Erection |
| 135 | M.S Structure work (Factory Building) a) Dismantling |
| 136 | b) Fabrication |
| 137 | c) Erection |
| 138 | D, F & E of M.S. Tank having round, concial & rectangular bottoms (other than ms tank of syrup and molasses)(i) Syrup Extraction bottles of Pumps. |
| 139 | (ii) Catchers of Juice Pumps. |
| 140 | (iii) Molasses run off tanks of machies. |
| 141 | Trusses, Perlins, Columns & Beams (Factory Building) a) Dismantling |
| 142 | b) Fabrication |
| 143 | c) Erection |
| 144 | Platform Pipe Line & Railing of all sizesA) Dismantling |
| 145 | b) Erection |
| 146 | Electric Panel, DB and other machinery shed GI/ACC/MS Sheet a) Dismantling |
| 147 | B) Fabrication & Erection |
| 148 | Dismantling, Fabrication and Erection of Pump and Motor Bed a) Below 15 H.P. Motor |
| 149 | b) Above 15 H.P Motor |
| 150 | Valves:-Sluice/Angle/N.R.V/Butterfly Type a) Dismantling |
| 151 | b) Erection |
| 152 | Vapour/ Exhaust pipe Line of quad and pan from M.S. plate (8mm) a) Dismantling |
| 153 | B) Fabrication |
| 154 | C) Erection |
| 155 | Cone from M.S Plate (10mm) upto 1.5 meter mean dia.A) Dismantling |
| 156 | B) Fabrication |
| 157 | C) Erection |
| 158 | Gutter from M.S. plate 5mm of centrifugal machine.a) Dismantling |
| 159 | B) Fabrication |
| 160 | C) Erection |
| 161 | Sight Glass a) Replacement |
| 162 | Crystallizer Slide gatea) Dismantling |
| 163 | B) Fabrication |
| 164 | C) Erection |
| 165 | Vapour pipe bend of Quad & PanA) Dismantling |
| 166 | B) Fabrication |
| 167 | C) Erection |
| 168 | a) Patch work of B.H equipment\"s |