|
| 1 | Providing CC Pavement at Sappani Madasamy kovil street in Therku Medu panchayat in Shenkottai Panchayt Union15 th Finance Commission-2022-23 |
| 2 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 3 | Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete. |
| 4 | Construction ofCulvert Across Sathiyan Oorani Supply Channel in Puliyarai Panchayat. Union General Fund -2023-24 |
| 5 | For Shuttering - Below Sill Level |
| 6 | For Shuttering - Above Sill Level |
| 7 | For Shuttering - Above Sill Level |
| 8 | For Deck Slab Centering |
| 9 | Cement concrete 1:2:4 mix using 20mm ISS metal including top Finish using Trowel Machine with necessary Genset Arrangements including all cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. |
| 10 | RCC Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. |
| 11 | For Shuttering - Above Sill Level |
| 12 | For Shuttering - Above Sill Level |
| 13 | For Deck Slab Centering |
| 14 | Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with standard specification. |
| 15 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. |
| 16 | Refilling the basement with excavated earthother than Sandcomplying the Standard specification |
| 17 | Wearing coat 1:1.5:3 mix using 65% of 25mm metal, 25% of 12mm metal & 10% of 6mm metal including all cost and conveyance and all labour charges etc., complete. |
| 18 | Refilling the basement with excavated earthother than Sandcomplying the Standard specification |
| 19 | Wearing coat 1:1.5:3 mix using 65% of 25mm metal, 25% of 12mm metal & 10% of 6mm metal including all cost and conveyance and all labour charges etc., complete. |
| 20 | GST Amount for providing Service to Government Contract Works for the above RENEWALWorks. { GST Amount is the Total GST Amount for overall quoted amountabove this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |