| 1 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area |
| 2 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed a) Ordinary Soil |
| 3 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed b) Hard Soil |
| 4 | Rubblepackingwithhardlateritestoneunder floors including watering rammingand consolidating etc. in pipeline trenches and other foundations complete. |
| 5 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 m and all lifts and disposal of surplus earth as directed by Engineer in Charge |
| 6 | Cutting the bituminous road for laying the pipeline in trenches for a width of 0.6m including labour , tools etc, and disposing the excavated excess material from the trench to a distance of 1000 metres, including making level the trench surface by utilising the serviciable material to the level of the top surface of road, by compacting, watering ramming with rolling with road roller after completion of laying of pipe and refilling the trenches etc. complete as per the direction of engineer incharge.By Manual means Rural Roads |
| 7 | Repairs and reinstatement to the road for trenches made by laying water supply pipeline, by removing the refilled material in the trench for the total depth of 0.40m and making good the road surface by providing laying rolling by road roller compacting for laterite soling 30cm thick, two layer of full grout of 50mm thick each as per specifications mentioned in item no 14086 of road GSR, complete as per the direction of the engineer incharge.Rural road. |
| 8 | Supplying at store or site of work including loading, unloading and stacking at site PVC (RING FIT) pipes with elastomeric scaling ring (one per pipe) and with rubber ring socket,conforming to IS:4985 2000 and bearing ISI mark Class 6kg/sq.cm WITH EXCISE DUTY.Outer Dia in 225mm. |
| 9 | Conveying carefully from stack at site, 250m from both sides rolling and lowering in trenches, laying true to line and level and perfect linking for joints for P.V.C / H.D.P.E complete in all respects as per the direction of the engineer in-charge - 200mm Outer Dia. |
| 10 | Construction of manhole rectangular in shape including cement concrete 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) foundation thickness of concrete 20cms and offset 10cms on both sides and first class brick work with bricks class designation 100kg/sq.cm (wire cut bricks) cement mortar 1:3 (1 cement : 3 coarse sand) 23cms thick including providing & fixing CI footrests confirming to IS 5445/69 or revised and whose weight shall not be less than 5.30kgs including fixing in man-hole at 30cm c / c in 20x 20x10cm cement concrete block 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) and 12mm thick plaster inside and outside with cement mortar 1:3 (1 cement : 3 coarse sand) including adding waterproofing compound of approved brand in cement mortar with a floating coat of neat cement and making channel in cement concrete 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 20m nominal size) neatly finished complete as per standard design. |
| 11 | Extra/Additional depth of above square/ rectangular manholes at above item no in fractions with 100kg/sq.cm(wire cut bricks) brickwork in cement morter 1:3 (1cement:3coarse sand) 23cm thick including providing and fixing CI footrests not weighing less than 5.30kgs incl. fixing in manholes @ 30cmc/c staggered in 20x20x10cm cement concrete blocks 1:3:6(1cement:3coarse sand :6graded stone aggregate 20mm nominal size) 12mm thick plaster inside and outside with cement morter 1:3 (1cement :3coarse sand)including adding water proofing compound of approved brand with a floating coat of neat cement 0.90 x 0.60m Manholes. |
| 12 | Making connections of drain or sewer line with existing manholes including Breaking and making good the walls, floors with cement concrete 1:2:4 (1 cement :2 coarse sand :4 graded stone as ggrt. 20mm nominal size) 12mm thick cement plaster on both sides with cement plaster on both sides with cement mortar 1:3 (1 cement :3 coarse sand) finished with floating coat of neat cement and making necessary channels for drains etc. complete.For pipes 250 to 300 mm dia |
| 13 | Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level. |
| 14 | Providingandlayingcementconcrete 1:3:6(1cement:3 coarsesand:6gradegraniteorbasalticstone20mmnominal size) including centering shuttering and form work for encasingaroundS.W/PVCpipes includingbedconcreteasper standard design inIS:4127 0 -230mm dia S.W/P.V.C. Pipes. |