| 1 | Replacement of 44.45mm. OD. x 3.66 mm.thick Super Heater Coil of WIL Boiler Cap. 30 Ton/ hr. The work schedule- Dismantling, Fabrication and erection with Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 2 | Dismantling, Fabrication and erection of Seamless nipple of 44.45 mm. OD. x 4.06 mm. Thick. x 150 mm. long (With Supply) of W.I.L./Taxmaco/VKW Boiler. |
| 3 | Dismantling, Fabrication and erection of Seamless nipple of 76.2 mm. OD. x 4.06 mm. Thick. x 150 mm. long (With Supply) of Boiler. |
| 4 | Dismantling, Fabrication and erection of Seamless nipple of 82.5 mm. OD. x 3.66 mm.Thick. x 150 mm. long of VKW. Boiler.(a) with supply |
| 5 | (b) without supply |
| 6 | Dismantling, Fabrication and fitting of 3” NB Schedule 40circulation Tube of 30 TPH Texmaco Boiler with Hydraulic Testing at Desire pressure and Approval from Director Of Boiler’s Uttrakhand. |
| 7 | Rate of per welding joint of boiler tubes(a) 44.5mm.OD |
| 8 | (b) 63.5mm.OD |
| 9 | (c) 70.0mm.OD |
| 10 | (d) 76.2mm.OD |
| 11 | (d) 82.5mm.OD |
| 12 | Replacement of old & worn out Fins type economizer coils of WIL Boiler 30Ton/Hr by New supplied coilsas per side requirement complete IBR Norms. |
| 13 | Supply of New Fins type Economizer Coils of WIL Boiler As per drawing. |
| 14 | Replacement of 63.5mm. OD x 3.66mm.Thick drum to drum tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 15 | Replacement of 70mm. OD x 4.06mm.Thick Screen tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 16 | Replacement of 70mm. OD x 4.06mm.Thick Side wall tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 17 | Replacement of 70mm. OD x 4.06mm.Thick Roof Tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 18 | Replacement of 76.2mm. OD x 4.06mm.Thick Relief Tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 19 | Replacement of 76.2mm. OD x 4.06mm.Thick Circulation Tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 20 | Replacement of 76.2mm. OD x 4.06mm.Thick Front Bank Tube of Taxmaco Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 21 | Supply of10\" NB x SCH- 100 x 8 meter Long Front Header with Niples of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 22 | Replacement of 82.5mm. OD x 3.66mm.Thick Tube of VKW Boiler Cap.13.5Ton/Hr., 12 to 15meter long each. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 23 | Supply of Worn Out/week 101.6mm. O.D. x 4.06mm. Thick x 2meter long gilled type economizer tube, bend with MS Fins & both side flange of VKW Boiler Cap.13.5Ton/Hr. Theinclude dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 24 | -do- Without Supply |
| 25 | Supply of new steam bend 101.6mm. OD x 4.06mm.Thick for VKW economizer according to IBR Norms. |
| 26 | Supply ofFlange 101.6mm. OD x 4.06mm.Thick for VKW economizer according to IBR Norms. |
| 27 | Dismantling, Febrication & Erection of Steam Line according to IBR Norms |
| 28 | Dismantling, Febrication & Erection of Bend of Steam Line according to IBR Norms |
| 29 | Dismantling, Febrication & Erection of Flange of Steam Line according as per IBR Norms |
| 30 | Replacement of 76.2mm. OD x 4.06mm.Thick Riser Tube of Taxmaco Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |
| 31 | Replacement of 82.5mm. OD x 3.66mm.Thick Curculation tube of Taxmaco Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand. |