Rural Development Government Departments Closing in 0 days TDR #37680339

Tender For Harur Block/Sids-2022-2023/P28 1.Repairs To Rcc Roof School Building At Pues At Kelaparai (North Facing), H/O. Ellapudayampatti 2.Repairs To Rcc Roof School Building At Pues At Kelaparai (East Facing North Side Building), In. Ellapudayam

Issued by Government Departments · harur, Tamil Nadu
Tender Value
9.56 Lakhs
Estimated cost
Bid Submission
31 May 2023
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
harur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tn04-03-28 / Harur Block / Sids 2022-20231. Repairs To Rcc Roofschool Building At Pues At Kelaparai ( North Facing ) , H / O. Ellapudayampatti ( 3 Class Room ) 2. Repairs To Rcc Roofschool Building At Pues At Kelaparai ( East Facing North Side Building ) , H / O. Ellapudayampatti

BOQ

Name of Work:TN04-03-28/ Harur Block / SIDS 2022-20231. Repairs to RCC roofschool building at PUES at Kelaparai (North facing), H/o. Ellapudayampatti (3 Class room)2. Repairs to RCC roofschool building at PUES at Kelaparai (East facing North side building), H/o. Ellapudayampatti
Sl. No. Item Description
1Repairs to RCC roofschool building at PUES at Kelaparai (North facing), H/o. Ellapudayampatti (3 Class room)
2Dismantiling the damaged Pressed tiles in cement mortorincl all labour chagres etc.,
3Providing Granolothic Floor finish ISS Metal to 50mm thick including cost and conveyance of all materials to site and all labour charges etc complete
4Finishing the Top of roof with one course pressed tilesincluding cost and conveyance of all materials to site and all labour charges etc complete
5Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification
6Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification
7Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
8Painting the old wood works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
9Provision for Cubboard with locking facility for teachers ( No.1)
10Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
11Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
12Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
13Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
14Providing Cubboard Shutter with frame using water proof plywood of 19mm thick over which laminated sheet 0.8mm thick fix with inside shutter (Sl.No.124)
15Provision for Cubboard with locking facility for teachers ( No.2)
16Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
17Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
18Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
19Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
20Providing Cubboard Shutter with frame using water proof plywood of 19mm thick over which laminated sheet 0.8mm thick fix with inside shutter (Sl.No.124)
21Provision for Cubboard with locking facility for teachers ( No.3)
22Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
23Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
24Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
25Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
26Providing Cubboard Shutter with frame using water proof plywood of 19mm thick over which laminated sheet 0.8mm thick fix with inside shutter (Sl.No.124)
27Provision for Cubboard for Students inside of Class Room ( No.1)
28Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
29Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
30Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
31Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
32Provision for Cubboard for Students inside of Class Room ( No.2)
33Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
34Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
35Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
36Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
37Provision for Cubboard for Students inside of Class Room ( No.3)
38Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
39Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
40Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
41Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
42Provision for Chappal rack outside the class room (No.1)
43Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
44Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
45Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
46Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
47Provision for Chappal rack outside the class room (No.2)
48Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
49Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
50Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
51Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
52Provision for Chappal rack outside the class room (No.3)
53Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
54Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
55Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
56Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
57Provision for Pedestal for Drinking Water Arrangements
58Earth Work excavation and deposting on bank intial lift of 2mm in all classus of soil as per SS20B
59CC 1:4:8 mix using 40mm ISSHBG Metal incl cost and conveyance of all materials to site and all labour charges etc complete
60Brick Work in CM 1:5 Mix using Country bricks ground moulded size 23 x 11 x 7 cum includingcost and conveyance of all materials to site and all labour charges etc complete
61Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
62Painting two coats with emulsion paint over the one coat of priming coatincludingcost and conveyance of all materials to site and all labour charges etc complete
63Supply, Delivery and fixing of 500 ltr HDPE Tank including cost and conveyance charges etc., complete.
64Provision for Pipe Line arrangements incl cost and conveyance charges etc., complete.
65Provision for Fibe Board
66Provision for Bala Paintings
67Provision for Electrification Arrangments
68Provision for Fan 1200mm SD110
69Provision for 3 Nos 15 AMPS (3 Pin and 2 Pin ) SD No. 40
70Provision for Light
71Provision for Name Board
72Repairs to RCC roofschool building at PUES at Kelaparai (East facing North side building), H/o. Ellapudayampatti
73Dismantiling the damaged Pressed tiles in cement mortorincl all labour chagres etc.,
74Providing Granolothic Floor finish ISS Metal to 50mm thick including cost and conveyance of all materials to site and all labour charges etc complete
75Finishing the Top of roof with one course pressed tilesincluding cost and conveyance of all materials to site and all labour charges etc complete
76Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification
77Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification
78Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
79Provision for Cubboard with locking facility for teachers ( No.1)
80Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
81Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
82Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
83Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
84Providing Cubboard Shutter with frame using water proof plywood of 19mm thick over which laminated sheet 0.8mm thick fix with inside shutter (Sl.No.124)
85Provision for Cubboard with locking facility for teachers ( No.2)
86Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
87Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
88Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
89Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
90Providing Cubboard Shutter with frame using water proof plywood of 19mm thick over which laminated sheet 0.8mm thick fix with inside shutter (Sl.No.124)
91Provision for Cubboard for Students inside of Class Room ( No.1)
92Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
93Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
94Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
95Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
96Provision for Cubboard for Students inside of Class Room ( No.2)
97Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
98Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
99Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
100Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
101Provision for Chappal rack outside the class room (No.1)
102Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
103Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
104Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
105Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
106Provision for Chappal rack outside the class room (No.2)
107Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
108Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
109Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
110Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
111Provision for Pedestal for Drinking Water Arrangements
112Earth Work excavation and deposting on bank intial lift of 2mm in all classus of soil as per SS20B
113CC 1:4:8 mix using 40mm ISSHBG Metal incl cost and conveyance of all materials to site and all labour charges etc complete
114Brick Work in CM 1:5 Mix using Country bricks ground moulded size 23 x 11 x 7 cum includingcost and conveyance of all materials to site and all labour charges etc complete
115Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
116Painting two coats with emulsion paint over the one coat of priming coatincludingcost and conveyance of all materials to site and all labour charges etc complete
117Supply, Delivery and fixing of 500 ltr HDPE Tank including cost and conveyance charges etc., complete.
118Provision for Pipe Line arrangements incl cost and conveyance charges etc., complete.
119Provision for Fibe Board
120Provision for Bala Paintings
121Provision for Electrification Arrangments
122Provision for Fan 1200mm SD110
123Provision for 3 Nos 15 AMPS (3 Pin and 2 Pin ) SD No. 40
124Provision for Light
125Provision for Name Board
126GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}

AI Tender Summary

OUR REF NO 37680339
AUTHORITY Government Departments
TENDER VALUE 9.56 Lakhs
LAST DATE 31-05-2023
Authority
Authority Name Rural Development Department
Work Description Tn04-03-28 / Harur Block / Sids 2022-20231. Repairs To Rcc Roofschool Building At Pues At Kelaparai ( North Facing ) , H / O. Ellapudayampatti ( 3 Class Room ) 2. Repairs To Rcc Roofschool Building At Pues At Kelaparai ( East Facing North Side Building ) , H / O. Ellapudayampatti
Basic Detail
Tender No Roc.No.1342/2023/A2/Harur Block/SIDS-2022-23/P28
Bidding Type Tender
Location
City harur
State Tamil Nadu
Key Dates
Publish Date 15 May 2023
Submission Date 31 May 2023
Open Date 31 May 2023
Finance
Tender Value 9.56 Lakhs
Tender Fee Ref. Documents
EMD 10000
Exemption Not Available
Document List
60bcbbdf-037e-4898-a9b0-1dc9845a15cd.html
28.pdf
BOQ_374241.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 15, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
May 31, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 31, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

60bcbbdf-037e-4898-a9b0-1dc9845a15cd.html

pdf

28.pdf

xls

BOQ_374241.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders