Rural Development Government Departments Closing in 0 days TDR #37680294

Tender For Harur Block/Sids-2022-2023/P30 1.Repairs To Rcc Roof School Building At Pums At Vallimadurai, (3 Class Room) H/O. Keeraipatti 2.Repairs To Rcc Roof School Building At Pums At Vallimadurai, (2 Class Room) H/O. Keeraipatti - South Faci

Issued by Government Departments · harur, Tamil Nadu
Tender Value
9.34 Lakhs
Estimated cost
Bid Submission
31 May 2023
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
harur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

1.Repairs To Rcc Roof School Building At Pums At Vallimadurai, ( 3 Class Room ) H / O. Keeraipatti 2.Repairs To Rcc Roof School Building At Pums At Vallimadurai, ( 2 Class Room ) H / O. Keeraipatti - South Facing

BOQ

Name of Work:TN04-03-30/ Harur Block / SIDS 2022-20231. Repairs to RCCroofschool building at PUMS at Vallimadurai, (3 Class room)H/o. Keeraipatti 2. Repairs to RCCroofschool building at PUMS at Vallimadurai, (2 Class room)H/o. Keeraipatti - South facing
Sl. No. Item Description
1Repairs to RCCroofschool building at PUMS at Vallimadurai, (3 Class room)H/o. Keeraipatti
2Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification
3Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification
4Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
5Provision for Cubboard with locking facility for teachers ( No.1)
6Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
7Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
8Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
9Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
10Providing Cubboard Shutter with frame using water proof plywood of 19mm thick over which laminated sheet 0.8mm thick fix with inside shutter (Sl.No.124)
11Provision for Cubboard with locking facility for teachers ( No.2)
12Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
13Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
14Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
15Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
16Providing Cubboard Shutter with frame using water proof plywood of 19mm thick over which laminated sheet 0.8mm thick fix with inside shutter (Sl.No.124)
17Provision for Cubboard with locking facility for teachers ( No.3)
18Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
19Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
20Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
21Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
22Providing Cubboard Shutter with frame using water proof plywood of 19mm thick over which laminated sheet 0.8mm thick fix with inside shutter (Sl.No.124)
23Provision for Cubboard for Students inside of Class Room ( No.1)
24Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
25Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
26Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
27Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
28Provision for Cubboard for Students inside of Class Room ( No.2)
29Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
30Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
31Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
32Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
33Provision for Cubboard for Students inside of Class Room ( No.3)
34Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
35Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
36Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
37Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
38Provision for Chappal rack outside the class room (No.1)
39Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
40Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
41Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
42Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
43Provision for Chappal rack outside the class room (No.2)
44Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
45Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
46Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
47Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
48Provision for Chappal rack outside the class room (No.3)
49Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
50Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
51Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
52Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
53Provision for Pedestal for Drinking Water Arrangements
54Earth Work excavation and deposting on bank intial lift of 2mm in all classus of soil as per SS20B
55CC 1:4:8 mix using 40mm ISSHBG Metal incl cost and conveyance of all materials to site and all labour charges etc complete
56Brick Work in CM 1:5 Mix using Country bricks ground moulded size 23 x 11 x 7 cum includingcost and conveyance of all materials to site and all labour charges etc complete
57Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
58Painting two coats with emulsion paint over the one coat of priming coatincludingcost and conveyance of all materials to site and all labour charges etc complete
59Supply, Delivery and fixing of 500 ltr HDPE Tank including cost and conveyance charges etc., complete.
60Provision for Pipe Line arrangements incl cost and conveyance charges etc., complete.
61Provision for Fiber Board
62Provision for Bala Paintings
63Provision for Electrification Arrangments
64Provision for Fan 1200mm SD110
65Provision for 3 Nos 15 AMPS (3 Pin and 2 Pin ) SD No. 40
66Provision for Light
67Provision for Name Board
68Repairs to RCCroofschool building at PUMS at Vallimadurai, (2 Class room)H/o. Keeraipatti - South facing
69Dismantiling the Damaged Tiles in Cement Mortar incl all labour charges etc., complete.
70Providing Granolithci Floor Finish ISS Metal to 50mm thick incl cost and conveyance of all materials at etc., complete.
71Finishing top of roof with one course of pressed tilesincl cost and conveyance of all materials at etc., complete.
72Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification
73Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification
74Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
75Provision for Cubboard with locking facility for teachers ( No.1)
76Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
77Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
78Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
79Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
80Providing Cubboard Shutter with frame using water proof plywood of 19mm thick over which laminated sheet 0.8mm thick fix with inside shutter (Sl.No.124)
81Provision for Cubboard with locking facility for teachers ( No.2)
82Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
83Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
84Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
85Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
86Providing Cubboard Shutter with frame using water proof plywood of 19mm thick over which laminated sheet 0.8mm thick fix with inside shutter (Sl.No.124)
87Provision for Cubboard for Students inside of Class Room ( No.1)
88Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
89Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
90Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
91Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
92Provision for Cubboard for Students inside of Class Room ( No.2)
93Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
94Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
95Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
96Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
97Provision for Chappal rack outside the class room (No.1)
98Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
99Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
100Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
101Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
102Provision for Chappal rack outside the class room (No.2)
103Brick Work in CM 1:5 Mix using Country bricks 83/4\"\" x 41/4\"\" x 23/4\"\" of Sizeincludingcost and conveyance of all materials to site and all labour charges etc complete
104Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
105Providing Cuddapa Slab 20/30 mm thick over a bed concrete 100mm thick and pointed with cement mortor 1:3 mixincludingcost and conveyance of all materials to site and all labour charges etc complete
106Distempering two coats with best approved distember includingcost and conveyance of all materials to site and all labour charges etc complete
107Provision for Pedestal for Drinking Water Arrangements
108Earth Work excavation and deposting on bank intial lift of 2mm in all classus of soil as per SS20B
109CC 1:4:8 mix using 40mm ISSHBG Metal incl cost and conveyance of all materials to site and all labour charges etc complete
110Brick Work in CM 1:5 Mix using Country bricks ground moulded size 23 x 11 x 7 cum includingcost and conveyance of all materials to site and all labour charges etc complete
111Plastering with cement mortar 1:5 mixto 12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
112Painting two coats with emulsion paint over the one coat of priming coatincludingcost and conveyance of all materials to site and all labour charges etc complete
113Supply, Delivery and fixing of 500 ltr HDPE Tank including cost and conveyance charges etc., complete.
114Provision for Pipe Line arrangements incl cost and conveyance charges etc., complete.
115Provision for Fiber Board
116Provision for Bala Paintings
117Provision for Electrification Arrangments
118Provision for Fan 1200mm SD110
119Provision for 3 Nos 15 AMPS (3 Pin and 2 Pin ) SD No. 40
120Provision for Light
121Provision for Name Board
122GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}

AI Tender Summary

OUR REF NO 37680294
AUTHORITY Government Departments
TENDER VALUE 9.34 Lakhs
LAST DATE 31-05-2023
Authority
Authority Name Rural Development Department
Work Description 1.Repairs To Rcc Roof School Building At Pums At Vallimadurai, ( 3 Class Room ) H / O. Keeraipatti 2.Repairs To Rcc Roof School Building At Pums At Vallimadurai, ( 2 Class Room ) H / O. Keeraipatti - South Facing
Basic Detail
Tender No Roc.No.1342/2023/A2/Harur Block/SIDS-2022-23/P30
Bidding Type Tender
Location
City harur
State Tamil Nadu
Key Dates
Publish Date 15 May 2023
Submission Date 31 May 2023
Open Date 31 May 2023
Finance
Tender Value 9.34 Lakhs
Tender Fee Ref. Documents
EMD 10000
Exemption Not Available
Document List
5cbb8530-4fa9-4541-b41c-cbedd3ca8c74.html
30.pdf
BOQ_374267.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 15, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
May 31, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 31, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

5cbb8530-4fa9-4541-b41c-cbedd3ca8c74.html

pdf

30.pdf

xls

BOQ_374267.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders