Kancheepuram Municipality-agecode007 has published Tender For Providing Bt Surface To Ngo Nagar Cheetikulam St Rayankuttai Palla 1St St Packge-I. Submission Date for this Tender is 24-05-2023. Road Work Tenders in kancheepuram Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Charges for cutting the B.T surface to 5 to 7 cm depth using milling machine, conveying the Milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen item etc. complete as per the direction of the departmental officers |
2 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2kgs of bituminous Emulsion (RS)for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications |
3 | Advance Patch Work - Providing and laying 50 mm compactedthick dense bituminous macadamusing 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70bitumenfor premixing per 10 sqm including cost and conveyance of all materials toC M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with Hydro static paver finisher with sensor controlled to the required gradient and alignmentto the specified grades and cross sections and compaction byVibratory roller tothe required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30tC M P with bitumen boiler,tipper trucks, hydro static sensor controlled paver finisher, vibratory rollers and all other tools and plants required,includingall other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. |
4 | Providing and laying 50 mm compactedthick dense bituminous macadamusing 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70bitumenfor premixing per 10 sqm including cost and conveyance of all materials toC M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with Hydro static paver finisher with sensor controlled to the required gradient and alignmentto the specified grades and cross sections and compaction byVibratory roller tothe required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30tC M P with bitumen boiler,tipper trucks, hydro static sensor controlled paver finisher, vibratory rollers and all other tools and plants required,includingall other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. |
5 | Providing and laying Bituminous concrete to 30mm thickusing 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with45.27 kgs of 60/70bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) (as per IRC SB 098 ) andfor premixing per 10 sqmincluding cost and conveyance of all materials toC M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 30mm with hydro static paver finisher with sensor controled to the required gradient and alignmentto the specified grades and cross sections and compaction byVibratory roller tothe required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30tC M P with bitumen boiler,tipper trucks, sensor conroled hydro static paver finisher, Vibratory rollers and all other tools and plants required,includingall other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. |