Tender For 1) A. Renovation Of Pum School Building 3 Class Room, B.Renovation Of Pum School Building Boys Urinal In Uthukkadu Panchayat.
Tender Value
6.47 Lakhs
Estimated cost
Bid Submission
18 May 2023
0 days left
EMD
6500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
valangaiman → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
1 ) A. Renovation Of Pum School Building 3 Class Room, B.Renovation Of Pum School Building Boys Urinal In Uthukkadu Panchayat.
BOQ
| Sl. No. | Item Description |
| 1 | a.Renovation of PUM School building 3 Class Room, |
| 2 | Dismantaling of Ceiling Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 3 | Dismantaling of Cement ConcreteIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. |
| 5 | Pointing with cement mortar 1:3 to full depth of tilesusingcrudeoil 10% byweight of cementincluding cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm |
| 6 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 7 | Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. |
| 8 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mmISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum |
| 9 | Plastering with CM 1:3,10m thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 10 | Repair to Steel door and Window including all cost of convenyence,. |
| 11 | Door ( 1.20 x 2.10 m) |
| 12 | Window ( 1.20 x 1.50m ) |
| 13 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 14 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 15 | Provision For Bala Painting |
| 16 | DistemperingOnecoatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 17 | Painting two coats over Old iron works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 18 | Black Board Painting |
| 19 | Electrical Work |
| 20 | Tube light Fitting |
| 21 | Ceiling Fan |
| 22 | Providing Chappal Rack Arrangements(Sub Estimate) |
| 23 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 24 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 25 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 26 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 27 | Providing Cub boardArrangements(Sub Estimate) |
| 28 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 29 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 30 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 31 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 32 | Providing Drinking Arrangements(Sub Estimate) |
| 33 | Dismantling the Existing Damagedcement Plasteringincluding allchages etc for complete |
| 34 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 35 | Collection and supply of sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard speecifications |
| 36 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 37 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 38 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 39 | Providing granolithicfloor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum. |
| 40 | Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 41 | Provision for PVC Pipe,Tank and Tap arrangements |
| 42 | Providing for Teachers Cub Board (Sub Estimate) |
| 43 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 44 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 45 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 46 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 47 | Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 . |
| 48 | Provision for 15Amps Socket SD 40 |
| 49 | Provision for EB Box Cover |
| 50 | Provision for String Bhandle |
| 51 | Provision for information white Board |
| 52 | Provision For Name Board |
| 53 | b.Renovation of PUM school building Boys Urinal |
| 54 | Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 55 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 56 | Dismantaling of Ceramic Tiles Including all labour Charges and removing depris from the work site etc, complete.,… |
| 57 | Paving the Floor with ceramic tiles size 305x305x6mm in CM 1:3 20mm thick |
| 58 | Dadooing of walls colour glazed Tiles of size300mmx200mmx6mm including all cost andconvenyence to Site and all labour charges etccomplete,. |
| 59 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 60 | Distempering Two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 61 | Provision for leach Pit Arragements |
| 62 | Provision for Name board |
| 63 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
May 13, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedMay 18, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMay 18, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender