Rural Development Government Departments Closing in 0 days TDR #37659894

Tender For Renovation Of School Building And Toilet Sids Scheme

Issued by Government Departments · valangaiman, Tamil Nadu
Tender Value
10.01 Lakhs
Estimated cost
Bid Submission
18 May 2023
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
valangaiman → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

1 ) A.Repairs To Pum Schoolsouth Facing R C C Building At Mainroad Campus, B.Repairs To Pum Schoolnorth Facing R C C G + 1 Building, C.Repairs To Pum Schooleast Facing R C C Building At Mainroad Campus, D.Repairs To Pum School Toilet ( Girls ) At Main Road Campus, E.Repairs To Pum School Toilet ( Boys-Ii ) Main Road Campus, F. In Muniyur Panchayat.Repairs To Pum School ( Common ) Main Road Campus, G.Repairs To Pum School Toilet ( Boys ) Main Road Campusin Narthankudi Panchayat

BOQ

Name of Work: 1) a.Repairs to PUM SchoolSouth Facing R C C Building at Mainroad Campus,b.Repairs to PUM SchoolNorth Facing R C C G + 1 Building, c.Repairs to PUM SchoolEast Facing R C C Building at Mainroad Campus, d.Repairs to PUM School Toilet(Girls) at Main road Campus,e.Repairs to PUM School Toilet (Boys-II) main road Campus, f. in Muniyur Panchayat.Repairs to PUM School (Common) Main road Campus, g.Repairs to PUM School Toilet(BOYS) Main Road Campusin Narthankudi Panchayat
Sl. No. Item Description
1a.Repairs to PUM SchoolSouth Facing R C C Building at Mainroad Campus
2Dismantling the existing Damaged Grano floor area including all labour charges etc., completed
3Dismantling the existing Damagedplastering includingall labour charges etc., completed
4Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mmISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
5Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete
6Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
7Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
8Platering with CM 1:3, mix, 10mm thick including cost and conveynace and all laour charges etc., completed
9White washing two coats using shell lime including cost of materils and all labour charges etc., completed
10Distemberingone coat with best approvde distembering including cost of materils and all labour charges etc., completed
11Exterior Emulsiontwo coats with best approvde Exterior Plastic Emulsionincluding cost of materils and all labour charges etc., completed
12Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed
13Painting with Black Board Painting with Ready mixed Black board painting including cost of materils and all labour charges etc., completed
14Provision for Bala Painting
15Providing Cub boardArrangements(Sub Estimate)
16Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
17Supplying and fixing following thickness of cuddapah slab for cupboard
18Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
19Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed
20Providing for Teachers Cub Board (Sub Estimate)
21Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
22Supplying and fixing following thickness of cuddapah slab for cupboard
23Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
24Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed
25Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
26Providing Chappal Rack Arrangements(Sub Estimate)
27Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
28Supplying and fixing following thickness of cuddapah slab for cupboard
29Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
30Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed
31Providing Drinking Arrangements(Sub Estimate)
32Dismantling the Existing Damagedcement Plasteringincluding allchages etc for complete
33Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
34Collection and supply of sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard speecifications
35Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
36Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
37Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
38Providing granolithicfloor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
39Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm
40Provision for PVC Pipe,Tank and Tap arrangements
41Provision for Repair to Windows
42Provision for 15Amps Socket SD 40
43Provision for EB Box Cover
44Provision for String Bhandle
45Provision for information white Board
46Provision For Name Board
47b.Repairs to PUM SchoolNorth Facing R C C G + 1 Building,
48Dismantling the existing Damagedplastering includingall labour charges etc., completed
49Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mmISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
50Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
51Platering with CM 1:3, mix, 10mm thick including cost and conveynace and all laour charges etc., completed
52White washing two coats using shell lime including cost of materils and all labour charges etc., completed
53Distemberingone coats with best approvde distembering including cost of materils and all labour charges etc., completed
54Exterior Emulsiontwo coats with best approvde Exterior Plastic Emulsionincluding cost of materils and all labour charges etc., completed
55Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed
56Painting with Black Board Painting with Ready mixed Black board painting including cost of materils and all labour charges etc., completed
57Provision for Bala Painting
58Providing Cub boardArrangements(Sub Estimate)
59Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
60Supplying and fixing following thickness of cuddapah slab for cupboard
61Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
62Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed
63Providing Chappal Rack Arrangements(Sub Estimate)
64Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
65Supplying and fixing following thickness of cuddapah slab for cupboard
66Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
67Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed
68Providing for Teachers Cub Board (Sub Estimate)
69Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
70Supplying and fixing following thickness of cuddapah slab for cupboard
71Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
72Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed
73Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
74Providing Drinking Arrangements(Sub Estimate)
75Dismantling the Existing Damagedcement Plasteringincluding allchages etc for complete
76Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
77Collection and supply of sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard speecifications
78Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
79Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
80Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
81Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
82Providing granolithicfloor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
83Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm
84Provision for PVC Pipe,Tank and Tap arrangements
85Provision for 15Amps Socket SD 40
86Provision for EB Box Cover
87Provision for String Bhandle
88Provision for Informatio Board
89Povision For Name Board
90c.Repairs to PUM SchoolEast Facing R C C Building at Mainroad Campus
91Dismantling the existing Damaged Grano floor area including all labour charges etc., completed
92Dismantling the existing Damagedplastering includingall labour charges etc., completed
93Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mmISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
94White washing two coats using shell lime including cost of materils and all labour charges etc., completed
95DistemberingOne coat with best approvde distembering including cost of materils and all labour charges etc., completed
96Exterior Emulsiontwo coats with best approvde Exterior Plastic Emulsionincluding cost of materils and all labour charges etc., completed
97Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed
98Painting with Black Board Painting with Ready mixed Black board painting including cost of materils and all labour charges etc., completed
99Provision for Bala Painting
100Providing Cub boardArrangements(Sub Estimate)
101Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
102Supplying and fixing following thickness of cuddapah slab for cupboard
103Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
104Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed
105Providing Chappal Rack Arrangements(Sub Estimate)
106Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
107Supplying and fixing following thickness of cuddapah slab for cupboard
108Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
109Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed
110Providing for Teachers Cub Board (Sub Estimate)
111Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
112Supplying and fixing following thickness of cuddapah slab for cupboard
113Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
114Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed
115Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
116Provision for 15Amps Socket SD 40
117Provision for RWH
118Provision for String Bhandle
119Provision for Informatio Board
120Provision for Name board
121d.Repairs to PUM School Toilet(Girls) at Main road Campus,
122Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
123Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
124Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
125Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm includingcost and all other labour charges etc., completed
126Dadooing of walls colour glazed Tiles of size300mmx200mmx6mm including all cost andconvenyence to Site and all labour charges etccomplete,.
127DistemperingTwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete
128Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete
129Painting two coats over Old Iron doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta
130Precast Slab for Septic Tank
131Towards Septic tank Cleaning Charges
132Provision for Name board charges etc.,
133e.Repairs to PUM School Toilet (Boys-II) main road Campus
134Dismantling the existing Damaged Grano floor area including all labour charges etc., completed
135Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
136Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
137Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm includingcost and all other labour charges etc., completed
138Dadooing of walls colour glazed Tiles of size300mmx200mmx6mm including all cost andconvenyence to Site and all labour charges etccomplete,.
139Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed
140Exterior Emulsiontwo coats with best approvde Exterior Plastic Emulsionincluding cost of materils and all labour charges etc., completed
141Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed
142Towards Septic tank Cleaning Charges
143Provision for Sanitary Arrangements
144Towards Door Repair Charges
145Provision for Name board
146f. Repairs to PUM School (Common) Main road Campus
147Dismantling the existing Damaged Grano floor area including all labour charges etc., completed
148Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
149Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
150Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm includingcost and all other labour charges etc., completed
151Dadooing of walls colour glazed Tiles of size300mmx200mmx6mm including all cost andconvenyence to Site and all labour charges etccomplete,.
152Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed
153Exterior Emulsiontwo coats with best approvde Exterior Plastic Emulsionincluding cost of materils and all labour charges etc., completed
154Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed
155Provision for EWC etc.,
156Provision IWC etc.,
157Provision for Supply of Toilet Door
158Provision for Sanitary Arrangements
159Provision for Name board
160g.Repairs to PUM School Toilet(BOYS) Main Road Campus
161Dismantling the existing Damaged Grano floor area including all labour charges etc., completed
162Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
163Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
164Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm includingcost and all other labour charges etc., completed
165Dadooing of walls colour glazed Tiles of size300mmx200mmx6mm including all cost andconvenyence to Site and all labour charges etccomplete,.
166Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed
167Exterior Emulsiontwo coats with best approvde Exterior Plastic Emulsionincluding cost of materils and all labour charges etc., completed
168Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed
169Provision for Septic Tank Cleaning Charges
170Provision for Door Repair
171Provision for Name board
172GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}

AI Tender Summary

OUR REF NO 37659894
AUTHORITY Government Departments
TENDER VALUE 10.01 Lakhs
LAST DATE 18-05-2023
Authority
Authority Name Rural Development Department
Work Description 1 ) A.Repairs To Pum Schoolsouth Facing R C C Building At Mainroad Campus, B.Repairs To Pum Schoolnorth Facing R C C G + 1 Building, C.Repairs To Pum Schooleast Facing R C C Building At Mainroad Campus, D.Repairs To Pum School Toilet ( Girls ) At Main Road Campus, E.Repairs To Pum School Toilet ( Boys-Ii ) Main Road Campus, F. In Muniyur Panchayat.Repairs To Pum School ( Common ) Main Road Campus, G.Repairs To Pum School Toilet ( Boys ) Main Road Campusin Narthankudi Panchayat
Basic Detail
Tender No 1801/2023/A2 SIDS-2022-23
Bidding Type Tender
Location
City valangaiman
State Tamil Nadu
Key Dates
Publish Date 13 May 2023
Submission Date 18 May 2023
Open Date 18 May 2023
Finance
Tender Value 10.01 Lakhs
Tender Fee Ref. Documents
EMD 10000
Exemption Not Available
Document List
BOQ_373421.xls
PricebidNarthangu.pdf
TechbidNarthangu.pdf
Tendernotice_1.pdf
517cf4fa-87c7-4278-a1d6-487cf5d0c8f1.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 13, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
May 18, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 18, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_373421.xls

pdf

PricebidNarthangu.pdf

pdf

TechbidNarthangu.pdf

pdf

Tendernotice_1.pdf

html

517cf4fa-87c7-4278-a1d6-487cf5d0c8f1.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders