}

Tender For Construction Of Mini Rural Water Supply Scheme Solar Motor Pump Complete Set In Block Giridih Panchayat Sindwariya Village Kurumdiha Svs Group Of Scheme Under Jjm D.W.S. Division, No 2 Giridih For The Year 2022-23 Svs 66, giridih-Jharkhand

Drinking Water And Sanitation Department has published Tender For Construction Of Mini Rural Water Supply Scheme Solar Motor Pump Complete Set In Block Giridih Panchayat Sindwariya Village Kurumdiha Svs Group Of Scheme Under Jjm D.W.S. Division, No 2 Giridih For The Year 2022-23 Svs 66. Submission Date for this Tender is 19-05-2023. Road Work Tenders in giridih Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

37643727
Tender For Construction Of Mini Rural Water Supply Scheme Solar Motor Pump Complete Set In Block Giridih Panchayat Sindwariya Village Kurumdiha Svs Group Of Scheme Under Jjm D.W.S. Division, No 2 Giridih For The Year 2022-23 Svs 66
Open Tender
Indian
Jharkhand
giridih
19-05-2023

Tender Details

Construction Of Mini Rural Water Supply Scheme Solar Motor Pump Complete Set In Block Giridih Panchayat Sindwariya Village Kurumdiha Svs Group Of Scheme Under Jjm D.W.S. Division, No 2 Giridih For The Year 2022-23 Svs 66 , Model-1Awith Source(Drilled T/W 125/115 Dia Mm, 60M Deep) , Tube Well , Drilling Portion , Construction For 115/125 Mm Dia Drilled Tube-Well For Drilling In All Kinds Of Soil Rock For Installation Of Hand Pump With D.T.H Rig Machine All Complete Including Supplying All Materials, Labours, Tools, Drilling, Rigs, Air Compressor And Equipments As Well As Fuel Lubricant For Making 125/115 Mm Dia Boring Etcand Cost Of Transporting Rig Machine And Other Vehicle Up To Site Workas Per Specification And Direction Of Engineer-In-Charge. , (A) Up To 30Mtr. Depth Bellow G.L. In Rural Areas , (B) Beyond 30Mtr.In Rural Areas , Providing All Equipments And Labour For Lowering 125Mm Dia Blue Upvc Casing Pipe As Casing For Protecting The Side From Falling During The Process Of Drilling All Complete Job Including Carriage Of Material To Work Site. , Supplying Labour Cement And Calcium Chloride Or Bentonite Solution And Equipments For Grouting To Casing Pipe All Complete Job Including Carriage Of Material To Work Site As Per Specification & Direction Of E/I , Supplying All Tools, Equipments And Labour And Doing Washing, Flushing And Development Of Drilled Tube Well To Give Clean And Clear Water All Complete As Per Direction E/I. , Supplying All Materials Labours And Equipment Including 125 Mm Dia Gi/Ci Cap 125 Mm Dia T/W Properly All Complete And Taking It Out As Per Specification & Direction Of E/I. (The Cap Will Be Property Of Department) , Civil Portion , Supplying All Tools, Equipment, Labours And Lowering 32 Mm Dia G.I. (Medium)Pipe In Dt In 3 Mtr. Length All Complete Job As Per Direction Of E/I. Including Carriage Of Materials. , Supplying All Tools, Labour For Fitting And Fixing Deep Well Cylinder With Necessary Connecting Rod All Complete Job As Per Specification & Direction Of E/I. , Supplying All Materials, Labours For Fitting And Fixing Of India Mark Ii Hand Pump With All Accessories All Job Complete As Per Direction Of E/I. Including Carriage Of Materials. , Supplying All Materials, Labours And Equipment For Constructing Pcc (1:2:4) Circular Platform Around Each Drilled Tube Well Including 12Mm Thick Cement Plaster (1:4) With Neat Cement Punning Over Exposed Surface As Per Unicef Design Etc. All Complete. Including Carriage Of Materials. , Supplying All Materials Labour And Equipment For Constructing Pcc (1:2:4) Drain As Per Unicef Design Etc. All Complete .Including Carriage Of Materials. , Add Extra Item For Supplying Tools, Labours And Materials For Painting, Numbering And Year For Construction Of T/Well And Taking Of Colour Photograph With Two Or Three Nearest Persons Including Platform, Drain, Soak Pit And Also Longitude & Latitude, Details Of T/W Such As Total Depth, Casing Depth, Static Water Level, Drawdown, Discharge, Strata Chart, Beneficiary Population Etc In Separate Sheet/Format All Complete As Per Direction Of E/I. , Cost Of Materials , Cost Of Standard I.S.I. Mark Deep Well Hand Pump For India Mark-Ii, I.S.I. 15500 (Part 2) / 2004 With Latest Revision Including 12Mm X 3 Meter Long 8 No. Connecting Rods Made Of Bright Bar Electro-Galvanized Fitted With Coupler & Normal Stand Assembly Recommended For Use With Cylinder Assembly Suitable For Bore Wellcasing Pipe. , Cost Of 32 Mm Dia Gi Pipe (Medium) 3 Mtrs Long Screwed At Both Ends With Seamless Socket As Per Is:1239(Part 1990). , Cost Of 125 Mm Dia Blue Upvc Casing Pipe As Per I.S.12818/2016 Cml No.- 5543459 , Solar Photovoltaic (Spv) Solar Submersible D.C. Water Motor Pump , Designing, Supplying, Installation, Testing & Commissioning With All Tools & Parts Of Following Solar Photovoltaic (Spv) Solar Submersible D.C. Water Motor Pump Suitable For Minimum 125Mm X 115Mm Bore Well As Per Mnre Guideline With Following Specifications & Accessories. , Spv Arrays Contains Specified No Of Same Capacity Type & Specification Modules Connected To Series Or Parallel To Obtained The Required Voltage & Current The Power Output Of Individual Pvmodules Should Be Minimum 200 Watt Peak. , I) The Spv Modules Should Be As Per Iec-61215 And Iec 61730 Part 1.0) , Ii) All External Parts Of Motor Pump Used In Submersible Pump Which Are In Contact Of Water Is Stainless Steel Grade 303 Or Higher As Required. , Iii) The Pv Modules Shouldbe Mounted On Metallic Structure Of Adequate Strength And Appropriate Design Which Can Withstand Load Of Modules & High Wind Pressure Up To 200Km/H. , Iv) The Module Mounting Structure Should Be Hot Dip Galvanized According To Is 4759. , V) To Enhance The Performance Of Spv Water Pumping System & Arrangement For Seasonal Tilt Angle Adjustment Should Be Provided , Vi) Necessary Arrangement Should Be Provided In Controller Automatic Start-Run-Stop Through Out The Day With Water Level Detection System. (As Per Mnre Specification) , Vii) Necessary Protection Such As Lightening Arrestor Etc. Should Be Provided To Protect The Controller & Spv , Viii) The Suction/Delivery Pipe Shall Be Upvc / H.D.P.E. Pipes Of Appropriate Size 60M Or More As Required Minimum Pressure Rating Of 8Kg/Sq Cm- Pe 100 Grade For Pump Up To 3Hp & 10 Kg/Sq Cm- Pe 100 Grade For 5 Hp. , Ix) All Cable Used Shall Be As Per Is 694. Suitable Size Of Cable Shall Be Used In Sufficient Length For Inter Connection Between The Spv Array To Spv Controller And Spv Controller To Solar Power Pump. Provision Of Cable Shall Be As Per Is 14536. , X) The Motor Pump Set Should Have A 5 Years Warranty. , Xi) Control Panel Suitable For Motor Pump With Arrangement Of Dry Run & Over Flow Protection Sensor, Float Switch & Rain Prevention Box. (As Per Mnre Specification) , Xii) The Spv Controller Must Have Ip-65 Protection Or Must Be Housed In Cabinet Having At Least Ip-65 Protection. , Xiii) The System Should Be As Per Mnre Guide Line & Eco-Friendly With Suitable Arrangement To Operate New Pump Manually. , Xiv) With Third Party Inspection Before Dispatch. , Xv) Fitting, Fixing & Mounting On Water Tank Steel Structure. , Xvi) Provision For Web Basedremote Monitoring Of The Pumps To Be Installed Must Be Made Through The Inbuilt Controllers . It Should Be Possible To Ascertain The Daily Water Output, The Power Generated By Pv Array ,The Up And Downtime Of The Pump During The Year, Number Of Days The Pump Was Unused Or Under Breakdown Repairs. , The Following Details Should Be Marked Indelibly On The Motor Pump Set , A) Name Of The Manufacturer Or Distinctive Logo. , B) Model Number. , C) Serial Number. , Solar Submersible Motor Pump (Spv Dc Type) , I) 1 Hp (Dc Pump) With 900 Wp Minimum Watt P.V. Panel As Mnre Pump Head Max Shut-Off Head Up To 120 Mtrs. For Higher Or Lower Head Or In Between Various Modules Output Could Be Decided On Prorates Basis. (As Per Latest Guide Line Of Mnre) , Carrying Out Recuperation/Yield Test For Ascertaining The Discharge Of Constructed Well/ Excavated Profile As Directed By The Iec. The Testout By The Drawing Down Water From The Well/ Profile Below Normal/Subsoil Water Level Up To Full Depth Rise Is Recorded The Normal Water Level/Subsoil Water Level In The Well / Profile As Well As Strainer/Level At Pump As Per Design Of W.S. Scheme Shall Be Recorded Prior To The Test Including Cost Of All Materials, Over Load , Labours Etc. Complete As Directed. , Supplying All Labours, Tools And Equipments For Dismantling Of Head & Water Tank Assembly And Taking Out 32 Mm Dia Old G.I. Pipe, Connecting Rod, Cylinder Assembly The Dismantled Components After Necessary Changing For Making The T/W In Good Condition With All Transportation Including Unused Taken Out Materials Back In Store All Complete Job As Per Direction Of E/I. , Provision Of Solar Night Lamp. , Construction Rcc Foundation For Steel Structurestaging& Solar Panel , Earth Work In Excavation In Foundation Trenches In Ordinary Soil And Disposal Of Excavated Earth As Obtained To A Distance Up To 50.0M ,Including All Lifts, Levelling ,Ramming The Foundation Trenches, Removing Roots Of Trees, Shrubs All Complete As Per Approved Design ,Building Specification And Direction Of E/I (Vide Classification Of Soil Item -B) , Providing Coarse Clean Sand In Filling In Foundation Trenches Or In Plinth Including Ramming And Watering In Layers Not Exceeding 150Mm Thick With All Leads And Lifts Including Cost Of All Materials ,Labour ,Royalty And Taxes All Complete As Per Building Specification And Direction Of E/I(Mode Of Measurement Compacted Volume) , Providing Designation 75 A One Brick Flat Soling Joints Filled With Local Sand Including Cost Of Watering Taxes Royalty All Complete As Per Building Specification And Direction Of E/I , Providing Pcc M-150 In Nominal Mix Of (1:2:4) In Foundationwith Approved Quality Of Stone Chips 20Mm To 6Mm Size Graded And Clean Coarse Sand Of F.M.2.5To 3 Including Screening Shuttering Mixing Cement Concrete In Mixer And Placing In Position Vibrating Striking Curing And Royalty All Complete As Per Building Specification And Direction Of E/I , Providing Rcc M-200 In Nominal Mix Of (1:1.5:3) In Columnswith Approved Quality Of Stone Chips 20Mm To 6Mm Size Graded And Clean Coarse Sand Of F.M.2.5To 3 Including Screening Shuttering Mixing Cement Concrete In Mixer And Placing In Position Vibrating Striking Curing And Royalty All Complete As Per Building Specification And Direction Of E/I. , (A)Foundation For Steel Structure Staging , Footing , Vertical Pedestal , Tie Beam , (B)Foundation For Solar Panel , Footing , Vertical Pedestal , Providing For Steel Reinforcement As Per Approved Design And Drawing Excluding Carriage Of T.S. Bar To Work Site Cutting, Bending With Annealed Wire With Cost Of Wire, Removal Of Rust Placing The Rods In Position All Complete As Per Building Specification And Direction Of E/I. , 10 Mm Dia , 12 Mm Dia , Carriage Of Construction Materials To Work Site Including Loading, Unloading & Stacking Etc. All Complete. , Cement10km Lead , Steel10km Lead , Stone Chips 11Km Lead , Sand36km Lead , Bricks 06Km Lead , Construction Ofgalvanized Tubular Steel Structure Staging For (4.5M) Hdpe Water Storage Tank& Solar Panel. , Providing Structural Steel Galvanised Tubular Hollow Section Work In Trusses, Other Similar Trussed Purlins And Members With All Bracing ,Gusset Plates Etc As Per Detailed Design And Drawing Or As Directed By Engineer- In-Charge ,Including Cutting Fabricating ,Hoisting , Erecting And Fixing In Position , Making Riveted/Bolted /Welded Connections And One Coat Of Anticorrosive Paint And Over It Two Coat Of All Oil Painting & For Structure(Plus) Providing And Applying Materials &Labour For Hot Dip Galvanizing Of Above Structure Including Transportation For Galvanizing Minimum Thickness 80Microns (Net Wt. Of Components To Be Galv) Preferably Tata Structural Section Etc Complete. , Providing Structural Steel Work In Trusses Other Similar Trussed Purlins And Members With Bracing Gusset Plates Etc As Per Detailed Design And Drawing Or As Directed By Engineer- In-Charge Including Cutting Fabricating Hoisting Erecting And Fixing In Position Making Reverted Bolted Welded Connections One Coat Of Anticorrosive Paint And Over It Two Coats Of Oil Painting Etc Complete. , Materials And Labour For Vinyl Painting Of Matter Given By Department In Different Color , Installation Of 2000 Liters Capacity Water Storage Tank , Providing And Fixing Hdpe Container Syntex Or Alike One Piecemolded Water Tank Made Out Of Low Density Polythyler Andbuilt Corrugation Including Of Delivery Up To Destination Hoisting And Fixing Of Accessories Such As Inlet, Outlet Overflow Of All Tanks Capacity 2000.00 Litres Capacity Water Storage Tank , Transportation Charge , Lifting Of 2000 Litrs Capacity Tank Up To 4.5M Height With Lifting Tools With Rope And Labour , Making Hole In Tank , Making Long Screw In G.I. Pipe Including Supplying And Fitting Jam Nuts And Extra Socket Etc. , Rising And Distribution Network With House Connection Up To 10 Nos. Including Platform & Stand Post , Earth Work In Excavation In Foundation Trenches In Hard Soil (Vide Classification Soil Item B) And Disposal Of Excavated Earth As Obtained To A Distance Up To 50 Mtr. Including All Lifts, Leveling, Ramming The Foundation Trenches, Removing Roots Of Trees, Shrubs All Complete As Per Approved Design, Specification And Direction Of E/I. , Dismantling Plain Cement Concrete Work Including Stacking Serviceable Materials In Countable Stacks Within 15 M Lead And Disposal Of Unserviceable Materials With All Leads All Complete. , Providing Pccm-200 With Nominal Mix Of (1:1.5:3) With Approved Quality Of Stone Chips 20 Mm To 6 Mm Size Graded And Clean Coarse Sand Of Fm 2.5 To 3.0 Including Screening, Shuttering, Mixing Cement Concrete In Mixer And Placing In Position, Vibrating, Sticking, Curing , Taxes And Royalty All Complete As Per Specification And Direction Of E/I. For Construction Of Road Cutting Portion. , Rising Main , Manufacture, Supply And Delivery Offollowing Nominal Dia Upvc Column Pipes Including Pvc Socket (Coupler), , 65Mm Dia -Density Of Pipe 1.38 To 1.43 Gm Per Cm3 Od:74.5 To 75.2Mm Wall Thickness End:9Mm To 10.7Mm, Barrel 9Mm To 10.7 Mm, Length: 3Mtrs.Rising Main , 50 Mm Dia -Density Of Pipe 1.38 To 1.43 Gm Per Cm3 Od:87.5 To 88.2Mm Wall Thickness End:9 .8 Mm To 11.9Mm, Barrel 7.3Mm To 9 Mm, Length: 3Mtrs. Delivery Pipe , Distribution Main , Providing And Supplying High Density Polyethylene Pipe (Hdpe Pipe) Of 20 Mm To 225 Mm Od And Pressure 6.0 Kg/Cm2 And 10 Kg/Cm2 Suitable For Water Supply Which Is Available In All Standard Conforming To Isi -- 4984/14151/12786/13488,Iso 4427 , Din-8074Materials Rates Are Ex-Factory Excluding Transportation, Taxes And Duties. Pe-80 , Pn- 10. , 63 Mm Hdpe Pipe , 50 Mm Hdpe Pipe , 32 Mm Hdpe Pipe- , 20 Mm Hdpe Pipe- , Providing And Fixing Gun Metal Gate Valvewith C I Wheel Of Approved Quality(Screwed End). , 65 Mm Dia , 50 Mm Dia . , Providing And Supplying High Density Polyethylene(Hdpe )Fittings Of 20 Mm To 225 Mm Od And Pressure 6.0 Kg/Cm2 And 10 Kg/Cm2 Suitable For Water Supply Which Is Available In All Standard Conforming To Isi -- 4984/14151/12786/13488,Iso 4427 , Din-8074Materials Rates Are Ex-Factory Excluding Transportation, Taxes And Duties. , Lowering, Laying And Jointing H. D. P. E./M. D.P. E. Pipes In Proper Position Including All Specials By Compression Fitting/Electro Fusion And Butt Fusion Jointing Procedure As Per Relevant Is Code Complete With All Materials For Jointing Procedure Like Electro Fusion Machine, Electric Heater/Butt Fusion Welding Machine With Hydraulic Jack, Top Loading Clamp Etc. And All Labours As Directed By Engineer In Charge As Per Is-7634 Part Ii. , For Rising , 65 Mm Hdpe Pipe , 50 Mm Hdpe Pipe , For Distribution , 65 Mm Hdpe Pipe , 50 Mm Hdpe Pipe , 32 Mm Hdpe Pipe , 20 Mm Hdpe Pipe , 15 Mm Dia Gi Pipe , Supplying All Materials , Labour And Tools For Fixing 15 Mm Dia G.I. Pipes With Red Lead And Yarn Of Following Nominal Bore With Screwed And Socketed Joints On Wall, Ceiling And Floor Including Supplying And Fitting Of Wall Hooks Or Pipe Clamps, Wooden Plugs, Cutting Pipes To Size And Threading Ends If Required Etc. All Complete As Per Specification And Direction Of Engineer-In-Charge. , Supplying And Fixing G.I. Fittings Of Approved Make All Complete As Per Specification And Direction Of E/I. , Elbow 15 Mm Dia. , Reducer Socket 20X15 Mm Dia. , Nipple 15 Mm Dia. , Plain Socket 15 Mm Dia. , Supplying And Fixing G.M. Ferrule Of Approved Make In Existing C.I./D.I. Main Including Drilling And Taping C.I./D.I. Main All Complete As Per Specification And Direction Of E/I. 3 Mm, 6 Mm 10 Mm Dm Ferrule Weight Not Less Than 425 Gram. , Providing And Fixing Gun Metal Full Way Valve Of Approved Quality, All Complete, As Per Specification And Direction Of E/I. , 65 Mm Dia Full Way Valve , 50 Mm Dia And Weight Not Less Than 1.5 Kg. , Providing And Fixing Of Male Ended C.I.Body Brass Spindle Valve And Seat Bib Cock Of Approved Quality With Extra Socketall Complete As Per Specification And Direction Of E/I. , 15 Dia And Weight Not Less Than 400 Gm , Constructing Masonry Chamber 30X30x50 Cm Inside, In Brick Work In Cement Mortar 1:4 (1 Cement :4 Coarse Sand) For Stop Cock, With C. I. Surface Box 100X100 X75 Mm (Inside) With Hinged Cover Fixed In Cement Concrete Slab 1:2:4 Mix (1 Cement : 2 Coarse Sand : 4 Graded Stone Aggregate 20 Mm Nominal Size), I/C Necessary Excavation, Foundation Concrete 1:5:10 ( 1 Cement : 5 Fine Sand : 10 Graded Stone Aggregate 40Mm Nominal Size ) And Inside Plastering With Cement Mortar 1:3 (1 Cement : 3 Coarse Sand) 12Mm Thick, Finished With A Floating Coat Of Neat Cement Complete As Per Standard Design.With Common Burnt Clay F.P.S.(Non Modular) Bricks Of Class Designation 7.5. , Full Way Valve Chamber , Supplying Materials , Labours And Equipments For Construction Of 0.90M X 0.90 M Size P.C.C. (1:2:4) Rectangular Platform With Stand Post In House Including 12 Mm Thick Cement Plaster In C.M. (1:4) With Neat Cement Punning Over Exposed Surfaceall Complete Job, As Per Approved Design, Specification And Direction Of E/I. , Providing Brick Masonry Chamber Ofinner Size 600 X 600 X 450 Mm Deep For Bore Well Protection Having 125 Mm Thick Wall And 75 Mm R.C.C Cover Including Cement Plaster Of Exposed Surface, Etc All Complete Job. , Earth Work In Back Filling The Trenches After Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction Of Engineer-In-Charge. , Providing Fitting & Fixing 32 Mm To 50 Mm Service Hdpe Saddleall Complete Job, As Per Approved Design, Specification And Direction Of E/I. , Carriage Of Materials From Different Sources Or Departmental Stores To Work Site Including Loading, Transporting, Unloading And Stacking The Materials At Work Site Etc. All Complete Job. As Per Direction Of E/I. , Cement Lead 10 Km (Avg.) , Sand Lead 36 Km (Avg.) , Stone Chips Lead 11 Km (Avg.) , Steel Reinforcement Lead 10 Km (Avg.) , Bricks Lead 06 Km (Avg.) , Annual Operation & Maintenance Cost Based On Existing D/T Well With Solarmotor Pump For 5 Years , O & M Cost For 1St Year , O & M Cost For 2Nd Year , O & M Cost For 3Rd Year , O & M Cost For 4Th Year , O & M Cost For 5Th Year , Provision Of One No Sim Card & Its Recharging Cost For Rmc , 18% Gst , Labour Cess

Key Value

Document Fees
INR 1250 /-
EMD
INR 12500.0 /-
Tender Value
INR 6.12 Lakhs /-

BOQ Items

Name of Work: Construction of mini rural water supply Scheme Solar motor pump complete set in Block Giridih Panchayat Sindwariya Village Kurumdiha SVS Group of Schemeunder JJM D.W.S. Division, no 2 Giridih for the Year 2022-23 (SVS-66)
Sl. No. Item Description
1MODEL-1AWITH SOURCE(Drilled T/W 125/115 dia mm, 60M deep)
2Tube Well
3Drilling Portion
4Construction for 115/125 mm dia drilled Tube-Well for drilling in all kinds of soil rock for installation of hand pump with D.T.H Rig machine all complete including supplying all materials, labours, tools, drilling, rigs, air compressor and equipments as well as fuel lubricant for making 125/115 mm dia boring etcand cost of transporting rig machine and other vehicle up to site workas per specification and direction of Engineer-in-charge.
5(a) Up to 30mtr. Depth bellow G.L. in Rural Areas
6(b) Beyond 30mtr.In Rural Areas
7Providing all equipments and labour for lowering 125mm dia blue UPVC Casing pipe as casing for protecting the side from falling during the process of drilling all complete job including carriage of material to work site.
8Supplying labour cement and calcium chloride or bentonite solution and equipments for Grouting to Casing Pipe all complete job including carriage of material to work site as per specification & direction of E/I
9Supplying all tools, equipments and labour and doing washing, flushing and development of drilled tube well to give clean and clear water all complete as per direction E/I.
10Supplying all materials labours and equipment including 125 mm dia GI/CI cap 125 mm dia T/W properly all complete and taking it out as per specification & direction of E/I. (the cap will be property of department)
11Civil Portion
12Supplying all tools, equipment, labours and lowering 32 mm dia G.I. (Medium)pipe in DT in 3 mtr. Length all complete job as per direction of E/I. Including carriage of materials.
13Supplying all tools, Labour for fitting and fixing deep well cylinder with necessary connecting rod all complete job as per specification & direction of E/I.
14Supplying all materials, labours for fitting and fixing of India Mark II Hand Pump with all accessories all job complete as per direction of E/I. Including carriage of materials.
15Supplying all materials, labours and equipment for constructing PCC (1:2:4) circular platform around each drilled tube well including 12mm thick cement plaster (1:4) with neat cement punning over exposed surface as per UNICEF design etc. all complete. Including carriage of materials.
16Supplying all materials labour and equipment for constructing PCC (1:2:4) drain as per UNICEF Design etc. all complete .Including carriage of materials.
17Add Extra Item for Supplying tools, labours and materials for painting, numbering and year for construction of T/Well and taking of colour photograph with two or three nearest persons including platform, drain, soak pit and also longitude & latitude, details of T/W such as total depth, casing depth, static water level, drawdown, discharge, strata chart, beneficiary population etc in separate sheet/format all complete as per direction of E/I.
18COST OF MATERIALS
19cost of standard I.S.I. mark Deep Well Hand Pump for India mark-II, I.S.I. 15500 (Part 2) / 2004 with latest revision including 12mm x 3 meter long 8 no. Connecting Rods made of bright bar electro-galvanized fitted with coupler & normal stand assembly recommended for use with cylinder assembly suitable for bore wellcasing pipe.
20Cost of 32 mm dia GI pipe (Medium) 3 Mtrs long screwed at both ends with seamless socket as per IS:1239(Part 1990).
21Cost of 125 mm dia blue UPVC Casing Pipe as per I.S.12818/2016 CML no.- 5543459
22Solar Photovoltaic (SPV) Solar Submersible D.C. Water Motor Pump
23Designing, Supplying, Installation, Testing & Commissioning with all tools & Parts of following Solar Photovoltaic (SPV) Solar Submersible D.C. Water Motor Pump Suitable for minimum 125mm x 115mm bore well as per MNRE Guideline with following specifications & accessories.
24SPV arrays contains specified No of same capacity type & specification modules connected to series or parallel to obtained the required voltage & current the power output of individual PVmodules should be minimum 200 watt peak.
25i) The SPV modules should be as per IEC-61215 and IEC 61730 part 1.0)
26ii) All external parts of motor pump used in submersible pump which are in contact of water is stainless steel grade 303 or higher as required.
27iii) The PV modules shouldbe mounted on metallic structure of adequate strength and appropriate design which can withstand load of modules & High wind pressure up to 200Km/h.
28iv) The module mounting structure should be hot dip galvanized according to IS 4759.
29v) To enhance the performance of SPV water pumping system & arrangement for seasonal tilt angle Adjustment should be provided
30vi) Necessary arrangement should be provided in controller automatic start-run-stop through out the day with water level detection system. (As per MNRE Specification)
31vii) Necessary protection such as lightening arrestor etc. should be provided to protect the controller & SPV
32viii) The suction/delivery pipe shall be UPVC / H.D.P.E. pipes of appropriate size 60m or more as required minimum pressure rating of 8kg/Sq cm- PE 100 grade for pump up to 3HP & 10 Kg/Sq cm- PE 100 grade for 5 HP.
33ix) All cable used shall be as per IS 694. Suitable size of cable shall be used in sufficient length for inter connection between the SPV array to SPV controller and SPV controller to solar power pump. Provision of cable shall be as per IS 14536.
34x) The motor pump set should have a 5 years warranty.
35xi) Control panel suitable for motor pump with arrangement of dry run & over flow protection sensor, float switch & rain prevention box. (As per MNRE Specification)
36xii) The SPV controller must have IP-65 protection or must be housed in cabinet having at least IP-65 protection.
37xiii) The system should be as per MNRE guide line & Eco-friendly with suitable arrangement to operate new pump manually.
38xiv) With third party inspection before dispatch.
39xv) Fitting, fixing & mounting on water tank steel structure.
40xvi) Provision for web basedremote monitoring of the pumps to be installed must be made through the inbuilt controllers . It should be possible to ascertain the daily water output, the power generated by PV Array ,the Up and downtime of the pump during the year, number of days the pump was unused or under breakdown repairs.
41The following details should be marked indelibly on the motor pump set
42a) Name of the Manufacturer or Distinctive Logo.
43b) Model Number.
44c) Serial Number.
45Solar submersible motor pump (SPV DC Type)
46i) 1 HP (DC Pump) with 900 WP minimum watt P.V. Panel as MNRE pump head Max Shut-off head up to 120 mtrs. For higher or lower head or in between various modules output could be decided on prorates basis. (As per latest guide line of MNRE)
47Carrying out recuperation/Yield Test for ascertaining the discharge of constructed well/ excavated profile as directed by the IEC. The testout by the drawing down water from the well/ profile below normal/subsoil water level up to full depth rise is recorded the normal water level/subsoil water level in the well / profile as well as strainer/level at pump as per design of W.S. scheme shall be recorded prior to the test including cost of all materials, over Load , Labours etc. complete as directed.
48Supplying all labours, tools and equipments for dismantling of head & water tank assembly and taking out 32 mm dia old G.I. Pipe, connecting rod, cylinder assembly the dismantled components after necessary changing for making the T/W in good condition with all transportation including unused taken out materials back in store all complete job as per direction of E/I.
49Provision of solar night lamp.
50Construction RCC Foundation for Steel structurestaging& Solar panel
51Earth work in excavation in foundation trenches in ordinary soil and disposal of excavated earth as obtained to a distance up to 50.0m ,including all lifts, levelling ,ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design ,building specification and direction of E/I (vide classification of soil item -B)
52Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials ,labour ,royalty and taxes all complete as per building specification and direction of E/I(Mode of measurement compacted volume)
53Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I
54Providing PCC M-150 in nominal mix of (1:2:4) in foundationwith approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M.2.5to 3 including screening shuttering mixing cement concrete in mixer and placing in position vibrating striking curing and royalty all complete as per building specification and direction of E/I
55Providing RCC M-200 in nominal mix of (1:1.5:3) in columnswith approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M.2.5to 3 including screening shuttering mixing cement concrete in mixer and placing in position vibrating striking curing and royalty all complete as per building specification and direction of E/I.
56(a)Foundation for Steel structure staging
57Footing
58Vertical Pedestal
59Tie Beam
60(b)Foundation for Solar panel
61Footing
62Vertical Pedestal
63Providing for steel reinforcement as per approved design and drawing excluding carriage of T.S. bar to work site cutting, bending with annealed wire with cost of wire, removal of rust placing the rods in position all complete as per building specification and direction of E/I.
6410 mm Dia
6512 mm Dia
66Carriage of construction materials to work site including loading, unloading & stacking etc. all complete.
67Cement10KM lead
68Steel10KM lead
69Stone chips 11KM lead
70Sand36KM lead
71Bricks 06KM lead
72Construction ofgalvanized tubular Steel structure staging for (4.5m) HDPE water storage Tank& Solar Panel.
73Providing structural steel galvanised tubular hollow section work in trusses, other similar trussed purlins and members with all bracing ,gusset plates etc as per detailed design and drawing or as directed by Engineer- in-charge ,including cutting fabricating ,hoisting , erecting and fixing in position , making riveted/bolted /welded connections and one coat of anticorrosive paint and over it two coat of all oil painting & For Structure(PLUS) Providing and applying materials &labour for hot dip galvanizing of above structure including transportation for galvanizing minimum thickness 80microns (Net wt. of components to be Galv) preferably TATA structural section etc complete.
74Providing structural steel work in trusses other similar trussed purlins and members with bracing gusset plates etc as per detailed design and drawing or as directed by Engineer- in-charge including cutting fabricating hoisting erecting and fixing in position making reverted bolted welded connections one coat of anticorrosive paint and over it two coats of oil painting etc complete.
75Materials and labour for vinyl painting of matter given by department in different color
76Installation of 2000 liters Capacity Water Storage Tank
77Providing and fixing HDPE container Syntex or alike one piecemolded water tank made out of low density polythyler andbuilt corrugation including of delivery up to destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity 2000.00 litres Capacity Water storage Tank
78Transportation Charge
79Lifting of 2000 Litrs Capacity Tank up to 4.5m height with lifting tools with rope and labour
80Making hole in Tank
81Making long screw in G.I. pipe including supplying and fitting jam nuts and extra socket etc.
82Rising and Distribution Network with House Connection up to 10 Nos. including Platform & Stand post
83Earth work in excavation in foundation trenches in hard soil (Vide Classification soil item B) and disposal of excavated earth as obtained to a distance up to 50 Mtr. including all lifts, leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, specification and direction of E/I.
84Dismantling plain cement concrete work including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete.
85Providing PCCM-200 with nominal mix of (1:1.5:3) with approved quality of stone chips 20 mm to 6 mm size graded and clean coarse sand of FM 2.5 to 3.0 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, sticking, curing , taxes and royalty all complete as per specification and direction of E/I. for construction of road cutting portion.
86Rising Main
87Manufacture, supply and Delivery offollowing Nominal dia UPVC column pipes including PVC socket (Coupler),
8865mm dia -Density of pipe 1.38 to 1.43 Gm per Cm3 OD:74.5 to 75.2mm wall Thickness End:9mm to 10.7mm, Barrel 9mm to 10.7 mm, Length: 3Mtrs.Rising main
8950 mm dia -Density of pipe 1.38 to 1.43 Gm per Cm3 OD:87.5 to 88.2mm wall Thickness End:9 .8 mm to 11.9mm, Barrel 7.3mm to 9 mm, Length: 3Mtrs. Delivery Pipe
90Distribution Main
91Providing and supplying High Density Polyethylene pipe (HDPE pipe) of 20 mm to 225 mm OD and pressure 6.0 Kg/cm2 and 10 Kg/cm2 suitable for water supply which is available in all standard conforming to ISI -- 4984/14151/12786/13488,ISO 4427 , DIN-8074materials rates are Ex-factory excluding transportation, taxes and duties. PE-80 , PN- 10.
9263 mm HDPE Pipe
9350 mm HDPE Pipe
9432 mm HDPE Pipe-
9520 mm HDPE Pipe-
96Providing and fixing Gun Metal Gate valvewith C I wheel of approved quality(screwed end).
9765 mm dia
9850 mm dia .
99Providing and supplying High Density Polyethylene(HDPE )fittings of 20 mm to 225 mm OD and pressure 6.0 Kg/cm2 and 10 Kg/cm2 suitable for water supply which is available in all standard conforming to ISI -- 4984/14151/12786/13488,ISO 4427 , DIN-8074materials rates are Ex-factory excluding transportation, taxes and duties.
100Lowering, Laying and Jointing H. D. P. E./M. D.P. E. pipes in proper position including all specials by compression fitting/electro fusion and butt fusion jointing procedure as per relevant IS Code complete with all materials for jointing procedure like Electro fusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II.
101For Rising
10265 mm HDPE Pipe
10350 mm HDPE Pipe
104For Distribution
10565 mm HDPE Pipe
10650 mm HDPE Pipe
10732 mm HDPE Pipe
10820 mm HDPE Pipe
10915 mm Dia GI Pipe
110Supplying all materials , labour and tools for fixing 15 mm dia G.I. pipes with Red lead and yarn of following nominal bore with screwed and socketed joints on wall, ceiling and floor including supplying and fitting of wall hooks or pipe clamps, wooden plugs, cutting pipes to size and threading ends if required etc. all complete as per specification and direction of Engineer-in-Charge.
111Supplying and fixing G.I. fittings of approved make all complete as per specification and direction of E/I.
112Elbow 15 mm dia.
113Reducer Socket 20x15 mm dia.
114Nipple 15 mm dia.
115Plain Socket 15 mm dia.
116Supplying and fixing G.M. ferrule of approved make in existing C.I./D.I. main Including drilling and taping C.I./D.I. main all complete as per specification and direction of E/I. 3 mm, 6 mm 10 mm dm ferrule weight not less than 425 gram.
117Providing and fixing Gun Metal full way valve of approved quality, all complete, as per specification and direction of E/I.
11865 mm dia Full way valve
11950 mm dia and weight not less than 1.5 Kg.
120Providing and fixing of male ended C.I.Body brass spindle valve and seat Bib cock of approved quality with extra socketall complete as per specification and direction of E/I.
12115 dia and weight not less than 400 Gm
122Constructing masonry Chamber 30x30x50 cm inside, in brick work in cement mortar 1:4 (1 cement :4 coarse sand) for stop cock, with C. I. surface box 100x100 x75 mm (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design.With common burnt clay F.P.S.(non modular) bricks of class designation 7.5.
123Full way valve chamber
124Supplying materials , labours and equipment"s for construction of 0.90M x 0.90 M size P.C.C. (1:2:4) Rectangular Platform with stand post in house including 12 mm thick cement plaster in C.M. (1:4) with neat cement punning over exposed surfaceall complete job, as per approved design, specification and direction of E/I.
125Providing brick masonry chamber ofinner size 600 x 600 x 450 mm deep for bore well protection having 125 mm thick wall and 75 mm R.C.C cover including cement plaster of exposed surface, etc all complete job.
126Earth work in back filling the trenches after laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction of Engineer-in-Charge.
127Providing fitting & fixing 32 mm to 50 mm service HDPE saddleall complete job, as per approved design, specification and direction of E/I.
128Carriage of materials from different sources or departmental stores to work site including loading, transporting, unloading and stacking the materials at work site etc. all complete job. as per direction of E/I.
129Cement Lead 10 Km (avg.)
130Sand Lead 36 Km (avg.)
131Stone Chips Lead 11 Km (avg.)
132Steel ReinforCement Lead 10 Km (avg.)
133Bricks Lead 06 Km (avg.)
134Annual Operation & Maintenance cost based on Existing D/T Well with solarmotor pump for 5 years
135O & M Cost for 1st year
136O & M Cost for 2nd year
137O & M cost for 3rd Year
138O & M cost for 4th Year
139O & M cost for 5th Year
140Provision of one no SIM card & its recharging cost for RMC
14118% GST
142Labour cess
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail