|
| 1 | Earth work in excavation of foundation of structures by manual means in all kinds of soil including stony earth and gravel in both wet and dry condition including shoring, shuttering, propping, bullah, dewatering the foundation, diverting the water away from the structure, dressing, leveling and ramming the foundation bed and sides with pneumatic tampers/ fuel- operated compactors as per the drawing and specification and removing the excavated materials with all leads, lifts and delifts etc. & depositing the excavated materials in the embankment with watering and disposing the excess materials in spoil bank or any other specified areasby manual means with all leads, lifts and delifts complete with cost of construction and maintenance of approach road, diversion road and all taxes, T&P etc. complete including mobilization and demobilization of men and machineries etc. complete with all cost incidental to the work as per the drawing, specification and direction of the Engineer-in-Charge. |
| 2 | R.R. Stone massonry in sand grouted in foundation and plinth using 30 cm. size hard granite stone with cost of all materials, conveyance, royalty, labour with T&P etc.complete as per the direction of the Engineer-in-charge. |
| 3 | Double under reamed375 mm diapile foundation with RCC M – 25 grade using 20 mm size black hard granite crusher broken stone chips of approved quality from approved quarry including cost of boring with bentonite slurry including curing ( excluding cost of HYSD bar / Tor steels , labour charges for cutting, bending, binding, straightening and tying the grills and placing in position, cost of binding wires etc.) with cost, conveyance, royalty, taxes, T&P and supervision charges etc. complete required for the work as per approved design and direction of the Engineer-in-Charge.( For 7.0 Mtr. depth) |
| 4 | Providing and laying cement concrete M-15 grade (as per design/ nominal mix) in approved surface using 40mm and down graded hard granite well graded crusher broken stone aggregates free from weathered skin surface and any other deleterious materials, using sharp sand of approved grading & quality conforming to the specifications, using water of approved quality with all leads. lifts, delifts and transportation by mechanical / manual means including cost, carriage, royalties and taxes of all other materials including dewatering with all cost, weighing all materials using weigh batcher, mixing the concrete mix ingredients in all mechanical mixer, vibration of concrete by mechanical means, supplying T&P, watering, curing for specified days including cost and carriage of water, construction ofapproach road, diversion road, mobilization and demobilization of men and machineries etc. including quality control testing charges as per approved drawings and specifications and direction of the Engineer-in-Charge. |
| 5 | Providing & laying reinforced cement concrete M-25 grade (as per design/nominal mix) in approved surfaceusing 20mm & down graded hard granite well graded crusher broken stone aggregates free from weathered skins surface and any other deleterious materials, using sharp sand of approved grading & quality confirming to the specifications, using water of approved quality & using cement as per approved specification with all leads & delifts & transportation by mechanical / manual means including cost, carriage, royalties, Labour cess & taxes of all materials using weigh-batcher, mixing the ingredients ina mechanicalmixer, vibration of concrete by mechanical means supplying T & P, watering, curing for specified days by suitable means including cost & carriage of water, construction of approach road, diversion road, mobilisation & demobilisation of men & machineries etc. including quality control testing charges as per approved drawing & specification & direction of the Engineer-in-Charge. |
| 6 | Providing HYSD bars confirming to grade Fe 500 of steel and approved quality including labour charges for straightening, cutting, bending, binding lapping, welding, etc. & conforming to IS specification and tying the grills and placing in position with ties, charges and spacers including lapping by binding wires / welding wherever necessary and fixing of reinforcement for RCC works as per the approved design with all leads, lifts and de-lifts from bending yard to placement spot including cost, quality control testing charge and conveyance of HYSD bars and binding wire of 18 to 20 gauge including cost of all labour, T & P and supervision charges,Labour Cess & all taxes etc. complete as per design, drawing, specification and direction of the Engineer – in – Charge. (Standardco-efficient of different sizes of steel shall be considered for payment & welding and lapping shall confirm to relevant clause of IS code). |
| 7 | Providing rigid and smooth form works for Cement Concrete or RCC workincluding false work & dismantling therafter casting for all heights in all types of structures including pier, abutment, trough slab, road slab etc. complete using steel shutters or plywood shutters efficiently propped and braced using required number of pylons for vertical support, scaffolding, gangway etc. complete and applying the finish for surfaces prominently exposed to public view or flow areas subjected to high velocity as per IS 457 and dismantling after allowing required support time and stacking the same for reuse including greasing, oiling etc. including cost, carriage, royalty and taxes of all materials, labour and T&P and supervision charges complete as per approved design and direction of the Engineer-in-Charge. |
| 8 | A) Foundation & Plinth :- |
| 9 | B) Columns & Beams :- |
| 10 | C) Walls & Fins - |
| 11 | D) Deck Slab :- |
| 12 | Providing and laying cement concrete M-20 grade (as per design/ nominal mix) in approved surface using 20mm and down graded hard granite well graded crusher broken stone aggregates free from weathered skin surface and any other deleterious materials, using sharp sand of approved grading and quality conforming to the specifications, using water of approved qualitywith all leads. lifts, delifts and transportation by mechanical / manual means including cost, carriage, royalties and taxes of all other materials including dewatering by suitable means with all cost, weighing all materials using weigh batcher, mixing the concrete mix ingredients in all mechanical mixer, vibration of concrete by mechanical means, supplying T&P, watering, curing for specified days including cost and carriage of water, construction ofapproach road, diversion road, mobilization and demobilization of men and machineries etc. including quality control testing charges as per approved drawings and specifications and direction of the Engineer-in-Charge. |
| 13 | Rough Stone Dry Packing including Quarrying, Collection & Supplying hard stone boulders of size 15cm to 30 cm. in length in any direction,0.028 Cum. in volume free from weather skin surface and other deleterious materials and packing in aprons, revetments, slope packing (as per Design and Drawing) including filling the interstices with small stones, wedging and hammering etc. including cost, conveyance, royalty, Labour Cess, taxes of all materials from approved quarry of approved quality of uniform color and texture with all leads, lifts, delift,handling and re-handlingwith cost of labour charges and other incidentals charges and royalty etc. complete and as per Technical Specificationrequired to complete the work and quality control testing charges etc. complete as per specification and direction of the Engineer-in-Charge . |
| 14 | Filling behind abutment, wing wall and return wall with excavated earth including cost, carriage and royalty etc. complete and as per Technical Specification & direction of the Engineer-in-Charge. |
| 15 | Back filling behind abutment, wing wall and return wall with admixture of sand and morrum,including cost, carriage and royalty etc. complete and as per Technical Specification including watering and cosolidation with H.R.R. as per the specification & direction of the Engineer-in-Charge. |
| 16 | Excavation of drain Channel/ canal by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with one extra shift of excavator including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineerin-charge. ( Removal of Cross- Bundh ) |
| 17 | Earth work in suitable type of soil in borrow area, loading into transport vehicle manually or mechanically and transportation of earth by mechanical means unloading the same over the approved surface of embankment in proper profiles with 5.00km leads, including rough dressing and breaking the clods to maximum 5cm to 7cm size including removal of roots, bushes, other deleterious materials from transported earth with all cost, carriage, royalty, labour welfare cess & laying in layers not exceeding 22.50cm in depth with vibratory Roller, hire & running charges of all machinaries with all labour & T&P required for the work etc. complete in all respectas per specification and direction of the Engineer-in-Charge. |
| 18 | Quarrying, collecting & supplying good quality sand and moorum from approved quarry and stacking the same at work site or at approved stack yard for premeasurement in regular box heaps of 1.50m x 1.50m x 0.50m to be measured as one cum and conveying from premeasured and spreading the admixture over the prepared surface not exceeding 100mm in layers to required thickness including watering and compacting to required density with P.R.R. including cost, conveyance, royalty and all other taxes of all materials and cost of labour, T&P required for the work including hire and running charges of machinaries with all leads, lifts and delifts and labour welfare cess etc. ccomplete including labour cess as per direction of the Engineer-in-charge. |
| 19 | Providing weep holes in abutments and wing wall as per IRC – 78 including form works of approved type if required and graded metal backing in near side as per approved design and specification includingcomplete as perdirection of the Engineer-in-charge. |