}

Tender For Comprehensive Maintenance Of Ahu, Cooling Towers Of Different Capacity Including Outsourcing Services For Manning And Operation Of Central Ac Plants At Mica, 25 And 26 Mmpu Of Afs Gwalior, gwalior-Madhya Pradesh

Military Engineer Services-MES has published Tender For Comprehensive Maintenance Of Ahu, Cooling Towers Of Different Capacity Including Outsourcing Services For Manning And Operation Of Central Ac Plants At Mica, 25 And 26 Mmpu Of Afs Gwalior. Submission Date for this Tender is 25-05-2023. Air Handling Unit Tenders in gwalior Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

37619953
Corrigendum : Tender For Comprehensive Maintenance Of Ahu, Cooling Towers Of Different Capacity Including Outsourcing Services For Manning And Operation Of Central Ac Plants At Mica, 25 And 26 Mmpu Of Afs Gwalior
Open Tender
Indian
Madhya Pradesh
gwalior
25-05-2023

Tender Details

Comprehensive Maintenance Of Ahu, Cooling Towers Of Different Capacity Including Outsourcing Services For Manning And Operation Of Central Ac Plants At Mica, 25 And 26 Mmpu Of Afs Gwalior

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 15-May-2023 Corrigendum II BOQ 25-05-2023
2 15-May-2023 Corrigendum I Date 25-05-2023
3 18-May-2023 Corrigendum III Other 25-05-2023
4 19-May-2023 Corrigendum IV Other 25-05-2023

Key Value

Document Fees
INR 500 /-
EMD
INR 98000.0 /-
Tender Value
INR 49 Lakhs /-

BOQ Items

Name of Work: COMPREHENSIVE MAINTENANCE OF AHU, COOLING TOWERS OF DIFFERENT CAPACITY INCLUDING OUTSOURCING SERVICES FOR MANNING AND OPERATION OF CENTRAL AC PLANTS AT MICA, 25 & 26 MMPU OF AFS GWALIOR
Sl. No. Item Description
1Outsourcing of services for operation of Central AC plants & DG sets round the clock everydayfrom Monday to Sunday, usingone operator (SKILLED) in each shift (i.e. 03Shifts in 24 Hours, each shift of 8 hours) with the operation of following plants/Equipments etc at Mica Missile ESH under Air Force Station Gwalior:- (A) Central AC Plant Chiller type of Capacity 3 x 26 TR (01 working & 01 standby):- (a) 52 TR capacity chiller unit complete comprising of scroll compressors with Air cooled condensers etc including LT panel with starters- 03 Sets. (b) Chilled water/condenser water circulating mono block Pump with electric motor 7.5 HP-04 Nos. (c) Air handling unit 15000 CFM-01 Nos. (B)Water supply Installation (i) Operation of submersible pump set with panel capacity 10.5 HP -01 Set at A Flt pump house and maintain daily log sheet all as directed. (ii) Operate control valves for distribution /rising water supply pipe line to over head tank-01 set (iii) Operation of chlorine plant at A Flt pump house and maintain chlorine levels as directed and maintain record of chlorination properly all as directed by Engr-in-Charge.
2Outsourcing of services for operation of Central AC plants & DG sets round the clock everydayfrom Monday to Sunday, usingone operator (SKILLED) in each shift (i.e. 03Shifts in 24 Hours, each shift of 8 hours) with the operation of following plants/Equipments etc at 24 & 25 MMPU under Air Force Station Gwalior:- (A) Central AC Plant chiller type of Capacity 2 x 52 TR working and 01 x 52 TR standby at 25 MMPU:- (i) 104 TR capacity chiller unit complete comprising of scroll compressors with Air cooled condensers etc including LT panel with starters- 03 Sets. (ii) Chilled water/condenser water circulating mono block Pump with electric motor 10 HP and 12.5 HP - 04 Nos. (iii)Hot water generator 63 KW - 01 No. (iv) Hot water pump set 5 HP - 02 Nos. (v) Air handling unit 20000 CFM - 02 Nos. (vi) LT control panel comprising of starters of all connected equipments - 04 Nos (vii) DG Set 20 KVA with AMF panel & LT panel- 01 Set
3Outsourcing of services for operation of Central AC plants, DG sets round the clock everydayfrom Monday to Sunday, usingone operator (SKILLED) in each shift (i.e. 03Shifts in 24 Hours, each shift of 8 hours) with the operation of following plants/Equipments etc at 26 MMPU under Air Force Station Gwalior:- (A) Central AC Plant DX Type of Capacity 2 x 35 TR Working and 01 x 65 TR standby at 26MMPU :- (i) 35 TR capacity condensing unit complete comprising of compressor with electric induction motor & condenser -03 Sets (ii) Condenser water circulating pump with electric motor -02 Sets (iii) FRP induced draft cooling tower of 100% capacity - 01 Set (iv) Air Handling unit complete of 12000 CFM and 8000 CFM capacity electric blower motor - 02 Nos (v)Humidification pump complete driven by electric motor- 01 No (vi) LT Control panel comprising starters of all connected equipments of AC plants- 01 Set (vii)DG Set of 160 KVA capacity
4Note For Item No. 01 To 03 (i) Contractor shall maintain adequate temperature and relative humidity as per design parameter of each AC Plant. (ii) Cleaning of complete AC plant, Pre metallic filters, coolingtowers & surrounding area is also contractor`s responsibility. (iii) Checking of electric connections of all components, refrigerant gas leakage, rectification and recharge of refrigerant gas, checking of complete AC plant & checking of LP, HP & Oil pressure. (iv) Replacement of minor parts such as Flair nuts, LT cable joints with suitable size lugs are contractor’s responsibility. (v) Paymentsshall be made as per minimum labour wages latest fixed by State Govt/CentralGovt whichever is higher. (vi) The quoted rate of bidder shall not be less than minimum fair wages fixed by State Govt/Central Govt (whichever is higher) including GST, LWC, EPF, ESIC etc as applicable, if quoted rate of bidder is lesser than a complete detailed justification for the same shall be uploaded in cover-I. (vii) FOL, refrigerant gas and lubricants shall be issued by the department store yard under Schedule ‘B’ free for filling and it will be the contractors responsibilities for filling of oil / lubricant in to fuel tank of DG sets all as specified & directed and empty containers shall be returned by the contractor to the MES store under GE AF TA Gwalior. (viii) It will be the contractor’s responsibility to operate the DG sets, panels and distribution system to maintain the smooth function of installation round the clock. (ix) It will be the contractor’s responsibility to operate the pumps, panels and distribution system to maintain the user’s requirement round the clock. (x) All operator shall be ITI holder or minimum 3 years of work experience. (xi) All operator will wear proper uniform as approved by GE. (xii)For panel recovery on account of non-operation of installation/absent of operators from duty, the recovery amount shall be calculated @ double of rate of minimum fair wages of operator and shall be recovered from the due payments.
5(xiii) All tradesmen shall be individually life insured. The insurance certificate shall be kept on record. Qualification/Experience certificate of the employed tradesmen shall be kept on record. (xiv) Stationery for operation of installation shall be contractors responsibility (Daily Log Sheet, Attendance register, Wages Register, Routine maintenance Register) (xv) Log sheets shall be submitted weekly by contractor. (xvi) Operator shall carry out routine checkup likely battery & radiator water level and will maintain it, if any abnormal noise/fault seems in DG set, operator will immediately inform to concern JE E/M or Engineer-in- Charge.(A record in this regard shall be responsibility of the contractor ). (xvii) The same operator will operate the pump/panel & distribution system to maintain the user"s requirement round the clock. (xviii) Contractor submit the nominal roll of persons to be employed alongwith qualification/experience certificates, Police verification identification certificate to Engineer-in-Charge before deployment of the staff. (xix) Contractor will submit nominal roll within 10 days of acceptance of contract and qualification and experience certificate of tradesmen to Engr-in-charge for approval of GE before commencement of the work. (xx) Every tradesmen should have his own valid identity card for being Indian citizen. (xxi) All provisions contained in various Labour Laws/Acts and IAFW 2249 as amended from time to time are meticulously followed. (xxii)The operator will maintain record of log sheet & connected register as directed by Engr-in-Charge and to be produce at the end of month, failing which a penalty of Rs. 3000/- per month will be recovered from the contractor till production of relevant record. (xxiii) Cleaning of workplace instrument/machinery/rest room shall be responsibility of contractor.
6Comprehensive Annual Maintenance for eleven months and break down attendance of Central AC plants, cooling tower FRP type, AHU, electric motors & DG sets of different capacity etc consisting daily, monthly & half yearly as mentioned here-in-after. All checks and periodical services and preventive maintenance of Central AC plants, cooling tower FRP type, AHU, electric motors & DG sets as specified and recommended by the respective manufacturers in addition if any installed at Mica Missile ESH, 24 MMPU, 25 MMPU and 26 MMPU complete with replacement of defective parts during breakdowns, consumables and necessary tools & plants as required etc. The operator shall maintain the performance of the following plants & connected equipments:- (A) Central AC Plant Chiller type of Capacity 3 x 26 TR (01 working & 01 standby):- (a) 52 TR capacity chiller unit complete comprising of scroll compressors with Air cooled condensers etc including LT panel with starters- 03 Sets. (b) Chilled water/condenser water circulating mono block Pump with electric motor 7.5 HP-04 Nos. (c) Air handling unit 15000 CFM-01 Nos. (B)Water supply Installation (i) Operation of submersible pump set with panel capacity 10.5 HP -01 Set at A Flt pump house and maintain daily log sheet all as directed. (ii) Operate control valves for distribution /rising water supply pipe line to over head tank-01 set (iii) Operation of chlorine plant at A Flt pump house and maintain chlorine levels as directed and maintain record of chlorination properly all as directed by Engr-in-Charge. Contd../-
7(C) Central AC Plant chiller type of Capacity 2 x 52 TR working and 01 x 52 TR standby at 25 MMPU:- (i) 104 TR capacity chiller unit complete comprising of scroll compressors with Air cooled condensers etc including LT panel with starters- 03 Sets. (ii) Chilled water/condenser water circulating mono block Pump with electric motor 10 HP and 12.5 HP - 04 Nos. (iii)Hot water generator 63 KW - 01 No. (iv) Hot water pump set 5 HP - 02 Nos. (v) Air handling unit 20000 CFM - 02 Nos. (vi) LT control panel comprising of starters of all connected equipments - 04 Nos (vii) DG Set 20 KVA with AMF panel & LT panel- 01 Set (D) Central AC Plant DX Type of Capacity 2 x 35 TR Working and 01 x 65 TR standby at 26MMPU :- (i) 35 TR capacity condensing unit complete comprising of compressor with electric induction motor & condenser -03 Sets (ii) Condenser water circulating pump with electric motor -02 Sets (iii) FRP induced draft cooling tower of 100% capacity - 01 Set (iv) Air Handling unit complete of 12000 CFM and 8000 CFM capacity electric blower motor - 02 Nos (v)Humidification pump complete driven by electric motor- 01 No (vi) LT Control panel comprising starters of all connected equipments of AC plants- 01 Set (vii)DG Set of 160 KVA capacity
8NOTE for Item No.6 & 7:- Periodical Routine Maintenance/Checks as per OEM Recommendations or as directed, including minor & major repairs and testing of Central AC plants, cooling tower FRP type, AHU, electric motors, pump sets and mono block pump set of AC plant & DG sets, complete all as specified and mentioned works as below :- (a) Examine suction and Exhaust Valves and Cleaning for smooth operation. (b) The cost of over hauling of equipments including replacement of major defective spare parts of Central AC plants, cooling tower FRP type, AHU, electric motors & DG sets (excluding spare parts of engine and alternator of DG sets) as directed of existing make/brand (or of superior quality in case of non availability of existing make) shall deemed to be included in quoted rate of this item. (c) Tentative spare parts of DG sets shall be Fuel filters, Lubrication oil filter element with O ring, Air filter element inner & outer with O ring, Lubricant oil, distilled water, coolant, fan belt, ammeter, voltmeter, speedometer, battery, battery charging dynamo, self starter assembly, AVR, stop solenoids, controller card, water pump, fuel ejector pump assembly, housing of DG sets, power contactor and other spare parts which are required for smooth functioning of DG sets. (d) Tentative spare parts of Central AC plants, cooling tower FRP type, AHU, electric motors, pump sets and mono block pump set of AC plant shall be PVC filling blocks, aluminium fan set, rotary sprinkler complete, pedestal bearing, MS shaft pulley, cast copper alloy gate valves, V belt, micro V air filters, Pre air metallic air filters,rewinding of electric motors, ball bearing/ roller bearing, gun metal bushes, MS coupling, Neck ring of gun metal, cast iron glend plate, glend bolts, pump shaft, rotor motor, pump impeller CI, contactor, overload relay, electronic timer complete spare parts of voltas compressors and other spare parts which are required for smooth functioning of Central AC plants, cooling tower FRP type, AHU, electric motors, pump sets and mono block pump set of AC plant. (e) De-scaling of radiator assembly, rebinding of alternator, reconditioning of batteries including replacement with new parts and servicing & replacement defective parts shall deemed to be included in quoted rate of this item.
9(f) Clean Alternator winding in position by forced air and internal surfaces, lubricate DE & NDE bearings as and when required (g) Test IR value of alternator winding and recording the readings (h) Tightening of all nut bolts (j) Greasing wherever is required (k) Checking of any leakage of fuel & Oil lines (l) Cleaning of fuel tank when due (m) Checking and servicing of Turbo Charger as and when required. (n) Examine and clean fuel injection, nozzles (o)Painting of Central AC plants, cooling tower FRP type, AHU, electric motors, pump sets and mono block pump set of AC plant including cage with synthetic enamel paint of existing shade once during the contract period. (p) Complaints if any shall be attended as and when ordered (through Phone/in writing) by Engineer-in-Charge (q) Work is including consumables like cotton waste cloth kerosene oil etc. (r) DHPP(N) required at the time of maintenance/testing will be issued by MES complete all as specified and directed by Engineer-in-Charge. (s)Necessary make good of base/foundation of DG sets shall be done by the contractor as per existing specifications, if the same is damaged during currency of contract. (t)At the time of handing over of equipments after completion of the work all DG sets shall be serviceable, operational & in smooth running condition.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail