Nctps-I - M.Ii Circle – Ahp Dn. - Breakdown And Shutdown Maintenance Works In Ash Slurry Disposal Pumps (Pump Capacity Of 930 M3/Hr). Ash Water Pumps, Seal Water Pumps, Flushing Water Pumps.Drain Pumps And Sea Water Booster Pumps, Slurry Line Valves, Make, Thiruvallur-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Nctps-I - M.Ii Circle – Ahp Dn. - Breakdown And Shutdown Maintenance Works In Ash Slurry Disposal Pumps (Pump Capacity Of 930 M3/Hr). Ash Water Pumps, Seal Water Pumps, Flushing Water Pumps.Drain Pumps And Sea Water Booster Pumps, Slurry Line Valves, Make. Submission Date for this Tender is 24-05-2023. Water Pump Tenders in Thiruvallur Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

37619705
Nctps-I - M.Ii Circle – Ahp Dn. - Breakdown And Shutdown Maintenance Works In Ash Slurry Disposal Pumps (Pump Capacity Of 930 M3/Hr). Ash Water Pumps, Seal Water Pumps, Flushing Water Pumps.Drain Pumps And Sea Water Booster Pumps, Slurry Line Valves, Make
Open Tender
Indian
Tamil Nadu
Thiruvallur
24-05-2023

Tender Details

Nctps-I - M.Ii Circle – Ahp Dn. - Breakdown And Shutdown Maintenance Works In Ash Slurry Disposal Pumps ( Pump Capacity Of 930 M3 / Hr ) . Ash Water Pumps, Seal Water Pumps, Flushing Water Pumps.Drain Pumps And Sea Water Booster Pumps, Slurry Line Valves, Make Up Line Valves, C.B. Pipes, And Renewal Of Gland Rope And V Belts For A Period Of 6 Months From Date Of Handing Over The Site

Key Value

Document Fees
Refer document
EMD
INR 47900.0 /-
Tender Value
Refer document

BOQ Items

NCTPS-I - M.II Circle – AHP Dn. - Breakdown and shutdown maintenance works in Ash slurry disposal pumps (Pump capacity of 930 m3/hr). Ash water pumps, Seal water pumps, Flushing water pumps.Drain pumps and Sea Water Booster pumps, slurry line valves, make up line valves, C.B. Pipes, and renewal of gland rope and V belts for a period of 6 months from date of handing over the site.
Sl. No. Item Description
1ASH SLURRY DISPOSAL PUMP:Removing the suction pipe, discharge pipes and decoupling from the motor by removing the V-belt and dismantle the pump internals then remove the bearing housing from bed, open and inspection of bearings, Bearing bed, shaft, outer casing, inner casing, impeller, expeller, wear plates, gland housing, sleeve and liquid thrower. Including consumables and T&P’s.
2ASH SLURRY DISPOSAL PUMP:Rectification the suction side cover, bracket side cover seating area of outer casing and renew the above items and re-assemble back.Fix the suction and discharge pipe and V-belts and commissioning the pump. Including consumables and T&P’s.
3SUCTION / DISCHARGE VALVE FOR ASH SLURRY DISPOSAL PUMP:Removal of 336 dia slurry line valve from the line, and reconditioning the worn outportion of valve body and gate. Including consumables and T&P’s.
4SUCTION / DISCHARGE VALVE FOR ASH SLURRY DISPOSAL PUMP:PFixing in the 336 dia slurry line valve in the line. Including consumables and T&P’s.
5ASH SLURRY DISPOSAL LINE:Charges for Renewal of worn out punctured cast basalt pipe end by fabricated distance piece of required length (below 6.0 mtr.) in Ash slurry disposal line 406 OD, and grinding and welding with flange and fixed. Including consumables and T&P’s.
6ASH SLURRY DISPOSAL PUMP:Removing the suction pipe and removing the outer casing and removing the foreign materials and reassembling. Including consumables and T&P’s.
7ASH SLURRY DISPOSAL PUMP: Renewal of V-belts / tightening the V-belts in Ash slurry disposal pump. Including consumables and T&P’s.
8ASH WATER PUMP:Decoupling the Ash water pump dismantling the pump casing pump internals, inspection of impeller, shaft, wear ring shaft sleeves, bearings, lock nut and metal filling in the worn out area of upper & lower casing and impeller hub and grinding, renew the above items and assemble back. Including consumables and T&P’s.
9ASH WATER PUMP:Align with motor and commissioning the pump. Including consumables and T&P’s.
10ASH WATER PUMP:Cut the damaged/ worn-out portion of impeller hub and turning the hub bore. Including consumables and T&P’s.
11ASH WATER PUMP:Insert the correct size SS 316 bar in to the trued hub bore taking V Groove, welding and machining, boaring the bar to the required size, taking key way. Including consumables and T&P’s.
12ASH WATER PUMP:Machining the new pump shaft (SS 316) to suit the impeller bore and fixing the impeller in the shaft and checking the trueness in the shaft. Including consumables and T&P’s.
13ASH WATER PUMP:Renewal of shaft impeller key in the AWP and alignment of pump with motor. Including consumables and T&P’s.
14SEALING WATER PUMP:Decoupling and dismantling the pump internals (All the 11 stages) Inspection of Impellers, Diffuser with Guide vane, stage casing, wear rings, shaft, bearings and metal filling in the worn out Hub and grinding and renew the above items and assemble back. Including consumables and T&P’s.
15SEALING WATER PUMP:Aligning the pump and commissioning. Including consumables and T&P’s.
16DRAIN PUMP:Disconnect the discharge pipe decouple the motor, dismantle the pump and inspection/ renewal of spares and re-assemble and commissioning of pump.
17DRAIN PUMP:Removing the suction and discharge and cooling lines and renewing the damaged flanges with new one and re-fixing the line and commissioning.
18SEA WATER BOOSTER PUMP :Decoupling and dismantling the pump alignment of pump with motor after completion of assembling work. Including consumables and T&P’s.
19SEA WATER BOOSTER PUMP :Renew the bearings, impeller, shaft sleeve and assembling the pump. Including consumables and T&P’s.
20ASHWATER TANK VALVE:Renewal of 450 dia B/F valve from the line and including attending minor repair works. Including consumables and T&P’s.
21Alignment of pump with Motor in AWP / SWP / FWP / SWBP. Including consumables and T&P’s.
22Renewal of gland rope the ASDP / AWP / SWP / FWP / SWBP / D.P. Including consumables and T&P’s.
23Patch welding over the worn out suction & discharge pipe of ASDP / AWP / FWP / SWP / D.P. / S.W.B.P. Including consumables and T&P’s.
24ASH WATER STRAINER:Cleaning 600mm strainer by dismantling of top cover of strainer body, removal of filter element, complete cleaning of filter element and strainer body, filter mesh and strengthening stiffener rod, re assembling the filter element, fixing the top cover, leak checking. Including consumables and T&P’s.
25FLUSHING WATER PUMP:Decoupling the flushing water pump, dismantling the pump casing, pump internals inspection of impeller, shaft, wear rings, shaft sleeve bearings, locknut and metal filling in the worn out area of upper & lower casing and impeller hub and grinding. Including consumables and T&P’s.
26FLUSHING WATER PUMP:Renewal of worn out spares and re-assembling the pump and aligning the pump with motor and commissioning. Including consumables and T&P’s.
27ASH SLURRY SUMP:Removal the floating materials from the slurry sump and disposal the materials, transporting the floated material to low lying area dumping, dozing and leveling into dumped ash. Including consumables and T&P’s.
28ASH SLURRY SUMP:Cut and remove the grills over the ash slurry sump and re-fixing the grills over the sump. (Total 42.53 m2 x 3 Units = 127.59). Including consumables and T&P’s.
29ASH SLURRY SUMP:Picking the foreign material and clinkers from the trash screen which is located (- 6m) in the ash slurry sump and disposal the materials, transporting the material to low lying area, dumping, dozing and levelling. Including consumables and T&P’s.
30ASH SLURRY DISPOSAL PUMP:Rectification of gland housing for ash slurry disposal pump. Including consumables and T&P’s.
31ASH SLURRY DISPOSAL PUMP:Rectification of impeller hub for ash slurry disposal pump. Including consumables and T&P’s.
32FILTRATION PLANT VALVES:Replacement / overhauling the worn out 300 dia B/F valve from the line. Including consumables and T&P’s.
33FILTRATION PLANT VALVES:Replacement / overhauling the worn out 125 dia B/F valve / diaphragm valve from the line. Including consumables and T&P’s.
34FILTRATION PLANT VALVES:Cleaning of equipments like ash water pump, sealing water pump, flush water pump, drain pump, Ash slurry pumps and connected pipe lines and valves and maintaining the ash water pump house Unit I, II & III including arresting leak providing by clamping. Including consumables and T&P’s.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail