Tender For Water Supply Scheme Urgent And Petty Work Of Electrical And Mechanical Nature Mc Morshi For Water Supply Department For The Year 2023-24
Tender Overview
Project Description
Water Supply Scheme Urgent And Petty Work Of Electrical And Mechanical Nature Mc Morshi For Water Supply Department For The Year 2023-24- 1 Labour Charges Of Big Work / Installation Of Parts / Item ( E.G. Machine Opening And Fixing And Fixing Coil Winding / Other Part Fixing. Transformer Repair Etc And Other Related To Water Supply Scheme Requires Atleast One Full Day ) 2 Labour Charges For Petty Work / Installation Of Item / Part ( E.G. Installation Of Small Motor, Valve And Other Minor Componenet Repair Requires Not More Than 2-3 Hours ) 3 Auto Transfarmer Cleaning Rewinding Of Coils With New Winding 4 11 Kv Ht Transformer Cleaning Rewinding Of Coils With New Winding 5 New Transformar Oil 6 Breather For 250 Kv A Transformer New 7 Duel Timer Coil 230 V 8 Duel Timer Coil400 V 9 Contacter Star Delta 10 Contacter Men 110 A 11 Contacter Men200 A 12 Indicater Bulb 230 V 13 Indicater Bulb 1.5 W 14 On Push Button 15 Off Push Button 16 Overload Relly 17 Valt Meter 110 Mm Score 18 Amper Meter 110 Mm Score 19 Current Transformer ( C.T ) Set 20 Bus Bar Support 21 Ondiche Timer Current Transformer 22 Power Capicter Rating 20 Kv Rr 23 Power Capicter Rating 15 Kv Rr 24 Power Capicter Rating 10Kv Rr 25 Power Capicter Rating440 Kv Rr 26 Moter Pump Packing Russhi 27 Moter Pump Ruber Pully 28 Moter Pump Bead Star Pully 29 Mccb Winbreak 250 Af 3 P 30 Bch Pneumatic Timers Pcn Time Delay Relay 1802 No +2 Nc 31 T Contactor 140 A 3 P 32 Rccb 63 A , 30 Aresidual Currentcircuit Breaker 33 Elcb ( Earth Leakage Circuit Breaker ) 10 A 34 Elcb ( Earth Leakage Circuit Breaker ) 16 A 35 Elcb ( Earth Leakage Circuit Breaker ) 32 A 36 Elcb ( Earth Leakage Circuit Breaker ) 48 A 37 11 Kv Lt Hrc Fuse 25 A Din-Pdd F 11 38 11 Kv Ht Hrc Fuse 20 A Din-Pdd F 11 39 Bs Type Hrc Fuse 32 A 40 Bs Type Hrc Fuse 63 A 41 Bs Type Hrc Fuse 125 A 42 Bs Type Hrc Fuse 200 A 43 Bs Type Hrc Fuse 315 A 44 Bs Type Hrc Fuse 400 A 45 New Moter Revanding 120 Hp 46 New Moter Revanding 75 Hp 47 New Moter Revanding 60 Hp 48 New Moter Revanding 50 Hp 49 New Moter Revanding 40 Hp 50 230 V, 1.85 M Cooler Pump 51 3 Phase Vacum Air Pump 52 3 Phase Induction Moter 53 Moter New Bearing 120 Hp 54 Moter New Bearing 75 Hp 55 Moter New Bearing 60 Hp 56 Moter New Bearing 50 Hp 57 Moter New Bearing 40 Hp 58 3 Phase Vacum Air Pump New Bearing 59 3 Phase Induction Moter New Bearing 60 Moter Pump New Bruss Busing 120 Hp 61 Moter Pump New Bruss Busing 75 Hp 62 Moter Pump New Bruss Busing 60 Hp 63 Moter Pump New Bruss Busing 50 Hp 64 Moter Pump New Bruss Busing 40 Hp 65 1.85 M Cooler Pump New Busing 66 Moter Pump New Oil Seal 120 Hp 67 Moter Pump New Oil Seal 75 Hp 68 Moter Pump New Oil Seal 60 Hp 69 Moter Pump New Oil Seal 50 Hp 70 Moter Pump New Oil Seal 40 Hp 71 Moter Pump Steel Rods 120 Hp 72 Moter Pump Steel Rods 75 Hp 73 Moter Pump Steel Rods 60 Hp 74 Aluminiam Armoured Cables 75 Copperarmoured Cables 76 Electricalwires 1.5 Sq Mm 77 Electricalwires 2.5 Sq Mm 78 Electricalwires 4 Sq Mm 79 Electricalwires 6 Sq Mm 80 Electricalwires 10 Sq Mm 81 Electricalwires 16 Sq Mm 82 Electricalwires 25 Sq Mm 83 Electricalwires 35 Sq Mm 84 Electricalwires 50 Sq Mm 85 Electricalwires 70 Sq Mm 86 Electricalwires 95 Sq Mm 87 Electricalwires 120 Sq Mm 88 Electricalwires 150 Sq Mm 89 Electricalwires 185 Sq Mm 90 Aluminiam Cable Lags 91 Copper Cables Lags
BOQ
| Sl. No. | Item Description |
| 1 | Labour charges of Big work/installation of parts/item (e.g. machine opening and fixing and fixing coil winding/other part fixing. Transformer repair etc and other related to water supply scheme requires atleast one full day) |
| 2 | Labour charges for petty work/installation of item/part (e.g. installation of small motor, valve and other minor componenet repair requires not more than 2-3 hours) |
| 3 | Auto transfarmer cleaning rewinding of coils with new winding |
| 4 | 11 KV HT Transformer cleaning rewinding of coils with new winding |
| 5 | New transformar oil |
| 6 | Breather for 250 KV A Transformer new |
| 7 | Duel timer coil 230 V |
| 8 | Duel timer coil400 V |
| 9 | Contacter star Delta |
| 10 | Contacter men 110 A |
| 11 | Contacter men200 A |
| 12 | Indicater bulb 230 V |
| 13 | Indicater bulb 1.5 W |
| 14 | On push button |
| 15 | OFF push button |
| 16 | Overload relly |
| 17 | Valt meter 110 mm score |
| 18 | Amper meter 110 mm score |
| 19 | Current transformer ( C.T) set |
| 20 | Bus bar support |
| 21 | Ondiche timer current transformer |
| 22 | Power capicter rating 20 KV RR |
| 23 | Power capicter rating 15 KV RR |
| 24 | Power capicter rating 10KV RR |
| 25 | Power capicter rating440 KV RR |
| 26 | Moter pump packing russhi |
| 27 | Moter pump ruber pully |
| 28 | Moter pump bead star pully |
| 29 | MCCB winbreak 250 AF 3 P |
| 30 | BCH pneumatic timers PCN time delay relay 1802 NO +2 NC |
| 31 | T contactor 140 A 3 P |
| 32 | RCCB 63 A ,30 AResidual currentcircuit breaker |
| 33 | ELCB ( Earth Leakage Circuit Breaker ) 10 A |
| 34 | ELCB ( Earth Leakage Circuit Breaker ) 16 A |
| 35 | ELCB ( Earth Leakage Circuit Breaker ) 32 A |
| 36 | ELCB ( Earth Leakage Circuit Breaker )48 A |
| 37 | 11 KV LT HRC fuse 25 A Din-PDD F 11 |
| 38 | 11 KV HT HRC fuse 20 A Din-PDD F 11 |
| 39 | BS Type HRC fuse 32 A |
| 40 | BS Type HRC fuse 63 A |
| 41 | BS Type HRC fuse 125 A |
| 42 | BS Type HRC fuse 200 A |
| 43 | BS Type HRC fuse 315 A |
| 44 | BS Type HRC fuse 400 A |
| 45 | New moter revanding 120 HP |
| 46 | New moter revanding 75 HP |
| 47 | New moter revanding 60 HP |
| 48 | New moter revanding 50 HP |
| 49 | New moter revanding 40 HP |
| 50 | 230 V, 1.85 m cooler pump |
| 51 | 3 Phase vacum air pump |
| 52 | 3 Phase induction moter |
| 53 | Moter new bearing 120 HP |
| 54 | Moter new bearing 75 HP |
| 55 | Moter new bearing 60 HP |
| 56 | Moter new bearing 50 HP |
| 57 | Moter new bearing 40 HP |
| 58 | 3 Phase vacum air pump new bearing |
| 59 | 3 Phase induction moter new bearing |
| 60 | Moter pump new bruss busing 120 HP |
| 61 | Moter pump new bruss busing 75 HP |
| 62 | Moter pump new bruss busing 60 HP |
| 63 | Moter pump new bruss busing 50 HP |
| 64 | Moter pump new bruss busing 40 HP |
| 65 | 1.85 m cooler pump new busing |
| 66 | Moter pump new oil seal 120 HP |
| 67 | Moter pump new oil seal 75 HP |
| 68 | Moter pump new oil seal 60 HP |
| 69 | Moter pump new oil seal 50 HP |
| 70 | Moter pump new oil seal 40 HP |
| 71 | Moter pump steel rods 120 HP |
| 72 | Moter pump steel rods 75 HP |
| 73 | Moter pump steel rods 60 HP |
| 74 | Aluminiam armoured cables |
| 75 | Copperarmoured cables |
| 76 | Electricalwires 1.5 Sq mm |
| 77 | Electricalwires 2.5 Sq mm |
| 78 | Electricalwires 4 Sq mm |
| 79 | Electricalwires 6 Sq mm |
| 80 | Electricalwires 10 Sq mm |
| 81 | Electricalwires 16 Sq mm |
| 82 | Electricalwires 25 Sq mm |
| 83 | Electricalwires 35 Sq mm |
| 84 | Electricalwires 50 Sq mm |
| 85 | Electricalwires 70 Sq mm |
| 86 | Electricalwires 95 Sq mm |
| 87 | Electricalwires 120 Sq mm |
| 88 | Electricalwires 150 Sq mm |
| 89 | Electricalwires 185 Sq mm |
| 90 | Aluminiam cable lags |
| 91 | Copper cables lags |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender