}

Tender For Construction Of Chambal Mata Statue And Castle Building With Approach Road For Inspection Down Stream Of Kota Barrage Chambal River Front Kota, kota-Rajasthan

Urban Improvement Trust-UIT has published Tender For Construction Of Chambal Mata Statue And Castle Building With Approach Road For Inspection Down Stream Of Kota Barrage Chambal River Front Kota. Submission Date for this Tender is 18-05-2023. Road Work Tenders in kota Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

37607184
Tender For Construction Of Chambal Mata Statue And Castle Building With Approach Road For Inspection Down Stream Of Kota Barrage Chambal River Front Kota
Open Tender
Indian
Rajasthan
kota
18-05-2023

Tender Details

Construction Of Chambal Mata Statue And Castle Building With Approach Road For Inspection Down Stream Of Kota Barrage Chambal River Front Kota

Key Value

Document Fees
INR 7500 /-
EMD
INR 625200.0 /-
Tender Value
INR 3.12 Crore /-

BOQ Items

Name of Work: Construction of Chambal Mata Statue & Castle Building with Approach Road for Inspection Down Stream of Kota Barrage Chambal River Front Kota
Sl. No. Item Description
1Providing, laying, spreading and compacting crushed graded stone aggregate as per Table 400-10 & 400.11 to Wet Mix Macadam specifications including premixing the Material with water to OMC in mechanical mixer (Pug mill) as per design mix, carriage of mixed Material by tipper to site laying in uniform layers, with motor grader/F.E. loader/Paver Finisher, in sub-base/base course on a well prepared under-base and compacting with Vibratory Roller to achieve the desired density including lighting, guarding, barricading and maintenance of Driversion etc. (MoRTH specification : Clause 406). with all lead & lift
2Providing and Laying cement concrete M-10 grade mix base/sub-base using cement, sand, flyash and coarse aggregates proportioned as per Table 4 of IRC:74-1979 and with water content ratio, slump and compressive strength as defined in the said Table, mix prepared in a batching and mixing plant and compacted with a vibratory roller 8-10 tonnes capacity within the time limit laid down vide Clause 7.6.3 of IRC:74-1979, construction joints properly formed at the end of day’s work, cured for 14 days, all as specified in IRC:74-1979 and as per approved plans.
3Providing and Laying un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub-base with 43 grade cement, coarse and fine aggregate conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or Fix form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures and vacuum processing pump as approved, curing compound, finishing to lines and grades as per drawing as per MoRTH Specification : Clause No. 602, 112. Using Cement concrete M-30 pavement Grade
4Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix
5Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. M20 grade Nominal Mix / Design Mix
6Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc.
7Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :
8Walls (any thickness) including attached pilasters, buttresses plinth and string course.
9Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ("Original producers" who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786)
10Thermo-mechanically Treated bars (Conforming of relevent IS code)
11Providing, arranging and erecting 50mm dia M.S. pipe cup lock shuttering arrangement above the ground level upto the height given below. The girding arrangement of cup lock system should have 2.50 meter 3.00 meter long coupling pipes and 0.90mt long lacer pipe (Horizontal bracing pipes) reconnected in both ways so as to make a square grid of size 0.90x0.90 meter in plan. The Horizontal bracing and lacer pipes should have a maximum spacing of 1.50 meter c/c both ways. The bottom of the coupling pipe must rest over a firm support at ground. the shuttering plates of 900mmx600mm size duly braced by angle supports and should rest over 50mmx50mm size wooden logs supported by 75x40x6mm size channels and U-Jacks made of M.S.25mm dia steel bars with adjustable thread and lock arrangement placed at a spacing of 0.60 meter c/c. The whole arrangement should be duly shored from ground by U-Jacks and lacer pipes to prevent any lateral movement during casting of slabs. Additional support as per direction of engineer in charge are also to by provided wherever felt necessary. The work would include transportation of material erecting the whole grid structure, bracing both way, shoring, leveling of shuttering and removal of form work complete as per direction of Engineer in charge for all the floors upto the height of:-
12Single piece of stone element with carving work in Bansi Paharpur stone includes stone pillar, stone base, todies and thabi etc carving work as per direction of engineer in charge
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail