Eos To Improvementestimate Forderated Of Thalaikattupuram Ss Ii /50Kvato 25Kva And Dismantled 50Kva Dt Erection Of New Proposed M.Kumareddiyapuramss /50Kva Pillaiyarnatham Feeder At Vilathikulam Ss Due To Voltage Complaint In Ettayapuram Section And Impro
Tender Overview
Project Description
Eos To Improvementestimate Forderated Of Thalaikattupuram Ss Ii / 50Kvato 25Kva And Dismantled 50Kva Dt Erection Of New Proposed M.Kumareddiyapuramss / 50Kva Pillaiyarnatham Feeder At Vilathikulam Ss Due To Voltage Complaint In Ettayapuram Section And Improvementestimate For Providing Of Tie Switch Arrangement Between 3NoS 11Kv Feeder Such As Salnaikenpatti Feeder, Semaputhur Feeder, And 11Kv North Thittankulam Feeder By 4Pole Structure In 110 / 33-11Kv Vijayapuri Ss . And Others
BOQ
| Sl. No. | Item Description |
| 1 | Loading and unloading of 9.0 M PSC Pole |
| 2 | Transporting of 9.0 M PSC Pole |
| 3 | Excavation & Erectionof 9.0 M PSC Pole Normal ground |
| 4 | Loading and unloading of 8.0 M PSC Pole |
| 5 | Transporting of 8.0 M PSC Pole |
| 6 | Excavation & Erectionof 8.0 M PSC Pole Normal ground |
| 7 | Erectionof VX Arm, TI Fitting,Wih Insulator |
| 8 | Excavation and Eection ofStay set complete on Normal Ground |
| 9 | Erection of 25KVA DT |
| 10 | Fixing of Tapping channel |
| 11 | Erection of 1Ph X arm with insulator |
| 12 | Fixing of11KV Disc With Metal Parts |
| 13 | Erection of DT Structure |
| 14 | Alternation of Clamps(Stay clamps& Back clamps) |
| 15 | StringingandSagging of 7/2.59MM ACSR |
| 16 | Dismantling of 7/2.59MM ACSR |
| 17 | Dismantling of 1Ph X arm |
| 18 | Dismantling of 3Ph X arm |
| 19 | Dismantling of Stay set |
| 20 | Dismantling of 50KVA DT |
| 21 | Pole Earthing |
| 22 | Pole Concreting |
| 23 | Loading and unloading of 9.0 M PSC Pole |
| 24 | Transporting of 9.0 M PSC Pole |
| 25 | Excavation & Erectionof 9.0 M PSC Pole Normal ground |
| 26 | Erection of Top channel X arm |
| 27 | Erection of 1Ph X arm |
| 28 | Erection of VX Arm |
| 29 | Erectionof Tapping channel |
| 30 | Excavation and Eection ofStay set complete on Normal Ground |
| 31 | Erection of bus bar arrangement |
| 32 | Erection of 11KV AB Switch |
| 33 | StringingandSagging of 7/2.59MM ACSR |
| 34 | Pole Earthing |
| 35 | E.P.F. @13 % should be Entered by the Bidder |
| 36 | E.S.I. @3.25 % should be Entered by the Bidder |
| 37 | G.S.T. @18% should be Entered by the Bidder |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender