|
| 1 | Material |
| 2 | Insulation Piercing Satellite connector â?? Main : 16 sq mm to 95 sq mm; Tap : 4 sq mm to 50 sq mm (4 way) |
| 3 | Aerial Bunched Cable LT 3x70 + 1x50 + 1x16 sq.mm (Insulated Messenger) |
| 4 | End Cap for ABC 50 Sq mm |
| 5 | End Cap for ABC 16 Sq mm |
| 6 | Anchoring /Dead end Clamp Assembly for LT AB Cables up to 70 sq.mm |
| 7 | End Cap for ABC 70 Sq mm |
| 8 | Stainless Steel Buckle Slot width 20.5 mm x 1.5 mm,Thickness 1.2 mm. |
| 9 | Cable Tie UV Plastic Heavy Duty 500 mm Length |
| 10 | Stainless Steel Strap 20 mm x 0.7 mm |
| 11 | Suspension Clamp Assembly for LT AB Cables up to 70 sq.mm |
| 12 | Pre-Insulated Midspan Joints and Terminal Lugs 16 Sq.mm |
| 13 | Pre-Insulated Midspan Joints and Terminal Lugs 50 Sq.mm |
| 14 | Pre-Insulated Midspan Joints and Terminal Lugs 70 Sq.mm |
| 15 | Insulation Piercing Connector - Main: 16 sq mm to 95 sq mm; Tap : 16 sq mm to 95 sq mm |
| 16 | Stainless steel Buckles [20.5 mm x 1.5 mm; thickness 1.2 mm] |
| 17 | Pre- Insulated Crimping Socket Palm Type 70 Sq.mm -Bimetallic (For ABC) |
| 18 | Pre- Insulated Crimping Socket Palm Type 16 Sq.mm -Bimetallic (For ABC) |
| 19 | Pre- Insulated Crimping Socket Palm Type 50 Sq.mm -Bimetallic (For ABC) |
| 20 | Insulation Piercing Connector - Main: 16 sq mm to 95 sq mm; Tap : 1.5 sq mm to 16 sq mm |
| 21 | Satellite connector â?? Main : 16 sq mm to 95 sq mm; Tap : 4 sq mm to 50 sq mm (4 way) |
| 22 | Cable Tie UV Plastic Heavy Duty 300 mm Length |
| 23 | Pipe GI 40 mm dia 2.5 mt length (Earth Pipe) |
| 24 | Satellite connector â?? Main : 16 sq mm to 95 sq mm; Tap : 1.5 sq mm to 35 sq mm (4 way) |
| 25 | Stainless Steel Strap [20 mm x 0.7 mm] |
| 26 | GI Wire 8 SWG |
| 27 | Pipe GI 40 mm dia -2.5 m Length( Earth Pipe) |
| 28 | IPC FOR LT ABC3X70+1X50+1X16 Tap 1.5 - 10 sq .mm |
| 29 | IPC for LT ABC 3X70 + 1X50 + 1X16 Tap 16-70 sqmm |
| 30 | Earth Pit Chamber 18X18 cm PVC |
| 31 | G.I.WIRE. 4MM (8 SWG) |
| 32 | BOLT & NUT GI OF SIZES |
| 33 | Earth Connector 95 Sqmm |
| 34 | Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug) |
| 35 | Labour |
| 36 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 37 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 38 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 39 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 40 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 41 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 42 | Providing End Caps |
| 43 | Erection of suspension clamp for LT ABC of any size |
| 44 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 45 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 46 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 47 | Installation of Insulation piercing connector for main to service line main :25-95 sqmm, Tap : 25-95 sqmm |
| 48 | Renewing one LT Jumper connection using Copper/ACSR conductor as per standard specification. |
| 49 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 50 | Singe Phase Satellite connectors upto 4 service main connections (25-95 ABC/2.5-25 sqmm SM wire-2No) |
| 51 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 52 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 53 | Dismantling one ordinary street light/CFL/LED fitting from pole, repairing and refitting the same in position and giving connection. |
| 54 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 55 | Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock. |
| 56 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |