|
| 1 | LABOUR FOR ERECTION OFBREAKER USING CRANE |
| 2 | ERECTION OF 33KV LAS |
| 3 | LABOUR FOR ERECTION OFISOLATORS WITH PROPER ALLINGMENT INCLUDING ACCESSORIES. |
| 4 | LABOUR FOR THE ERECTIONSUPPLY AND SUITABLE MODIFICATION OF END CLAMPS , PROVIDING HOLES WHEREVER NECESSARY. |
| 5 | LABOUR FOR THE ERECTION OF JUMPER/DROPPERSMODIFICATION OF END CLAMPS. |
| 6 | LABOUR FOR LAYING OF CABLE IN DUCT/TRENCH/CLAMPING ON STRUCTURES. |
| 7 | SUPPLY AND GLANDING OF ISI MARK CABLE GLAND OF SUITABLESIZE. |
| 8 | CIVIL WORK INCLUDING FOUNTATION |
| 9 | LABOUR FOR ERECTION OF EASUREMENT TRANSFORMERS,REACTOR UNITS,USING CRANE ARRANGED . |
| 10 | LABOUR FOR THE ERECTION OF JUMBER / DROPPERS MODIFICATION OF END CLAMBS. |
| 11 | LABOUR FOR DISMANTLING OF MEASUREMENT TRANSFORMER CRANE INCLUDING ALL CONSUMABLES. |
| 12 | LABOUR FOR ERECTION OF BREAKER USING CRANE ARRANGED BY THE CONTRACTOR. |
| 13 | LABOUR FOR THE ERECTION & DISMANTLING OF JUMBER / DROPPERS MODIFICATION OF END CLAMBS,PROVIDING HOLES ETC. |
| 14 | LABOUR FORDISMANTLING OF BREAKER USING CRANE ARRANGED BY THE CONTRACTOR . |
| 15 | ERECTION OF POLE |
| 16 | ERECTION OF GUARDING X ARM |
| 17 | ERECTION OF V X ARM |
| 18 | ERECTION OF INSULATORS |
| 19 | ERECTION OF STAY SET |
| 20 | ERECTION OF POLE EARTHING |
| 21 | ERECTION OF JUMBERING |
| 22 | ERECTION OF ACSR 7/4.09 |
| 23 | ALTRATION OF CLAMPS |
| 24 | DISMANTLING OF ACSR 7/4.09 |
| 25 | Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 26 | Rocky ground- Erection of stay set |
| 27 | Loading charges of cement |
| 28 | Unloading charges of cement |
| 29 | Stacking charges |
| 30 | Fixing of V & Channel cross arm 5.5\" including transporting of materials from road side to site |
| 31 | Fixing of V & Channel cross arm 4.5\" including transporting of materials from road side to site |
| 32 | Fixing of V & Channel cross arm 3.5\" including transporting of materials from road side to site |
| 33 | Fixing of LT 3Phase cross arm including transporting of materials from road side to site |
| 34 | Fixing of LT 1Phase cross arm including transporting of materials from road side to site |
| 35 | Fixing of HT LT TI fitting including transporting of materials from road side to site |
| 36 | Erection of HT Side arm with stud including transporting of materials from road side to site |
| 37 | Erection of LT Side arm with stud including transporting of materials from road side to site |
| 38 | Fixing of insulator (per location) including transporting of materials from road side to site |
| 39 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire) |
| 40 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire) |
| 41 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire) |
| 42 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For Dog Conductor (1Span/Wire) |
| 43 | For HT line clear works for For 7/2.59 ACSR (1Span/Wire) |
| 44 | For HT line clear works for For 7/3.35 ACSR (1Span/Wire) |
| 45 | For HT line clear works for For 7/4.09 ACSR (1Span/Wire) |
| 46 | For HT line clear works for ForDog conductor (1Span/Wire) |
| 47 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR |
| 48 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR |
| 49 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/4.09 ACSR |
| 50 | For LT line clear works for For 7/2.59 ACSR (1Span/Wire) |
| 51 | For LT line clear works for For 7/3.35 ACSR (1Span/Wire) |
| 52 | For LT line clear works for For 7/4.09 ACSR (1Span/Wire) |
| 53 | Dismandling of 7/4.09 ACSR |
| 54 | Dismandling of Stay set |
| 55 | Dismandling of 7/2.59 ACSR |
| 56 | Dismandling of 7/3.15 ACSR |
| 57 | Dismandling of 3ph X arm |
| 58 | Dismandling of Single Phase X arm |
| 59 | Dismandling of TI Fitting |
| 60 | Dismandling of insulators |
| 61 | Tree Cutting |
| 62 | Erection of centre support (Including concrete) |
| 63 | Erection of feeder cable with open type fuse unit per feeder and for each addl feeder |
| 64 | Erection of feeder cable with open type fuse unit - for each addl feeder |
| 65 | Erection of feeder cable -Bus bar arrangement with open type |
| 66 | Loading & unloading of Distribution transformer below 250KVA |
| 67 | Loading & unloading of Distribution transformer 250KVA |
| 68 | Loading & unloading of Distribution transformer 500KVA |
| 69 | Plinth work for 500KVA DT with construction material |
| 70 | Tube light erection-1*40W tube light complete set (including transport) |
| 71 | Tube light erection-For SV lamp and mercury lamp complete set (including transport) |
| 72 | Tube light erection-For CFL lamp complete set (including transport) |
| 73 | Manufacturing of clamps 50*8 mm |
| 74 | Manufacturing of clamps 65*10 mm |
| 75 | Alteration of clamps |
| 76 | Corroded pole welding with 4 pieces of charges (incl.Concreting of cement) note:pieces will be supplied by board |
| 77 | Welding joint for new RSJ pole at workshop per foot run of welding |
| 78 | Street light switching pont arrangement |
| 79 | Drilling less than 23mm holes per hole/slatted hole |
| 80 | Cutting of channel |
| 81 | Cutting of Flat |
| 82 | Cutting of Angle |
| 83 | RSJ pole cutting |
| 84 | Tubular pole cutting |
| 85 | Dismandling of RS Joist pole |
| 86 | Fabrication of lightning arrestor frame |
| 87 | LT-Changing of pin point to cut point |
| 88 | HT-Changing of pin point to cut point |
| 89 | Erection of service connection materials-1Ph service |
| 90 | Erection of service connection materials-3Ph service |
| 91 | Dismandling of 8m pole |
| 92 | Dismandling of 9m Pole |
| 93 | Providing jumpering at cut point |
| 94 | complete replacement of worn out earth wire per structure |
| 95 | Labour for manufacturing of open type fuse unit (Materials supplied by board) |
| 96 | Manufacturing of HG fuse stool incl. materials |
| 97 | Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees |
| 98 | Tree clearence in HT or LT location- For coconut trees and Palmrah trees |
| 99 | Painting-Double pole Transformer structure materials (Double coat) |
| 100 | Painting-Pole (Colour washing with distember) 2 Nos |
| 101 | Painting-For transformer only (Double coat with paint) |
| 102 | Numbering of poles without paint (Labour) |
| 103 | Numbering of poles with paint (Labour) |
| 104 | Numbering of Distribution Trnasformer (Painting and writing of name board size-1-1/4*1 incl cost of paint and MS sheet |
| 105 | Writing in seating channel (Paint to be supplied by contractor) |
| 106 | Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by contractor |
| 107 | Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by board |
| 108 | Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by contrcator |
| 109 | Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by board |
| 110 | Set right of leaning HT pole/LT pole including x arms, TI fittings |
| 111 | Transformer structure erection-Excavation of structure pole pits ( Nos) |
| 112 | Transformer structure erection-Erection of structure poles ( Nos) |
| 113 | Transformer structure erection-Excavation of stay pits(4Nos) |
| 114 | Transformer structure erection-Erection of stay set (4Nos) |
| 115 | Transformer structure erection-Concreting of structure poles incl.materials |
| 116 | Transformer structure erection-Concreting of stays incl.materials |
| 117 | Transformer structure erection-Base Concreting |
| 118 | Erection of Structure materials-Top Channel |
| 119 | Erection of Structure materials-Transformer seating channel and belting angle |
| 120 | Erection of Structure materials-AB switch (Complete) |
| 121 | Erection of Structure materials-HG fuse (Complete) |
| 122 | Erection of Structure materials-Jumpering |
| 123 | Erection of Structure materials-HT LAS |
| 124 | Erection of Structure materials-LT LAS |
| 125 | Earthing system-Excavation of 3 Nos. earth pits |
| 126 | Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 3 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection |
| 127 | Earthing system-Mason works for earth pits and structure pole coping (cementsupplied by Contractor) |
| 128 | Earthing system-Painting of transformer structure 2 coats (Labour only) |
| 129 | Earthing system-Painting with Distember paint on poles |
| 130 | Earthing system-Spreading yard jelly and cut stone and bricks including material |
| 131 | Earthing system-Writing of name board and target board |
| 132 | Erection of Tapping structure-Excavation of structure pole pit. |
| 133 | Erection of Tapping structure-Erection of structure pole. |
| 134 | Erection of Tapping structure-Excavation of stay pit. |
| 135 | Erection of Tapping structure-Erection of stay set. |
| 136 | Erection of Tapping structure-Concreting of pole. |
| 137 | Erection of Tapping structure-Concreting of stay. |
| 138 | Erection of Tapping structure-Base Concreting. |
| 139 | Erection of Structure materials-Top channel |
| 140 | Erection of Structure materials-AB switch (complete) |
| 141 | Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing |
| 142 | Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure. |
| 143 | Earthing system-Mason works for earth pit (including material) |
| 144 | Colour coating on poles with iron materials including paint and distember |
| 145 | Transporting of 42\" twin RSJ pole from roadside pole pit |
| 146 | Fabrication of 42\" Twin RSJ pole, Materials supplied by Board. |
| 147 | Excavation & Erection of Twin 42\"2\" fabricated RSJ pole |
| 148 | Concreting of 42\" twin RSJ pole |
| 149 | Singple pole structure erection- 9.0 mtr RCC POLE (square) -Loading & Unloading of poles |
| 150 | Singple pole structure erection- 9.0 mtr RCC POLE (square) -Excavation of pole pit & pole erection |
| 151 | Singple pole structure erection- 9.0 mtr RCC POLE (square) -Transporting road side to pole pit |
| 152 | Singple pole structure erection-Excavation and erection of stay set complete with stay clamps ( with 16mm stay rod with base plate ) |
| 153 | Fixing of single pole structure materials & structure clamps ( Tapping channel - 1 No., Tr.bed, Erection AB switch - 1 set, Erection HG Fuse set - 1 set ) |
| 154 | Erection of 16/25 KVA,11KV / 433 Volts 3 phase |
| 155 | Earthing for 9 mtr RCC structure square pole(3 pits) |
| 156 | Concreting including materials for 9 mtr RCC square pole-Base concreting 1:4:8 500*650*150mm, Pole concreting1:2:4 500*500*1700& Coping 1:2:4 ( as per actuals ) |
| 157 | Concreting including materials for stay sets. (cement, jelly and sand) |
| 158 | Fixing of 11 Kv lighting arrester, metal oxide, 9 KV, 5 KA(HT & LT) |
| 159 | Erection of LT wiring kit ( Double open type circuit) |
| 160 | Fixing of caution / Danger Board as per drawing |
| 161 | Painting of single pole str including iron materials double coat with painting materials |
| 162 | Fixing of guarding X arm |
| 163 | Fixing of Tapping channel X arm |
| 164 | LABOUR FOR THE ERECTIONSUPPLY AND SUITABLE MODIFICATION OF END CLAMPS , PROVIDING HOLES WHEREVER NECESSARY. |
| 165 | LABOUR FOR ERECTION OFISOLATORS WITH PROPER ALLINGMENT INCLUDING ACCESSORIES. |
| 166 | Erection of 33KV LAS |
| 167 | Labour for Erection of Breaker Using Crane |
| 168 | Dismantling of other line materials - (Please mention In percentage for respective line material errection works) |