Department of Cooperation has published Tender For Dismantling Fabrication Erection Jobs. Submission Date for this Tender is 30-05-2023. Clothing Accessories Tenders in nawanshahr Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 17-May-2023 | Corrigendum | Date | 30-05-2023 |
Sl. No. | Item Description |
1 | Dismantling, Fabrication & Erection Jobs |
2 | Dismantling of MS pipe line with flanges, Nipple, Bend, reducers etc.(For Cleaningpurpose) upto 12” |
3 | Erection of MS pipe line with flanges, Nipple, Bend, reducers etc.(For Cleaningpurpose) upto 12” |
4 | Dismantling of MS pipe line upto 12” |
5 | Erection of MS pipe line upto 12” |
6 | Dismantling MS pipe line above 12” |
7 | Fabrication & Erection of MS pipe line above 12” |
8 | Dismantling of MS Bend, Tee, Nipple, reducers, Flanges, Blinds etc. |
9 | Fabrication & Erection of MS Bend, Tee, Nipple, reducers, Flanges, Blinds Etc. |
10 | Dismantling SS pipe line upto 12” |
11 | Erection of SS pipe line Upto 12” |
12 | Dismantling SS pipe line above 12” |
13 | Erection of SS pipe line above 12” |
14 | Dismantling of SS Bend, Tee, Nipple, reducers, Flanges, Blinds upto 12” |
15 | Fabrication & Erection of SS Bend, Tee, Nipple, reducers, Flanges, Blinds upto 12” |
16 | Dismantling of SS Bend, Tee, Nipple, reducers, Flanges, Blinds avobe 12” |
17 | Fabrication & Erection of SS Bend, Tee, Nipple, reducers, Flanges, Blinds above 12” |
18 | Dismantling of valves upto 12” |
19 | Erection of valves upto 12” |
20 | Dismantling of valves above 12” |
21 | Erection of valves above 12” |
22 | Dismantling of MS pipe leading to condenser of Pan/ quad |
23 | Fabrication & Erection of MS pipe leading to condenser of Pan/ quad |
24 | Dismantling of MS Bend leading to condenser of Pan/ quad a) Full Bend |
25 | Dismantling of MS Bend leading to condenser of Pan/ quad. b) Half Bend |
26 | Fabrication & Erection of MS Bend leading to condenser of Pan/qud a) Full Bend |
27 | Fabrication & Erection of MS Bend leading to condenser of Pan/ quad b) Half Bend |
28 | Dismantling of MS plateform. |
29 | Fabrication & Erection of MS plateform. |
30 | Dismantling of Manhole of all sizes including Nipple, Flanges, Blinds etc. |
31 | Fabrication & Erection of Manhole of all sizes including Nipple, Flanges, Blinds etc. |
32 | All welding works/Joints (MS) |
33 | All welding works/Joints (SS) |
34 | Replacement of SS/ Brass Tubes of evaporators, Juice heater, Semikestner, Vapour Cell, Pan during season and off season. |
35 | Plugging of SS/ Brass Tubes of evaporators, Juice heater, Semikestner, Vapour Cell, Pan during season and off season. |
36 | Dismantling, Fabrication and Erection of SS rubber seated valve of all sizes |
37 | Dismantling, Fabrication and Erection of MS rubber seated valve of all sizes |
38 | Fabrication and Erection of liquidation tray for both Mud line of dorr and its outlet pipe to be put into mud receiving tank of RVF. |
39 | Dismantling, Fabrication and Erection of scroll of RVF Mud mixture. |
40 | Dismantling, Fabrication and Erection of Mud tray of RVF. |
41 | Dismantling, Fabrication and Erection of agitator of RVF. |
42 | Dismantling, Fabrication and Erection of Bagacillo cyclone. |
43 | Dismantling, Fabrication and Erection of Juice coil of dorr. |
44 | Dismantling, Fabrication and Erection of grit catcher of Pumps. |
45 | Dismantling, Fabrication and Erection of Strainer of Pumps. |
46 | Dismantling of Juice/ Syrup/Lime receiving tank (Cylindrical or Square) |
47 | Fabrication and Erection of Juice/ Syrup/Lime receiving tank (Cylindrical or Square) |
48 | Dismantling,Fabrication and Erection of bottom of Juice/ Syrup/Lime receiving tank (Cylindrical or Square). |
49 | Dismantling and Erection of double beat valve |
50 | Dismantling,Fabrication and Erection of Juice sulphited spurzer. |
51 | Dismantling ,Fabrication and Erection of bagacillo pipe line |
52 | Dismantling,Fabrication and Erection of juice sulphiter tower. |
53 | Dismantling of Juice sulphiter |
54 | Fabrication and Erection of Juice sulphiter complete in all respect |
55 | Dismantling ,Fabrication and Erection of vapour vent coil of juice heater/semikestner/vapour cell/evaporator/pan etc. |
56 | Replacement of complete wornout MS partition plate including MS strips of juice heater. a) Top Portion |
57 | Replacement of complete wornout MS partition plate including MS strips of juice heater.b) Bottom Portion |
58 | Repair of complete wornout MS partition plate including MS strips of juice heater. a) Top Portion |
59 | Repair of complete wornout MS partition plate including MS strips of juice heater.b) Bottom Portion |
60 | Replacement of complete wornout MS square bar or MS strip of juice heater. a) Top Portion |
61 | Replacement of complete wornout MS square bar or MS strip of juice heater. b) Bottom Portion |
62 | Repair of complete wornout MS square bar or MS strip of juice heater.a) Top Portion |
63 | Repair of complete wornout MS square bar or MS strip of juice heater.b) Bottom Portion |
64 | Dismantling, Fabrication and Erection of primary cooler of sulphur furnace including water coil. |
65 | Dismantling, Fabrication and Erection of secondary cooler of sulphur furnace including water coil. |
66 | Dismantling of MS Gutter (Round or Square) |
67 | Fabrication and Erection of MS Gutter (Round or Square) |
68 | Dismantling,Fabrication and Erection of save all of quad body. |
69 | Dismantling of shell of quad body . |
70 | Fabrication and Erection of shell of quad body. |
71 | Dismantling, Fabrication and Erection of sight glass of quad/ pan |
72 | Dismantling of old semikestner (450 Sqr. Mtr.) |
73 | Dismantling ofold damaged condensate storage tank (Round) |
74 | Strengthening of vapour pipe of pan/quad. |
75 | Dismantling, Fabrication and Erection of SS nozzle box of condenser. |
76 | Repair of vapour/Exhaust valves of pan/ quad/ Juice heater etc. above 12” |
77 | Dismantling of shell of pan. |
78 | Fabrication and Erection of shell of pan |
79 | Dismantling, Fabrication and Erection of Top cone of pan complete |
80 | Dismantling, Fabrication and Erection of Bottom cone of pan complete |
81 | Dismantling, Fabrication and Erection of venturey of condenser. |
82 | Dismantling, Fabrication and Erection of umbrella of pan |
83 | Replacement of wornout baffles plate of pan. |
84 | Dismantling, Fabrication and Erection of feeding header of pan. |
85 | Dismantling and erection of Pan condenser complete. |
86 | Dismantling of Syrup/ Molasses storage tank at pan. |
87 | Fabrication and Erection of Syrup/ Molasses storage tank at pan. |
88 | Dismantling of worrn/worm wheel of crystallizer and fitting of planetary gear box with motor. |
89 | Dismantling, Fabrication and Erection of damaged arms/scroll of crystallizer. |
90 | Dismantling, Fabrication and Erection of central shaft of horizontal crystallizer. |
91 | Dismantling, Fabrication and Erection of plain MS plate hoper. |
92 | Dismantling, Fabrication and Erection of drive portion of MS hopper (Approximate 2 mtr.) |
93 | Dismantling, Fabrication and Erection of tray pieces of MS hoper. |
94 | Dismantling of hot air blower and erection of new electrical type hot air blower including inlet air ducting in both nearby hoppers. |
95 | Replacement of wornout bottom round portion of horizontal crystallizer. |
96 | Fabrication and erection of shed for electric motor, panel boards and any other machinery |
97 | Straightening of MS old plate to be used as platform. |
98 | Dismantling, Fabrication and Erection of all wornout beam, channel, angle etc. |
99 | Cutting of SS/Brass tubes |
100 | Dismantling and Erection of air compressor with motor and bed frame. |
101 | Fabrication and Erection of bed frame for motor and pump |
102 | Dismantling and Erection of various sizes pumps and motors. |
103 | Repair of MS fabricated valves having sizes 14” & above complete in all respect such as internal/External body, seat plate, Ring, Spindle Etc. |
104 | Repair of donally chute i.e. replacement of wornout plate. |
105 | Dismantling and refitting of 02 Nos. NK1100 continues Cfg. Machine at its existing position after Strengthening of base girder, channels,Angles Etc. Also to replace rubber pads, repair of bottom portion of machine Etc. and master level position to be done to avoid any wobbling with satisfactory trial. |
106 | A Suitable structure of MS beam, channel etc. to be made to remove basket of WIL 1501 continue Cfg. Machine. |
107 | Fabrication of inter & secondary carrier Racks. |
108 | Replacement of bottom of maceration water tank. |
109 | Replacement of bottom cone of round and square tank of mill house. |
110 | Replacement of wornout side plates of all carriers. |
111 | Dismantling, Fabrication and Erection of Hood chopper/Leveller/Fibrizer. |
112 | Dismantling, Fabrication and Erection of wornout bottom boot of inter rack carrier |
113 | Dismantling, Fabrication and Erection of side boxes of secondary/inter rack carrier and RBC. |
114 | Replacement of wornout RBC/ secondary cane carrier andinter carrier trough. |
115 | Dismantling,Fabrication and Erection of radius portion of bagasse elevation chain/ RBC chain complete. |
116 | Dismantling and Erectionflat of runner of all carriers. |
117 | Replacement of M.S. plate of Donga. |
118 | Fabrication of resistance box with blade. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail