| 1 | Supply and delivery of direct online starter confirming to IS13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/Three Phase/50HZ(± 5%) and 415 V(±10%) including Ammeter, Voltmeter, Thermal Overload relay, 16 Amps 2 pole Magnetic Contactor with under Voltage protection, Indication lamp, starting capacitor, running capacitor and On/Off Push button switches, 5 way connector, wiring with 1 sq. mm/1.5 sq. mm copper PVC insulated cable, powder coated vermin proof box including the capacitor (the cost of capacitor is to be taken separately). |
| 2 | 12.5 HP Panel Board |
| 3 | Supply and delivery and fixing ofG I PIPES (MEDIUM) AS PER IS 1239/PART I/2004 including loading, unloading, transportation and labour charges etc.,complete as per standard specification |
| 4 | 80mm dia Gi pipe |
| 5 | 80mm dia gi pipe coupling |
| 6 | 80mm dia GI flane with tail piece |
| 7 | cutting of Gi pipe |
| 8 | cthreading of Gu pipe |
| 9 | Lowering GI pipes and specials in the trenches and laying to proper grade and alignment, jointing with GI Specials and as directed by the TWAD Officers |
| 10 | Removal of centrifugal pumpset/ jet pumps/ submersible pumpsets and its accessories from borewell/ open well for attending repairs 50% of the rates mentioned under Labour charges for the erection of submersible pumpset in borewell/openwell |
| 11 | Above 10.00 HP to 20.00 HP |
| 12 | Re-erection of centrifugal pumpsets, jet pumpsets and its accessories into the borewell/ openwell after attending the repairs 50% of the rate mentioned under Labour charges for the erection of submersible pumpset in borewell/openwell |
| 13 | Above 10.00 HP to 20.00 HP |
| 14 | Rate for flushing of borewell of 6\" dia requiring less than 4 hours operation using drill rods/hose with required size of pipes for various capacity compressor including transportation, labour, and fuel charges for compressors as directed by the Department Officer and conducting yield test by ‘V’ notch method if required.350 to 250Cfm (100 PSI) |
| 15 | Supply of Borewell and Power pump materials and parts required for attanding the repairs in pumps and motors. |
| 16 | 7/20 copper isulated cable |
| 17 | 12.5 HP Submersible motor rotor |
| 18 | 25mm dia pvc covering pipe |
| 19 | Labour charges for attending the repairs and refunctioning of assembly as directed by Department officials. |
| 20 | 12.5HP Submersible motor rewinding charges |
| 21 | Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with switch box with 5A FT switch inflush with wall and covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wire connectionof 14 SWG TC wire for light point / fan point (for electronic regulator) sd01 |
| 22 | light point |
| 23 | Wiring with 2 x 4 sq.mm. (56 / 0.3) PVC insulated SC unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with 150mm x 100mm x 75mm MS switch box in flush with wall with 3mm thick hylum sheet for 15A 3pin non interlocking flush type CS plug with painting suitable colour with continuous earth wire connection of 14 SWG TC wire for open power plug point |
| 24 | 15 ams plug point |
| 25 | Supply and fixing of single box type 4\"40W fluorescent fitting complete with copper choke and condensor with conduit pipe suspension from the ceiling with PVC unsheathed copper leads from erminals to the fitting with tube |
| 26 | tube light |
| 27 | Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. - 10 sq.m |
| 28 | Earthwork excavation of for pipe line trench work including all cost and conveyance of all materials and labour charges etc. complete as per standard specifications |
| 29 | Supply and delivery of PVC portable water supply as per IS 4985/2000 etc., including all cost and conveyance of all materials and labour charges etc. complete as per standard specifications |
| 30 | 90mm dia pvc pipe |
| 31 | Supply and delivery of PVCspecials as per IS 7834/1987 & 10124/1982 part II etc., including all cost and conveyance of all materials and labour charges etc. complete as per standard specifications |
| 32 | 90mm dia pvc bend |
| 33 | 90mm dia coupler |
| 34 | 90mm dia tee |
| 35 | 90mm dia end cap |
| 36 | Laying and jointing of pipe in proper alignment and gradient including all cost and conveyance of all materials and labour charges etc. complete as per standard specifications. |
| 37 | Refilling the excavated earth into excavated trench including all cost and conveyance of all materials and labour charges etc. complete as per standard specifications. |
| 38 | Supply and delivery of CI D/F sluice valve with cap /wheel as per IS 14846/2000 PN 1.0 with ISI marking etc., including all cost and conveyance of all materials and labour charges etc. complete as per standard specifications |
| 39 | PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLECONFIRMING TO IS 694/1990 AND AS AMENDED THEREAFTER. |
| 40 | 10.0 sq.mm |