| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item A) and disposal of excavated earth so obtained to distance up to 50 m and average lift of 1.5 m including levelling, ramming the foundation trenches removing roots or shrubs etc. all complete as perspecification and direction of E/I. (7.1.27) |
| 2 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. PCC Grade M-15 using batching plant & concrete pump. (12.08 CASE I RCD) |
| 3 | Providing and laying plain cemen concrete1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration includimg curing for 14 days) (12.04 RCD) |
| 4 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. RCC Grade M-25 using batching plant & concrete pump. (12.08 E CASE-I RCD) |
| 5 | Plain/Reinforced cement concrete in sub-structre complete as per drawing and Technical specifications. Height upto 5m Rcc grade M25 using batching plant, transit mixer & concrete pump. (13.05 F(P) RCD) |
| 6 | Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification.For solid slab super-structure,20-30% of (a+b+c)Height upto 5m M-25 Using batching plant transit mixture and concrete pump. (14.01 B(I)(p) RCD) |
| 7 | Earth work in filling in foundation trenches and back filling of structure in layers not exceeding 150 mm thick well waterd ,rammed and fully compacted and finely dressed with suitable earth obtained from exvation of foundation trnches and placed in a suitable profile with in a lead of 30 m and lift of 1.5 mall complete as perspecification and direction of E/I. (7.1.31) |
| 8 | Providing weep holes with dry graded stone filter of 20 mm to 40 mm size in abutment and wing wall as per specification and direction of E/I. (6.7.6) |
| 9 | Providing and laying drainage spot complete as per drawing and technical specification. (15.17 RCD) |
| 10 | Providing Dewatering using 10 hp deisel pump. (wrdsor p-83 sr no-10) |
| 11 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (12.42 RCD) |
| 12 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications. (13.06 RCD) |
| 13 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications(14.02 RCD) |
| 14 | Carriage of materials with loading,unloading and stacking at site.Cement - 10km(P) |
| 15 | Steel - 10km(P) |
| 16 | Sand - 30km (25km (P)+5km (U)) |
| 17 | Chips - 78km (76km (P)+2km (U)) |
| 18 | Metal - 78km (76km (P)+2km (U)) |
| 19 | GST 18% |
| 20 | Labour Cess 1% |