Public Health Engineering Department-PHED has published Tender For Providing Drinking Water Supply Facilities To Pilgrims / Security Personals / Local Public At Holy Cave Station 9Thand Maintenance Of Water Supply Scheme During Yatra Period. Providing Tented Accommodation And Refreshment To Field /Supervisory. Submission Date for this Tender is 13-05-2023. Water Supply Project Tenders in Anantnag Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in excavation by manual means in trenches for foundations, drains,pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: |
2 | All kinds of soil. |
3 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. |
4 | 25 mm dia |
5 | 20 mm dia |
6 | Providing / Fixing 10 mm thick M.S Flanges to the G.I pipes including nuts , Bolts & washers ( Complete Job) |
7 | 50 mm dia |
8 | Removing charges of pipes |
9 | 25 mm dia |
10 | 20 mm dia |
11 | Refilling of excavated earth material |
12 | Carrying/ Erecting of standard tent for accomodation purposes for employees from Sub-Dision Store Pahalgam to Holycave & Return back after Completion of Yatra ( note:- Tent available at Sub-Division store Pahalgam) &Providing proper flooring, for tent size 10" x 12"tent bedding ,lighting gas( 2 No"s) cooking gas utensils,04 No.Samrudhi Chairs with table etc complete job( to be supplied to Divisional Store keeper within 7 days after allotment is issued ) and from divisional store office to Chandanwari and back to Sub Divisional Store Pahalgam after yatra is over. |
13 | Supply of essential commodities like ration tea milk suger etc complete job(4 no,s @75 days) |
14 | Carriage of Pipes from Divisional Store to Dumail bt MT inclloading/unloading/stacking complete for an Avg lead 162 Kms |
15 | Carriage of Pipes from Divisional Store to Sub divisional Storebt MT incl loading/unloading/stacking complete for an Avg lead 62 Kms |
16 | Extra carriage of pipes from dumping site upto actual site of work for an average leads depicted against each |
17 | Internal fitting of tolits / baths and dismantling of same after yatra is over ( by way of PVC pipes) (PVC pipes to be provided by Contractor, pipe specials and taps to be provided departmentally) |
18 | Repairments of supply main / Raw water main, Clearance of snow complete Job |
19 | Maintenance of water supply to pilgrims / security personals / local public at Holycave station for yatra period |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail