}

Tender For Strengthening The Road From Kuruvadi-Gandhi Nagar Road Km 0/0-0/420, 2.Strengthening The Road From Elakurichi-Thoothur Road To Vaippur Road In Km 0/0-2/25 For 2 Nos In Package No. Tn 30-44 At Thirumanur Block Of Ariyalur District Under Mgs, ariyalur-Tamil Nadu

District Mineral Foundation Trust has published Tender For Strengthening The Road From Kuruvadi-Gandhi Nagar Road Km 0/0-0/420, 2.Strengthening The Road From Elakurichi-Thoothur Road To Vaippur Road In Km 0/0-2/25 For 2 Nos In Package No. Tn 30-44 At Thirumanur Block Of Ariyalur District Under Mgs. Submission Date for this Tender is 15-05-2023. Road Work Tenders in ariyalur Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

37527762
Corrigendum : Tender For Strengthening The Road From Kuruvadi-Gandhi Nagar Road Km 0/0-0/420, 2.Strengthening The Road From Elakurichi-Thoothur Road To Vaippur Road In Km 0/0-2/25 For 2 Nos In Package No. Tn 30-44 At Thirumanur Block Of Ariyalur District Under Mgs
Open Tender
Indian
Tamil Nadu
ariyalur
15-05-2023

Tender Details

Strengthening The Road From Kuruvadi-Gandhi Nagar Road Km 0/0-0/420, 2.Strengthening The Road From Elakurichi-Thoothur Road To Vaippur Road In Km 0/0-2/25 For 2 Nos In Package No. Tn 30-44 At Thirumanur Block Of Ariyalur District Under Mgsmt 2022-23

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 09-May-2023 Date Extended Date 15-05-2023

Key Value

Document Fees
Refer document
EMD
INR 188000.0 /-
Tender Value
INR 1.87 Crore /-

BOQ Items

Name of Work :1.Strengthening the road from Kuruvadi-Gandhi nagar road Km 0/0-0/4202. Strengthening the road from Elakurichi-Thoothur road to Vaippur road in Km 0/0-2/25 inThirumanur block in Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2022-23 Package No : TN 30-44
Sl. No. Item Description
11.Strengthening the road from Kuruvadi-Gandhi nagar road Km 0/0-0/420 .Picking the existing black top/ WBM surface to 50 MM depthincluding labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification
2Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.
3ProvidingUS Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. (Gravel shoulder)
4Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete..
5Km 0/0- 0/420
6Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per MORD Technical Specification Clause 502
7Km 0/0- 0/420
8Providing and applying Tack Coat with Bitumen emulsion (RS-1) using emulsion distributor at therate of 0.275 kg per sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 502
9Km 0/0- 0/420
10Bituminous Macadam : Providing and laying bituminous macadam with hot mix plant using crushed aggregate of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finished to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.
11Km 0/0- 0/420
12Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
13Km 0/0- 0/420
14KilometreStone Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
15Hectameter Stone
16Guard Stone
17Providing and Fixing of Cautionary,mandatory and informatory sign Board .
18Reflector
19Triangular Signboard
20Providing and laying of hot applied thermoplastic compound 2.50mm thick including refletorising glass beads @ 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc., complete as per MORTH&H specification No.803..
21Km 0/0- 0/420
22Providing and fixing Name Board
23Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
24For the First Year from the date of completion of work
25For the Second Year from the date of cpmpletion of work
26For the Third Year from the date of completion of work
27For the Fourth Year from the date of completion of work
28For the Fifth Year from the date of completion of work
292.Strengthening the road from Elakurichi-Thoothur road to Vaippur road in Km 0/0-2/25 . Clearing and Grubing Road Land Clearing and grubbing road land including uprooting wild vegetation, ,bushes,shrubs,saplings and trees ofgirth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORD Technical Specification Clause 201.(In area of thorny jungle)
30Picking the existing black top/ WBM surface to 50 MM depthincluding labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification.
31Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.
32ProvidingUS Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. (Gravel shoulder)
33Km 0/0- 1/000
34Km 1/000-2/000
35Km 2/000-2/250
36Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete..
37Km 0/0- 1/000
38Km 1/000-2/000
39Km 2/000-2/250
40Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per MORD Technical Specification Clause 502
41Km 0/0 - 2/250
42Providing and applying Tack Coat with Bitumen emulsion (RS-1) using emulsion distributor at therate of 0.275 kg per sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 502
43Km 0/0 - 2/435
44Bituminous Macadam : Providing and laying bituminous macadam with hot mix plant using crushed aggregate of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finished to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.
45Km 0/0- 1/000
46Km 1/000-2/000
47Km 2/000-2/250
48Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
49Km 0/0- 1/000
50Km 1/000-2/000
51Km 2/000-2/250
52Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
53Drianage @ Ch 0 m
54Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick, wellrammed, watered and compacted complete complying as per Technical Specification Clause 305.3.9
55Drianage @ Ch 0 m
56Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying as per drawing and MORD Technical Specification Clause 802,803,1202 and 1203
57Drianage @ Ch 0 m
58Cement concrete 1:2:4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying as per drawing and MORD Technical Specification Clause 802,803,1202 and 1203.
59Drianage @ Ch 0 m
60Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications
61Drianage @ Ch 0 m
62Plastering with cement mortar 1:5 mixto 20 mm thick includingcost and conveyance of all materials to site and all labour
63Drianage @ Ch 0 m
64KilometreStone Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
65Hectameter Stone
66Kilometer Stone
67Guard Stone
68Providing and Fixing of Cautionary,mandatory and informatory sign Board .
69Reflector
70Triangular Signboard
71Providing and laying of hot applied thermoplastic compound 2.50mm thick including refletorising glass beads @ 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc., complete as per MORTH&H specification No.803..
72Km 0/00-2/250
73Providing and fixing Name Board
74Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
75For the First Year from the date of completion of work
76For the Second Year from the date of cpmpletion of work
77For the Third Year from the date of completion of work
78For the Fourth Year from the date of completion of work
79For the Fifth Year from the date of completion of work
80GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail