Civil Works Construction Of Boundary Wall Of Ado Office Campus At Khariar
Tender Value
8.33 Lakhs
Estimated cost
Bid Submission
12 May 2023
0 days left
EMD
8333
Bank guarantee accepted
Document Fee
4000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
khariar → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Civil Works Construction Of Boundary Wall Of Ado Office Campus At Khariar
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in hard soil or gravelly soil within 50m.Initial lead and 1.5m initial lift including roughdressing and breaking clods to maximum 5cm to 7cmand laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. for foundation work, excluding labour cess and GST. |
| 2 | Supplying, filling in foundation and plinth with sand in 22.5 cm thick layers including watering and ramming with cost, conveyance, royalties and taxes of sand with labour and T&P required for the work etc. complete (Measurement will be taken on finished compacted section only)excluding labour cess and GST. |
| 3 | Cement concrete of proportion (1:4:8) in foundation and floors using 4cm size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. thick to the required level ramming, watering, curing etc. complete including cost, conveyance, royalties of all materials with all labour, and T&P required for the work etc. complete in all respect as per the direction of engineer-in-charge, excluding labour cess and GST. |
| 4 | RCC M20 usingblack hard crusher broken granite chips of approved quality from approved quarry including centering and shuttering, hoisting, lowering and laying concrete in layers, watering, curing etc. complete including cost, conveyance, royalties of all materials withT&P etc. Required for the work complete.Excluding the cost and TCand laynig ofHYSD bars as per the direction of engineer-in-charge, excluding labour cess and GST. (Column Base) |
| 5 | Column and beam |
| 6 | Fly Ash brick masonry in cement mortar (1:6) in Plinth & Foundation work using fly ash bricks of 23cm x 11cm x 8cm size having a crushing strength of not less than 75 kg/cm2 with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing including cost, conveyance, royalties and of all materials with all labour,and T&P required for the work complete in all respect in all floors as per the direction of engineer-in-charge, excluding labour cess and GST. |
| 7 | Fly Ash brick masonry in cement mortar (1:6) in Superstructure work using fly ash bricks of 23cm x 11cm x 8cm size having a crushing strength of not less than 75 kg/cm2 with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing including cost, conveyance, royalties and of all materials with all labour and T&P required for the work complete in all respect in all floors as per the direction of engineer-in-charge, excluding labour cess and GST. |
| 8 | 12 mm thick cement plaster (1:6) finished smooth torough surface ofbrick walls after raking out the joints including watering and curing with cost with cost, conveyance, royalties and of all materials with all labour, T&P required for the work etc. complete as per the direction of engineer-in-charge, excluding labour cess and GST.. |
| 9 | Finishing outside walls ceilling with Two coats of Weather Coat paint of approved shade over one coat primer on new andold surfaceafter due cleanngwork and filling the minor cracks with synthetic crack fills to give an even shade with cost, conveyance, royalties and of all materials with all labour and T&P required for the work etc. complete in all respect as per the direction of engineer-in-charge, excluding labour cess and GST. |
| 10 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification including cost, conveyance andof all materials with labour, cess and T&P etc. required for the work complete as per the direction of engineer-in-charge excluding GST. |
| 11 | Filling of Foundation and plinth with excavated earthand levellingas per the direction of engineer-in-charge excluding GST. |
| 12 | Clearance of site with cutting and uprooing of stumps ofthe existing roots of trees including collectionstacking of wood materials and TC of the same from the site and filling of soil in the uprooting area |
AI Tender Summary
Tender Timeline
May 04, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedMay 12, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMay 17, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender