Water Resources and Irrigation Government Departments Closing in 0 days TDR #37511959

Tender For General-Anthiyoor Thodu And Puthuchal Kozhode Thodu-Construction Of Leading Chal Inanthiyoor Idamanakuzhy Thodu Andconstruction Of Side Protection Work In Puthuchal Kozhode Thoduof Balaramapuram Grama Panchayath Andconstruction Of Bridge Near O

Issued by Government Departments · balaramapuram, Kerala
Tender Value
49.95 Lakhs
Estimated cost
Bid Submission
15 May 2023
0 days left
EMD
50000
Bank guarantee accepted
Document Fee
2760
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
balaramapuram → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

General-Anthiyoor Thodu And Puthuchal Kozhode Thodu-Construction Of Leading Chal Inanthiyoor Idamanakuzhy Thodu Andconstruction Of Side Protection Work In Puthuchal Kozhode Thoduof Balaramapuram Grama Panchayath Andconstruction Of Bridge Near Oottukuzhy Kulam And Construction Of Foot Bridge In Venganoor Ela Of Venganoor Grama Panchayath-General Civil Work

BOQ

Work Name:GENERAL-Anthiyoor thodu and Puthuchal Kozhode thodu-Construction of leading chal inAnthiyoor Idamanakuzhy thodu andConstruction of Side protection work in Puthuchal Kozhode thoduof Balaramapuram Grama Panchayath andConstruction of bridge near Oottukuzhy kulam and construction of foot bridge in Venganoor Ela of Venganoor Grama Panchayath-General Civil Work
Sl. No. Item Description
1Appendix A- Construction of leading chal in Anthiyoor Idamanakuzhy thodu
22.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
32.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removingthe roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
42.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removingthe roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
560.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
615.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
715.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
860.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
92.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
1060.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
114.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
124.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
134.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
145.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
155.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
165.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
17OD19134/2022-2023:Name board of size 76*60cm installed in the appropriate place visible to the public made of brick wall with granite plaque should be inserted and engraving letters etc. complete as per the departmental officers at site.
18Appendix B - Construction of Side protection work in Puthuchal Kozhode thodu
192.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
20OD22096/2022-2023:Putting up ring bund by engaging man coolies during the course of construction and removing the bund after the completion of the work etc. complete as directed by the departmental officers atsite
2160.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
222.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2360.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
245.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
255.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
265.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
27OD22099/2022-2023:Name board of size 76*60cm installed in the appropriate place visible to the public made of brick wall with granite plaque should be inserted and engraving letters etc. complete as per the departmental officers at site.
28Appendix C - Construction of bridge near Oottukuzhy kulam
292.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
3060.2.3:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
31OD23023/2022-2023:Putting up ring bund by engaging man coolies during the course of construction and removing the bund after the completion of the work etc. completed as directed by the departmental officers at site
3260.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
3360.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
342.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
3560.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
364.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
374.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
385.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
395.9.20:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform with water proof ply 12 mm thick
405.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
41OD23391/2022-2023:Name board of size 76*60cm installed in the appropriate place visible to the public made of brick wall with granite plaque should be inserted and engraving letters etc. complete as per the departmental officers at site.
42Appendix - D Construction of a Foot Bridge in Vengannor Elaa of Venganoor Grama Panchayath.
432.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
4415.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
45OD23321/2022-2023:Putting up ring bund by engaging man coolies during the course of construction and removing the bund after the completion of the work etc. completed as directed by the departmental officers at site
4660.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
472.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4860.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4960.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
504.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
515.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
525.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
535.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
54OD23392/2022-2023:Name board of size 76*60cm installed in the appropriate place visible to the public made of brick wall with granite plaque should be inserted and engraving letters etc. complete as per the departmental officers at site.

AI Tender Summary

OUR REF NO 37511959
AUTHORITY Government Departments
TENDER VALUE 49.95 Lakhs
LAST DATE 15-05-2023
Authority
Authority Name Irrigation Department
Work Description General-Anthiyoor Thodu And Puthuchal Kozhode Thodu-Construction Of Leading Chal Inanthiyoor Idamanakuzhy Thodu Andconstruction Of Side Protection Work In Puthuchal Kozhode Thoduof Balaramapuram Grama Panchayath Andconstruction Of Bridge Near Oottukuzhy Kulam And Construction Of Foot Bridge In Venganoor Ela Of Venganoor Grama Panchayath-General Civil Work
Basic Detail
Tender No 4/EEMI/2022-23
Bidding Type Tender
Location
City balaramapuram
State Kerala
Key Dates
Publish Date 03 May 2023
Submission Date 15 May 2023
Open Date 16 May 2023
Finance
Tender Value 49.95 Lakhs
Tender Fee 2760
EMD 50000
Exemption Not Available
Document List
f8692f3a-b017-4b78-bc33-2c957a8842dd.html
BOQ_848229.xls
Tendernotice_1.pdf
viewsbd.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 03, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
May 15, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 16, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

f8692f3a-b017-4b78-bc33-2c957a8842dd.html

xls

BOQ_848229.xls

pdf

Tendernotice_1.pdf

pdf

viewsbd.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders