}

Tender For Provision Of Smart Prepaid Meters In Narangi Mil Stnunder Ge Narangi, narangi-Assam

Military Engineer Services-MES has published Tender For Provision Of Smart Prepaid Meters In Narangi Mil Stnunder Ge Narangi. Submission Date for this Tender is 29-05-2023. Energy Meter Tenders in narangi Assam. Bidders can get complete Tender details and download the document.




Tender Notice

37507658
Corrigendum : Tender For Provision Of Smart Prepaid Meters In Narangi Mil Stnunder Ge Narangi
Open Tender
Indian
Assam
narangi
29-05-2023

Tender Details

Tender For Provision Of Smart Prepaid Meters In Narangi Mil Stnunder Ge Narangi

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 17-May-2023 Revised BOQ BOQ 29-05-2023

Key Value

Document Fees
INR 2000 /-
EMD
INR 309000.0 /-
Tender Value
INR 2.34 Crore /-

BOQ Items

Name of Work: PROVN OF SMART PREPAID METERS IN NARANGI MIL STNUNDER GE NARANGI
Sl. No. Item Description
1NOTE (Applicable for all items):- The bidders/contractorsare advised to read tender document & all corrigendum/ amendments and General conditions of contracts before entrying/quoting the rates. SCHEDULE "A" BOQ
2Taking down, disconnecting the power supply from existing energy meter by carefully opening connection from terminal and depositing into stores for safe custody. Also ensure to capture the final reading/reading remarks from the meters being removed from wall and providing the same to MES for settelment for all the meters.
3Supply , installation, testing and comission of Smart Meter (IS-16444), AC whole current,single phase, 2 wires Smart Energy Meter of rating 6/10-60 Amps, 240 Volts, 50 Hz class-I complete as specified in CEA notification including PVC transparent protective meter box of suitable size as recommended by OEM . The meter shall communicate with Head End System (HES) on any of the communication technologies mentioned in IS-16444 Part-I in a secure manner . The slection of communication technology should be as per the site conditions and as per design consideration of AMI Implementing agency to meet the performance. The smart meter can based on RF Mesh communication technology or Cellular communication technology.
4Supply , installation, testing and comission of Smart Meter (IS-16444), AC whole current, three phase, 4 wires Smart Energy Meter of rating 10-60 Amps , 415 Volts, 50 Hz class-I complete as specified in CEA notificationincluding PVC transparent protective meter box of suitable size as recommended by OEM. The meter shall communicate with Head End System (HES) on any of the communication technologies mentioned in IS-16444 Part-I in a secure manner . The slection of communication technology should be as per the site conditions and as per design consideration of AMI Implementing agency to meet the performance. The smart meter can based on RF Mesh communication technology or Cellular communication technology.
5For item No. 2&3 : The smart meters should have the following minimum basic features:- (a) Measurement of electrical energy parameters. (b) Bidirectional Communication. (c) Integrated Load limiting/ connect/ disconnect switch. (d) Tamper event detection, recording and reporting. (e) Power event alarms as per IS 16444 Part-I. (f) Remote firmware upgrade. (g) Pre paid features at MDM end (as per IS 15959 Part-2). (h) TOD features. (j) On demand reading. (k) The meter should support open communication protocol DLMS with software.
6For item No. 2&3 : Smart Meter on RF Mesh Communication Technology:-The Smart Meter (IS-16444), AC whole current, single phase, 2 wires & three phase, 4 wires, Smart Energy Meter of rating 10-60 Amps Single phase / 10-60 Amps three phase complete as specified in CEA notification. The meter shall communicate with Head End System (HES) on any of the communication technologies mentioned in IS-16444 Part-I in a secure manner. The smart meter shall be based on RF Mesh communication technology including Gateways and Repeaters.
7Notes for Item No. 2&3: Smart Meter based on Cellular Communication Technology:- The Smart Meter (IS-16444), AC whole current, single phase, 2 wires Smart Energy Meter of rating 10-60 Amps complete as specified in CEA notification. The meter shall communicate with Head end System (HES) on any of the communication technologies mentioned in IS-16444 Part-I in a secure manner. The Smart meter shall be based on Cellular communication technolgy. Notes : -(a) Only one type of meter shall be used . Mix- matching of smart meters based on RF or Cellular communication shall not be allowed during execution of work. (b) The meter shall carry18 months (minimum) warranty. During the warranty contractor shall replace defective meter without any extra cost to department. (c) Deployment of adequate skilled manpower and back end IT infra/cloud hosted applications for providing above services : (i)Skilled manpower to deliver the professional services for better consumer satisfaction. (ii)Procurement and deployement of hardware/ accessories like computers to enable the manpower in executing their duties, printers to print the bills/ tokens. (iii) UPS sufficient enough to back the unintrrupted services. (iv) Tools and tackles to deliver the services. (v) Any need of vehicles for mobility in delivering the services. (vi) Provide Training to MES (User). Note: (i) The contractor would be responsible from removing the existing meter, noting down the reading and depositing it with the MES. (ii) It would be possible to run the meter in both prepaid and postpaid mode. (iii)Smart Meter shall have a dedicated sealable slot for accommodating plug-in type bi-directional communication module which shall integrate respective communication technology (RF/Cellular) with smart meters with adaptablity tointerfaces (WAN/NAN).
8Supply and Installation of IP-67 protection Data Concentrator Units (Gateway) compatible for remote Advanced Metering Infrastructure (AMI) solution and capable of communicating with the smart energy Meter in the corresponding frequency band and with the data server through GPRS/Ethernet. It shall have internal memory to store data of at least 200 modules. It shall have inbuilt battery back-up. It would have IP-67 protection. It shall support auto discovery of the meters and self healing mechanism for the breaks in the RF network.Make: L&T, Schneider or equivalent
9Supply and installed single phase meter as repeaters (will be required wherever RF signal is low).
10Supply and Configuration of the Web based Software with following modules: (i) Meter Data Management Module The meter data management module shall be responsible for collecting the data from the concentrator and make the data available to the billing system.The meter data management system shall capture and provide the following data: (a) 30 min instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency (b) Monthly billing survey data for cum energy and max demand. (ii) Postpaid /Prepaid Billing Module: The billing module shall collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin and end users. The billing module shall include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It shall allow postpaid and prepaid functionality as required. (iii) Occupation and Vacation Module The system shall support occupation / vacation and billing reports. the software shall be collecting data from Gateway. The software shall provide access to staff as well as the occupant for the data. (iv) Customer Portal The system shall include a customer portal for the resident /occupant to log in and view their own energy / billing data. There shall be android and iOS mobile apps for the user to monitor its own data and balance on regular basis.
11(v) Energy Accounting Module The system shall include features of energy accounting. The system shall be able to account for total energy block wise, facility wise and shall also allow calculations of unaccounted energy in case total energy meter is also available. (vi)Customer Care Module - the software shall include a customer care module where the user shall be log in any complaints. The service provider shall monitor the complaints and carry out the necessary activities for the complaints resolution. (vii) Meter Installation Module - The software shall include an app based meter installation module where the meter installation or changes can be captured on the app itself and the readings may be demonstrated to the user if required on the app itself. (viii) Activities Communication - The software support communication of the various activities such as occupation, vacation, meter change. personal detail change etc. with the user as well as the department on email. (ix) The cost of Ist SIM and SIM Charges for entire period of contract shall deemed to be included with the above items. Note: The software shall contain two year defect liability including all operating expenses such as GPRS charges, hosting charges etc.
12One years Comprehensive AMC include the followings. The AMC will start from the date of completion of the Contract and shall continued for one year. The AMC would include supplied, GPRS/Internet (SIM) Charges, Software AMC, 24X7 Customers care support, reconfiguration of the meters of type based on RF communication technology. (a) Monthly sim charges for the DCU. The contractor shall ensure supply of appropriate SIMs to ensure necessary single availability. The contractor shall change the sim or sim provider as required. In case of network issues, the contractor shall liaison with the telecom service providers for necessary resolution. (b) Recurring SMS charges. The SMS would be issued for the payments alerts, low balance alerts and disconnection / connection alerts. (c) Software AMC. This shall include necessary upgradations in the software such as support to the chrome browser changes, android version changes , iOS version changes. These changes happen on frequent basis and the software shall support all the changes. (d) Remote server admin support - Ensuring adequate database back up, upgradations in the operating system, anti virus updates, database upgrade etc. (e) Software installation on any alternate / backup server if required. (f) The communication network monitoring and support. (g) Configuration of the repaired / replaced hardware in the system. (h) Trouble shooting and necessary actions to run the system as required. (j) Software bug fixing as and when required.
13M&L for Sub main wiring with 2 runs of 4.0 sqmm, single core, PVC insulated & unsheathed cable conforming to IS-694, 1100 volts with copper conductor multi stranded drawn in and including 20mm dia non metallic PVC grey conduit/flexiable conduit conforming to IS-9537 with all accessories such as Tees, Elbows, junction box, reducers etc as requied alongwith one run of 4 sqmm single core PVC insulated & unsheathed copper conductor as continuos earth wire dolly and connecting to existingdistribution board of each building and meter/ qtr as ordered and testing on completion including taking down old submain wiring for meter complete all as specified and directed.
14M&L for Sub main wiring with 2 runs of 6.0 sqmm, single core, PVC insulated & unsheathed cable conforming to IS-694, 1100 volts with copper conductor multi stranded drawn in and including 20mm dia non metallic PVC grey conduit/flexiable conduit conforming to IS-9537 with all accessories such as Tees, Elbows, junction box, reducers etc as requied alongwith one run of 6 sqmm single core PVC insulated & unsheathed copper conductor as continuos earth wire dolly and connecting to existingdistribution board of each building and meter/ qtr as ordered and testing on completion including taking down old submain wiring for meter complete all as specified and directed.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail