| 1 | Dismantling, fabrication and erection of M.S. Structure and Platform (M.S. Channel, Plate, Angle, Beam etc.) |
| 2 | i) Dismantling |
| 3 | ii) Fabrication |
| 4 | iii) Erection |
| 5 | Dismantling, fabrication & erection ofM.S., G.I. Pipe line ( 1\" to 12\") |
| 6 | i)Dismantling |
| 7 | ii) Fabrication |
| 8 | iii) Erection |
| 9 | Dismantling, fabrication & erection of pipe accessories (bend,reducer, flages, blind, nipple Tee, etc) (1’’ to 12’’) |
| 10 | i)Dismantling |
| 11 | ii) Fabrication |
| 12 | ii) Erection |
| 13 | Dismantling of valves/NRV |
| 14 | i) Upto 6” dia |
| 15 | ii) 7” dia to 12” dia |
| 16 | Erection of valves/NRV |
| 17 | i) Upto 6” dia |
| 18 | ii) 7” dia to 12” dia |
| 19 | Dismantling and erection of angle/Sluice/NRV valve 16” – 36” |
| 20 | i) Dismantling |
| 21 | ii) Erection |
| 22 | Dismantling, fabrication & erection ofhand railing |
| 23 | i)Dismantling |
| 24 | ii) Fabrication & Erection |
| 25 | Dismantling Fabrication & erection of S.S. pipe. |
| 26 | i) Dismantling |
| 27 | ii) Erection |
| 28 | iii)Erection |
| 29 | Dismantling Fabrication & erection of Seamless pipe. |
| 30 | Dismantling |
| 31 | Fabrication |
| 32 | Erection |
| 33 | Dismantling Fabrication & erection of seem less pipes Accessories (bend, reducer blind nipple,Tee, Flange) |
| 34 | i) Dismantling |
| 35 | ii) Fabrication |
| 36 | iii) Erection |
| 37 | Dismantling, fabrication & erection ofM.S. pipe (12” dia to28’’ dia) |
| 38 | i) Dismantling |
| 39 | ii) Fabrication |
| 40 | iii) Erection |
| 41 | Dismantling fabrication erection pipe accessories (Bend, Reducer, Tee, Nipple, Flange Blind) 12” |
| 42 | i) Dismantling |
| 43 | ii) Fabrication |
| 44 | iii) Erection |
| 45 | Dismantling fabrication erection of S.S. pipe accessories (Bend, Reducer, Tee, Nipple, Flange Blind) 1\"-12\"dia |
| 46 | i) Dismantling |
| 47 | ii) Fabrication |
| 48 | iii) Erection |
| 49 | Dismantling fabrication and erection ofvapour/Exhaust pipe |
| 50 | Dismantling/fabriction and erection ofvapour/Exhaust Pipe bend. |
| 51 | i) Dismantling |
| 52 | ii) Fabrication |
| 53 | iii) Erection |
| 54 | Dismentalling, fabrication & erection of M.S. coil |
| 55 | Dismentalling |
| 56 | Fabrication |
| 57 | Erection |
| 58 | Repair/replacement of worn out boiler ducting |
| 59 | Welding of pan shell from inside at the joint of shell and cone. |
| 60 | Dismantling, fabrication, repair & erection of Semikestner/vapour cell save all. |
| 61 | i) Dismantling |
| 62 | ii) Fabrication |
| 63 | ii) Erection |
| 64 | iii) Repair |
| 65 | Dismantling, fabrication, repair and erection of quad body save-all |
| 66 | i) Dismantling |
| 67 | ii) Fabrication |
| 68 | iii) Erection |
| 69 | iv) Repair |
| 70 | Dismentalling, fabrication and erection of panumbrella made from 6 mm thick plate. |
| 71 | Dismentalling, fabrication and erection of Evaporator body umbrella |
| 72 | Dismentalling of old tubes & fitting of new SS tube of juice heater with hydraulic testing (Retubing of body) |
| 73 | Dismentalling of old tubes & fitting of new SS tubes of Quad body with hydraulic testing (Retubing of body) |
| 74 | Welding of exchaust/vapour joints. |
| 75 | Dismantling fabrication and erection ofExpansion joint of FD Fan at Boiler |
| 76 | Dismantling, fabrication and erection of juice sulphiter So2 coils. |
| 77 | Dismentalling, fabrication and erection of So2 furnace primary cooler |
| 78 | Dismentalling, fabrication and erection of after burner. |
| 79 | Dismanttalling, refitting and expanding of air heater tubes and trial. |
| 80 | Dismantling fabrication and erection ofExpansion joint of ID Fan at Boiler |
| 81 | Currting & refitting shell of Quad/Pan save-all for checking/cleaning. |
| 82 | Dismantling/ fabrication and erection of juice sulphiter SO2 Box |
| 83 | Replacement of worn out perforated plates of Steam entry at quad bodies |
| 84 | Cutting ofportionof calenderia shell & its refitting for cleaning ofcalenderia of quad/juice heater. |
| 85 | Replacement of worn out SO2 furnace Cooler pipes with dismantling & erection of cover. |
| 86 | Dismantling & fabrication and erection of Expansion joint of Air Heater duct at Boiler |
| 87 | Dismantling fabrication and erection of top come of old Semi Kestner |
| 88 | S.S. lining of any equipiment |
| 89 | Dismantlig, Fabrication and erection of top cone of old vapour cell |
| 90 | Dismentalling of old gear & erection of new planetary gear of crystallizers. |
| 91 | Fabrication and erection of M.S. grating for plate forms made from M.S. square bar andM.S. flat 25x6 mm |
| 92 | Dismantlling, fabrication & erection of So2 furnance cooler shell |
| 93 | Erection of M.S. plates 3mm to side wall of boilers with proper strengthening with M.S. angles. |
| 94 | Fabrication of 6 \" M.S. cross from seamless pipe |
| 95 | i) Dismantalling |
| 96 | ii) Fabrication |
| 97 | iii) Erection |
| 98 | Dismantalling, fabrication & erection of condensate box of quad/pan |
| 99 | Replacement of worn out steam jacket of Quad body. |
| 100 | Replacement of weak portion ofpan bottom saucer. |
| 101 | Dismantalling , repair and erection of pan body save-all |
| 102 | i) Dismentalling |
| 103 | ii) Erection |
| 104 | iii) Repair |
| 105 | iv) Fabrication |
| 106 | Replacement of bottom of syrup receiving tank |
| 107 | Dismantalling, fabrication & erection ofsteam jacket of pan. |
| 108 | Strengthening/replacement/repair of syrup tank bottom at Pan floor |
| 109 | Dismantalling and replacement of overhead tank bottom |
| 110 | Dismantalling and replacement of sides plates about 1 meter height of over head tank. |
| 111 | Dismantling, Fabrication and erection of worn out body cell of old vapour cell |
| 112 | Dismantling, Fabrication and erection of mud mixture body |
| 113 | Fabrication of motor pump beds from M.S. channel/angles |
| 114 | Replacement of J pipe of Quad/Pan/Evp. Body |
| 115 | Dismantalling, fabrication & erection of Heavy & light tank vacuum filter |
| 116 | Dismantalling, fabrication & erection of Vacuum filter tray |
| 117 | Dismantling, fabrication & errection of Agitaror of vacuum filter |
| 118 | Dismantling and fitting of Gearbox with motor/pump with motor |
| 119 | i) Dismantling |
| 120 | ii) Fitting and alignment |
| 121 | Strengthning of mini cooling tower & facrication & erection of 02 no. M.S. Tank |
| 122 | Strengthning of both molasses storage tank |
| 123 | Replacement of FD fan damper |
| 124 | Dismantalling, fabrication & erection of internal/external amonia coils of quad/ vapour cell /juice heater and pan |
| 125 | Dismantalling, fabrication & erection of Steam Washing coils inside of pan |
| 126 | Dismantling, fabrication & erection of expansion joint of econimizer at boiler |
| 127 | Replacement of shaft & arms etc of Crystallizer |
| 128 | Dismantling, fabrication & erection of transit heater with hydraulic testing |
| 129 | Replacement of gutter any station |
| 130 | Replacement of top cone of syrup sulphiter with replacement of portion of its shell |
| 131 | Fixing of M.S. ring in the bottom of pans to strengthen the bottom with shell |
| 132 | Replacement of worn out body of magma mixture |
| 133 | Dismantling and refitting of juice coils of door clarifier (After cleaning) |
| 134 | Replacement of any damage/worn out scrapper/rubber of DORR |
| 135 | i) Replacement of scrapper with rubber |
| 136 | ii) Replacement of rubber of scrapper |
| 137 | Replacement of worn out structure, column etc. of sulphur station |
| 138 | Labour rate for fabrication and erection of shed at cane unloader including structure of roof. |
| 139 | Replacement of Damaged Rail line/ square bar bridge and trolley of cane unloader |
| 140 | Replacement of Damaged Rail line |
| 141 | Replacement of Damaged square bar |
| 142 | Dismantling fabrication erection of syrup/B heavy tanks approximate size (2 mtr x 5mtr x 3mtr.) |
| 143 | Patching work at any vassele/tanks etc. |
| 144 | Replacement of wornout arms of crystallizer |
| 145 | Dismantling fabrication repair and erection of Sugar melter as per existing size |
| 146 | Dismantling fabrication and erection of underground Filtrate juice tank at Oliver. (Underground tank will be of S.S. material) |
| 147 | Repairing and Strengthening of final molasses line Supprt column |
| 148 | Replacement of down take pipe inside of evaporator body |
| 149 | Repairing Strengthening and plastering (Civil work) of Boiling house equipment columns |
| 150 | Dismantling, fabrication and erection of hoper tray |
| 151 | i) Single tray hopper size 11.00 x 1.50 Mtr |
| 152 | ii) Multi tray hopper length= 11.00 mtrbreath= 1.50 mtrAir vent plate= 1.50 x 1.50 mtr----07 nos. |
| 153 | iii) Multi tray hopper with Rori arrangement Length = 10.00 mtrBreath= 2.00 mtrRori arrangement = 2.00 mtr x 2.00 mtrAir vent plate = 1.50 x1.50 mtr----07 nos |
| 154 | Replacement of worn out columns of vacuum filter |