Roof Top Rain Water Conservation Project Sand Filter, Rainwater Pipe, Well Cover Under Water Conservation Category At Muthammalpuram Village In Seevalapuram Karadiyudaippu Panchayat , Roof Top Rain Water Conservation Project ( Sand Filter, Rainwater Pipe, Well Cover ) Under Water Conservation Category At Muthammalpuram Village In Seevalapuram Karadiyudaippu Panchayat , Cutting Old Cement Concrete Pavement For Pipe Line Trench Work Including All Labour Charges Etc Complete. , Earthwork Excavation In All Clauses Of Soil Such As Gravel, Hard Gravelly Soil, Hard Stiff Clay, Stiff Black Cotton Soils Including All Labour Charges Etc Complete. , Cement Concrete 1:2:4 Mix Using 20Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor Bed Blocksfor10 Cum , Supply And Delivery Ofpvcpipe 6Ksc Including Cost And Conveyance And All Labour Charges Etc Complete. , Jointing Of Laying Of 110Mm Diapvcpipes Including Cost And Conveyance And All Labour Charges Etc, Complete. , Refilling The Excavated Trenches Including All Labour Charges Etc Complete. , Earth Work Excavation And Depositing On Bank With In Initial Lead Of 10 M And Initial Lift Of 2M In Hard Stiff Clay, Stiff Black Cotton Soil, Hard Red Earth, Earth Mixed With Small Sized Boulders And Hard Gravelly Soil As Per Ss 20B , Cement Concrete 1:4:8 Mix Using 40Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. , Brick Work In Cement Mortar 1:5 Mix Using Country Bricks 83 / 4X4 1 / 4X2 3 / 4 And Conveyance Of All Materials To Site And All Labour Charges Etc Complete For 100Cft , Plastering With Cement Mortar 1:5 Mixto12mmthick Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc Completefor10 Sqm. , Supplying & Fixingwith Cuddapah Slabs 20-30Mm Thick For Cup Board Thick And Pointed With Cement Mortar 1:3 -10 Sqm , Supplying And Fixing Of 100Mm Gi Gate Valve , Well Cover And Parapet Wall , Supplyingand Fixing Of L Angle & Flatm.S.Angle For Cover Work Including All Cost Etc. , I ) M.S.Angle For Islb, Isa Ii ) Supplyingand Fixing Of L Angle , Supply And Delivery Of Weld Mesh 7.5 X 2.5Cm 10 Gauge , Brick Work In Cement Mortar 1:5 Mix Using Country Bricks 83 / 4X4 1 / 4X2 3 / 4 And Conveyance Of All Materials To Site And All Labour Charges Etc Complete For 100Cft , Plastering With Cement Mortar 1:5 Mixto12mmthick Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc Completefor10 Sqm. , Sand Filter , Earth Work Excavation And Depositing On Bank With In Initial Lead Of 10 M And Initial Lift Of 2M In Hard Stiff Clay, Stiff Black Cotton Soil, Hard Red Earth, Earth Mixed With Small Sized Boulders And Hard Gravelly Soil As Per Ss 20B , Cement Concrete 1:4:8 Mix Using 40Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. , Brick Work In Cement Mortar 1:5 Mix Using Country Bricks 83 / 4X4 1 / 4X2 3 / 4 And Conveyance Of All Materials To Site And All Labour Charges Etc Complete. , Collection And Supply Of40mm Hbg Metaland Filling In To The Leach Pits Including Cost And Conveyanceto The Siteand All Labour Charges For Filling As Per Standard Specifications , Collection And Supply Of Sandand Filling In To The Basement Including Cost And Conveyanceto The Siteand All Labour Charges For Filling As Per Standard Specifications , Collection And Supply Of6mm Hbg Metaland Filling In To The Leach Pits Including Cost And Conveyanceto The Siteand All Labour Charges For Filling As Per Standard Specifications , Plastering With Cement Mortar 1:5 Mixto12mmthick Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc Complete. , Exterior Emulsion Painting Two Coats With Best Approved Quality And Colourpaint Over One Coat Of Base Coat Including Cost And Convyance Of All Materials To Work Site And Labour Charges Etc., Complete. , Supplying And Fixingp.V.C Rainwater Down Fall Pipe Of 110Mm Diawith Necessary Shoes, Bends, & Clamps Etc., , Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }