Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Tender For Round The Clock Maintenance Of Turbine And Its Aux. Of Unit No.- 1, 2 And 3 Of 3X210 Mw, Atps, Anpara. Submission Date for this Tender is 19-06-2023. Turbine Engines Tenders in anpara Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 13-May-2023 | Corrigendum Regarding Tender Fee | Fee | 19-06-2023 |
Sl. No. | Item Description |
1 | Round the clock up-keeping and maintenance of Turbine and its auxiliaries as per scope of work of Tender specification. (One Job means round the clock i.e. in all three shifts per day for one month) |
2 | 1- For Anpara 210MW Unit-1 |
3 | 2- For Anpara 210MW Unit-2 |
4 | 3- For Anpara 210MW Unit-3 |
5 | Overhauling of Centrifuging machine MAB103/206 as per scope of work. |
6 | Oil Flushing of H.P. Bypass oil system as per scope of work. |
7 | Transportation of lubricant/spares/consumables |
8 | Transportation of lubricant from Central Store to Site store. |
9 | Transportation of Empty Drums from site store to Central Store. |
10 | Running and up-keeping of 2 nos. portable centrifuging machine as per scope of work. |
11 | Replacement of the damaged L.P. diaphragms. |
12 | Cleaning of suction strainer of CEP |
13 | Cleaning of strainers of Raw Water Booster pumps |
14 | Round the clock up-keeping and maintenance of Boiler Feed Pumps and Condensate pumps as per Scope of work of tender Specification. .(One Job means round the clock i.e. in all three shifts per day for one month) |
15 | For Anpara 210MW Unit-1 |
16 | For Anpara 210MW Unit-2 |
17 | For Anpara 210MW Unit-3 |
18 | Replacement of Old Turbine Oil cooler tube Nest Assembly with new one and installation and commissioning the same in unit#1/2/3 of 3x210 MW, ‘A’TPS, Anpara |
19 | Cleaning of Main oil tank room and spreading fresh sand (As per attached annexures) |
20 | Cleaning of Main Oil tank |
21 | Overhauling of gland seal vapour exhauster /Oil extraction fan |
22 | Replacement of damaged N2 gas bladder from Accumulator of HP Bypass system |
23 | Inspection / Replacement of HP Bypass Axial Piston Pump |
24 | Replacement of compensator of hotwell/ condensate Extraction pump |
25 | Cleaning of C.W. Duct inside the T.G. hall |
26 | Checking of through ness of drainpipe of Main Steam and hot reheat strainer |
27 | Repairing work of grating/chequred plate |
28 | Attending tube leakage of H. P. Heaters 5/6 of 3x210MW and commissioning of Heaters from water and steam side. |
29 | Attending water leakage from water box cover of H. P. Heaters 5/6. |
30 | Servicing of Pneumatically operated recirculation valves of BFP Nb 100mm |
31 | Servicing of solenoid operated drain valves DW-109 / DW-110 |
32 | Servicing of motorized extraction valve ES-I / ES-4 Nb 200mm |
33 | Servicing of motorized Feed water discharge valves of BFP BF -7/8/9 of Nb200mm. |
34 | Servicing of H.P. motorized drain valve 25 to 50mm |
35 | Servicing of HP Manual valves & NRVs |
36 | Servicing of pneumatically operated drip line valve of LP heater, MC-23/19 ,DM-15 /16 |
37 | Servicing of LP Hand operated/motorized valves at different elevations 25mm to 150mm. |
38 | Servicing of L.P. Hand operated/motorized valve/NRVs Nb 200mm to 500mm |
39 | Replacement of LP Valves (flange type) 100 to 500mm |
40 | Servicing of self-actuating feed water group protection valves FW-55/56 of H.P. Heaters of Nb-250mm and Np-250 Kg/cm². |
41 | Servicing of feed water motorized isolating valves of HP Heaters Nb 300mm. |
42 | Servicing & overhauling of Actuators K-150, F16A |
43 | Servicing of actuators type K-600, F14E |
44 | Servicing of pneumatic actuators |
45 | Servicing/Overhauling of Main Ejectors |
46 | Overhauling & Rectification of tube leakage from Turbine oil Coolers. |
47 | Overhauling/servicing of L. P. Heaters. |
48 | Servicing of drip control valves of H. P. Heater HD-20, HD-23, HD-14 |
49 | Changing gaskets of flanges in feed line heaters, ejectors, Drain coolers etc. |
50 | Servicing of Actuators Limitorque/Siemens/ Acuma make |
51 | Replacement of HP valves steam line, oil line (motorized /hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 15mm up to Nb 50mm |
52 | Replacement of HP valves steam line, oil line (motorized/hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 50mm up to Nb 65mm |
53 | Replacement of HP valves steam line, drain line (motorized/hand operated) at different floors from (-) 4 meter to 11 meter level size more than Nb 65mm up to Nb 150mm |
54 | Replacement of gland packing of HP valves from Nb 50mm to Nb 500mm. |
55 | Replacement of gland packing of HP Bypass valve (BP-1 / BP-2). |
56 | Servicing of actuators of turbine gland seal steam /leak off controller along with valve. |
57 | Servicing of Electro hydraulically operated HP By pass valve (BP-1 / BP-2) |
58 | Attending leakages of pipeline & headers etc.of Turbine And It’s Auxiliaries by cutting grinding and H.P. welding of damaged portion putting new spools/bends if required. |
59 | Repair/Replacement of HP/LP Pipelines/drainlines by cutiing and re-welding on per mm basis |
60 | Complete spray insulation and repair of spray insulation on following equipments including supply of self setting cement compound, spray wool alkali silicate binder retainers, M. S. Plate, aluminum shields, S.S. and G.I. wire nettings, removal of old and damaged insulation re-fixing of end shields plastering and finishing as per BHEL norms and specifications.1. H. P. casing 324 to 360 mm insulation thickness.2. Interceptor valves and I.P. control Valves 270mm thickness insulation. All the above equipments including their end shield on front and rear sides and other areas as per site requirements. |
61 | Supply and application of thermal insulation on critical steam pipes such as main steam hot reheat, cold reheat, cross around and feed cycles pipes etc. including fixing and fitting of protective covering insulation thickness 50mm silicate and 100mm mineral wool or by 180mm thickness of lightly resin bonded mineral/ rock wool and sheetings. |
62 | Inspection of Repaired TG Bearings No. 1 to 6: Dimension measurement and DP test |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail