National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Tender For Consultancy Services As Ae For Supervision Of Construction Of Four Lane With Paved Shoulder Agartala Bypass Connecting Nh-8 To Nh-108B In The State Of Tripura. Submission Date for this Tender is 08-06-2023. Road Work Tenders in tripura Tripura. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 29-May-2023 | Corrigendum No. 1 | Date | 08-06-2023 |
2 | 06-Jun-2023 | Corrigendum No. 2 | Other | 08-06-2023 |
Sl. No. | Item Description |
1 | Remuneration for Local Staff (inclusive of per Diem allowance) |
2 | Team Leader Cum Senior Highway Engineer (1 No) 1*36=36 |
3 | Resident cum Highway Engineer (1 No) 1*36+1*60=96 |
4 | Bridge /Structural Engineer (1 No) 1*36=36 |
5 | Senior Quality cum Material Expert (1 No) 1*36=36 |
6 | Sub-Professional Staff |
7 | Survey Engineer (1 No) 1*6=6 |
8 | Assistant Highway Engineer (2*36+1*60=132) |
9 | Assistance Bridge Engineer (1Nos) 1*36=36 |
10 | Assistant Quality cum Material Engineer (2*36+1*60)=132 |
11 | Electrical Engineer (1 No) (1*8)=8 |
12 | Quantity Surveyor (1 No) (1*36+ 1*15)=51 |
13 | Support Staff (inclusive of per diem allowance) |
14 | Office Manager (1 No) 1*36+1*60=96 |
15 | Accountant cum Cashier (1 No) 1*36+1*60=96 |
16 | Steno cum Computer Operator 1*36+1*60=96 |
17 | Office Boy (1*36)+(1*60) = 96 |
18 | Transportation (Fixed Costs) |
19 | Bolero or equivalent 4X4 vehicles (not more than 3 years old) (2 nos during Construction Period), 2*36 Rate per month |
20 | Bolero or equivalent 4X4 vehicles (not more than 3 years old) (1 nos during Maintenance period/DLP), 1*60=60 Rate per month |
21 | Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer"s Site Offices/Regional Office. The quoted amount against remuneration should include travel fare(including Hotel Charges,travel costs etc. complete |
22 | Forround trip to Employer"s Head Office |
23 | Forround trip to Employer"s regional office. |
24 | Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. |
25 | Main office of minimum 200 Sqm area for During Construction period (1 Nos) 1*36=36 |
26 | During Maintenance /DLP period (1 No) 1*60=60 ( min 100 sqm area) |
27 | Office Supplies, Utilities and Communication (Fixed Costs) |
28 | Office Supplies during construction period for 1 office 1*36=36 |
29 | Office Supplies during Maintenance /DLP periodfor 1 office 1*60=60 |
30 | Drafting Supplies during construction period for 1 office 1*36=36 |
31 | Drafting Supplies during Maintenance /DLP periodfor 1 office 1*60=60 |
32 | Computer Running Costs during construction period foroffice 1*36=36 |
33 | Computer Running Costs during Maintenance /DLP periodfor 1 office 1*60=60 |
34 | Domestic and International Communication during construction period for 1 office 1*36=36 |
35 | Domestic and International Communication during Maintenance /DLP periodfor 1 office 1*60=60 |
36 | Office Furniture and Equipment (Rental) Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc., |
37 | During Construction period for 1 no of office 1*36=36 |
38 | During Maintenance /DLP periodfor 1 no of office 1*60=60 |
39 | Reports and Document Printing ( rate as per copy) |
40 | Monthly reports (Design and Construction) 96months * 3 Copies) = 288 Copies |
41 | Half yearly Reports (16 * 3 ) = 48 Copies |
42 | Various others reports as provided in the Concession Agreement such as Completion Report |
43 | Road Survey Equipment |
44 | Surface defects detection and roughness measurement using Network Survey Vehicle |
45 | Pavement strength measurement using FWD |
46 | Bridge inspection using Mobile Bridge Inspection Unit |
47 | Road signs inspection using Retro Reflectometer |
48 | Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail