Tender For Armo Of Eandm Installations At Bm Airport Ranchi. Sh Providing Maintenance Services For Eandm Installations Of Nitb, Sub-Station, Aai Residential Colony, Old Tb, Cisf Barrack, Mt Pool Andcargo Division For The Year 2023-25.
Tender Overview
Project Description
Armo Of Eandm Installations At Bm Airport Ranchi. Sh Providing Maintenance Services For Eandm Installations Of Nitb, Sub-Station, Aai Residential Colony, Old Tb, Cisf Barrack, Mt Pool Andcargo Division For The Year 2023-25.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 08-May-2023 | Corrigendum- I | Technical Bid | 22-May-2023 |
| 2 | 16-May-2023 | Proforma For Bid Security Declaration | Other | 22-May-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Sub Head - I : Operation and MaintenanceOperation and Periodical Maintenance of 33 KV/433V sub station, 5x750 KVA DG sets,Internal and External Electrical Installations ofIntegrated Terminal Building, New Sub Station, AAI Residential Colony, Amenities in Car Parking & near ITB, Car Parking & ITB Road St. Lighting,Internal and External Electrical Installations of old terminal building , MT pool , CISF barrack ,cargo division, Approach Road & oldand new Car Parking Lights etc. by deploying adequate manpower as per the conditions of contract involving operation, repairs & maintenance / faults / breakdowns and taking rectification action, ensuring serviceability / satisfactory working condition of the systems, preventive maintenance on daily/ weekly/ monthly/ quarterly/ yearly basis, maintenance of records/documentation etc. as per scope of work given in special conditions and technical specifications of contract on all day including Sundays & Holidays. |
| 2 | I st year |
| 3 | II nd year |
| 4 | Sub Head - I : Operation and MaintenanceCoordination for renewal of CEA Licence at New terminal Building and runway power house by providing assistance in submission of drawings, reports, documents etc. including getting site inspection by CEA authoritiesto obtain approval of licence and submission to AAI. Statutory govt. fees shall be paid by AAI derectly to CEA. Any associated works if necessary as per CEA observation during inspection shall be carried out by AAI through the AMC as required. |
| 5 | Sub Head - II : Repair and Painting WorksTransportation of diesel from AAI authorisedpetrol pump to power house( to and fro 08 KM) in 200 Ltr. barrels/ drums including loading/ unloading (for 600- 800 Ltr.) per trip as and when required. |
| 6 | Sub Head - II : Repair and Painting WorksAnnual maintenance contract ofRockwell automation make (model : Allen Bradley) Micrologix 1400 PLC for automatic operation of 5 nos. of D.G. sets (AMF panel with synchronization).including control circuit from DG Sets to AMF panels, AMF panels, and other LT panels in Sub-Station. |
| 7 | I st year |
| 8 | II nd year |
| 9 | Sub Head - II : Repair and Painting Works AMC ofhydraulic crash rated bollardsand tyre killer |
| 10 | I st year |
| 11 | II nd year |
| 12 | Sub Head - II : Repair and Painting WorksAMC of 250 KWp terrace mounted Solar panels along with inverter and other accessories as complete(Faulty spares will be provided by AAI). |
| 13 | I st year |
| 14 | II nd year |
| 15 | Sub Head - II : Repair and Painting WorksDecorating City side of Airport with minimum 50 nos PAR Lights , 300 nos Led Rice lights , 20 nos flood lights giving tri colour effects or as per theme dicided by E-I-C during national holidays or festivals. |
| 16 | I st year |
| 17 | II nd year |
| 18 | Sub Head - II : Repair and Painting WorksServicing, maintenance and testing of L & T make Air Circuit Breaker - 1250/1000/800/630A FP, EDO complete as required. |
| 19 | I st year |
| 20 | II nd year |
| 21 | Sub Head - II : Repair and Painting WorksServicing, maintenance and testing of L & T make Air Circuit Breaker - 2500 A, FP, EDO complete as required. |
| 22 | I st year |
| 23 | II nd year |
| 24 | Sub Head - II : Repair and Painting WorksServicing, maintenance and calibration of earth fault and over load relay with secondary injection kit etc. of 05 nos. HT panel complete as required. |
| 25 | I st year |
| 26 | II nd year |
| 27 | Sub Head - II : Repair and Painting WorksServicing, maintenance and testing of 33 kV HT - Vaccum Circuit Breaker of Siemens make etc. complete as required. |
| 28 | I st year |
| 29 | II nd year |
| 30 | Sub Head - II : Repair and Painting WorksTesting of BDV value of transformer oil at site as per direction of EIC |
| 31 | Sub Head - II : Repair and Painting WorksDehydration and filtration of transformer oil at site including testing for BDV before and after dehydration and filtration and submission of test reports etc. as required forpower Transformers |
| 32 | I st year |
| 33 | II nd year |
| 34 | Sub Head - II : Repair and Painting WorksRewinding the following with copper winding wires of required size and heat varnishing etc. as required including less for dismantled copper wire etc. as and when required. |
| 35 | Ceiling fans upto 1400 mm |
| 36 | Exhaust fans upto 450 mm |
| 37 | Wall Fans |
| 38 | Replacement of ball bearing for above fans. |
| 39 | Sub Head - II : Repair and Painting WorksShortening height of Perimeter Light Poles at various location complete in all respect and as per instruction of EIC |
| 40 | Sub Head - II : Repair and Painting WorksProviding and fixing vinyl sticker on the existing information signage board inside NITB of required design and letters. The letters in Hindi and English will be electro cut computerised automated to be transferred on existing polycarbonate sheet after removing the existing vinylsticker complete as directed by engineer-in -charge as and when required. |
| 41 | Sub Head - II : Repair and Painting WorksPainting of Fire fighting equipments i.e. Pumps, Hose cabinets, Pipes etc. with two coats of red synthetic enemel paint as approved by engineer-in-charge after scrubbing and cleaning the old paint from the existingsurface. |
| 42 | Sub Head - II : Repair and Painting WorksPaintingof Street light Poles of height more than 7 mand upto 9 m with one coat of primer and two coats of approved alumminium paint after scrubbing and cleaning the old paint complete from the existng surface. |
| 43 | Sub Head - II : Repair and Painting WorksPaintingof checkered plate/ Earth pit cover with two coat of black enamel paint after scrubbing and cleaning the old paint complete from the existng surface. |
| 44 | Sub Head - II : Repair and Painting WorksLettering of maximum 2\" size (Alpha/ Numerical) on the existing surface of feeder pillar / panel/ earth pits with synthetic enamel paint of approved colour as approved by engineer-in-charge etc. as required. |
| 45 | Sub Head - II : Repair and Painting WorksLifting and lowering of Underground Submersible Pump Motor set upto 5 HP installed at various locations at airport colony. |
| 46 | Sub Head - III : Supply of Material (As and when required )Supply of Spring charging motor with gearbox suitable for L&T make U-Power FP ACB of rating 800A/1000A/1250A/2500A. |
| 47 | Sub Head - III : Supply of Material (As and when required )Supply of box type heavy duty capacitor of following rating suitable to work on 3 phase, 440 V, 50 Hz AC supply. |
| 48 | 5 kVAR |
| 49 | 10 kVAR |
| 50 | 25 kVAR |
| 51 | 50 kVAR |
| 52 | Sub Head - III : Supply of Material (As and when required )Supply of Shunt release coil for L&T makeU-Power FP ACB of raring 1250/ 2500 A. |
| 53 | Sub Head - III : Supply of Material (As and when required )Supply of heavy duty SMF battery of following rating :- |
| 54 | 12V, 100 AH. Exide XP or equivalent |
| 55 | 12V, 180 AH. Exide XP or equivalent |
| 56 | Sub Head - III : Supply of Material (As and when required )Supply of Single Core FR-LSH PVC Insulated Industrial Grade Copper Conductor (Unsheathed) Flexible Cables, 1100 Volts Conforming to IS: 694. |
| 57 | 1.5 sqmm. |
| 58 | 2.5 sqmm. |
| 59 | 4.0 sqmm. |
| 60 | Sub Head - III : Supply of Material (As and when required )Supply of Safety shutter for 4P U-power ACBs of 2500A rating. |
| 61 | Sub Head - III : Supply of Material (As and when required )Supply of medium intensity obstruction light as per latest ICAO specification |
| 62 | Sub Head - III : Supply of Material (As and when required )Supply of transformer oil.as per latest government specifications for power transformer. |
| 63 | Sub Head - III : Supply of Material (As and when required )Supply of syubmersible pump of 3 hp make KSB model UMAI or equivalent |
| 64 | Sub Head - III : Supply of Material (As and when required )Supply of submersible pump of 5 HP make KSB model UMAI or equivalent |
| 65 | Sub Head - III : Supply of Material (As and when required )Supply of table solar fan minimum 16 w, upto 1300 rpm, fan diameter minimum 35.00 cm at all Security booths situated along the perimeter road |
| 66 | Sub Head - III : Supply of Material (As and when required )Supply of wall mounted 300 mm sweep fan suitable to work on single phase, 230V, 50 Hz AC supply. |
| 67 | Sub Head - III : Supply of Material (As and when required )Supply of heavy duty exhaust fan of following size having 1400 RPM suitable to work on single phase, 230V, 50 Hz AC supply :- |
| 68 | (a) 300 mm |
| 69 | (b) 450 mm |
| 70 | Sub Head - III : Supply of Material (As and when required )Supply of 400 mm sweep pedestrail fan suitable to work on single phase, 230V, 50 Hz AC supply. |
| 71 | Sub Head - III : Supply of Material (As and when required )Procurement of Street Lights of 70W. |
| 72 | (i) Strip |
| 73 | (ii) Driver |
| 74 | Sub Head - III : Supply of Material (As and when required )Supply ofLegrand Myrius 673044 6A 5 Pin White Universal Sockets with safety Shuter |
| 75 | Sub Head - III : Supply of Material (As and when required )Supply of 6A/16A, Uni Socket. |
| 76 | Sub Head - III : Supply of Material (As and when required )Supply of 6A/13A Combine Socket (For All Kind Of Pins). |
| 77 | Sub Head - III : Supply of Material (As and when required )Supply ofwhite 1MModular Combined Plate. |
| 78 | Sub Head - III : Supply of Material (As and when required )Supply ofwhite 2M Modular Combined Plate. |
| 79 | Sub Head - III : Supply of Material (As and when required )Supply ofwhite 3M Modular Combined Plate. |
| 80 | Sub Head - III : Supply of Material (As and when required )Supply of6A, Bell Push Switch. |
| 81 | Sub Head - III : Supply of Material (As and when required )Supply of 20 W,tube fittings suitable to operate on single phase, 230V, 50 Hz AC supply. |
| 82 | Sub Head -IV DSR WorksPercentage above or below on the rates of DSR\"2018 (CPWD)-Electrical items worth totaling to Rs.5,00,000.00 as per requirement.(Note: The firm has to quote/upload the Percentage above/ below (+/- %) on the quantity mentioned against thisitem directly in the form of multiplying factor in the rate coloumn as clarified below:For Example: If desired to quote 5% above on SR-2018 rates, the rate column shall be filled as 1.05. If desired to quote 3% below on SR-2018 rates, the rate column shall be filled as 0.97.) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender