|
| 1 | Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for 150mm thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers MOST 406 |
| 2 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications |
| 3 | Providing and laying Tack Coat overWMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 |
| 4 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm,0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20 Kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 |
| 5 | Providing and Laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm,0.17cum of 9.50-2.36cum of 2.36 and below with 45.27 kgs of VG30 bitumin for premixing per 10sqm and 5.03kg shredded plastic waste over the aggregate heated to 170 degree celcious in the centeral hot mix plant,mixed well with 45.27 kgs of hot bitumin (160 degree celcious ) 60/70 grade for premixing per 10sqm,to lay 30mm compacted thick of bituminous concrete including the cost of materials (the cost of municipal plastic waste obtained by the contractor from the municipality will be recovered) and conveyance of all materials to site,cost of heating the aggregate and mixing the shredded plastic with the hot aggregate and heating the bitumin to required teperature and mixing them in required temperature in central hot mix plant 20-30 tonne capacity,conveyance the mix to tipper trucks to paver site,spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consoldiated by 8-10 tonne vibratory/pnenumatic roller to the required denist etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 CMP with bitumien boiler,tippe truck,paver finisher, vibratory/pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. |
| 6 | Advance Patch work 13.20mmProviding Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labourcharges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications |
| 7 | Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications |
| 8 | GST |