Tender For Stage Contract For Annual Maintenance Of Dehgam Khul, Gadder Khul, Old Reshi Khul, New Reshi Khul, Kulwan Khul And Bagh Khul Of Irrigation Sub Division Bandipore
Tender Value
6 Lakhs
Estimated cost
Bid Submission
06 May 2023
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
bandipore → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Stage Contract For Annual Maintenance Of Dehgam Khul, Gadder Khul, Old Reshi Khul, New Reshi Khul, Kulwan Khul And Bagh Khul Of Irrigation Sub Division Bandipore
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1mtr from cutting edge |
| 2 | 25 mtr beyond 1 m from cutting edge |
| 3 | 50 mtr beyond 1 m from cutting edge |
| 4 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. |
| 5 | Earth work in bulk excavation by mechanical eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. |
| 6 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil. |
| 7 | Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated Earth in layers not exceeding 20 cm in depth. |
| 8 | Deduct for not watering the excavated earth for banking. |
| 9 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil. |
| 10 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil. |
| 11 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m. |
| 12 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 13 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 14 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). |
| 15 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level; 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 16 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level; 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 17 | Filling / Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 18 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter .2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charg |
| 19 | Dumping stone excluding cost of stones. In Horizontal on level |
| 20 | Supply of boulders excluding carriage and head load. |
| 21 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
| 22 | Labour charges for Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags (1 cft) |
| 23 | Labour charges for Filling Mega bags with sand/ earth; including cost of sewing and strings; excluding cost of bags(26 cft) |
| 24 | Labour charges for FillingGeo bags with sand/ earth; including cost of sewing and strings; excluding cost of bags(2.83) |
| 25 | Sand to be filled in EC/Mega/Geo bags including excavation and all kinds of carriages etc complete job |
| 26 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. |
| 27 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 28 | Suspended floors, roofs, landings, balconies and access platforms. |
| 29 | Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 30 | Slip clearance; In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. |
| 31 | Slip Clearence In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. |
| 32 | Dry stone pitching (any thickness) excluding cost of stones.On Horizontal |
| 33 | Dry stone pitching (any thickness) excluding cost of stones.On Slopes |
| 34 | Opening out old wire crates those and re-binding after filling. |
| 35 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively): Dry |
| 36 | Wet |
| 37 | Loading/Unloading sand/ earth filled EC bags in lorries; lead upto 50m. |
| 38 | Placing in dry |
| 39 | Placing in Water |
| 40 | Loading/Unloading sand/ earth filled Mega bags (26 cft) in lorries; lead upto 50m. |
| 41 | Placing in dry |
| 42 | Placing in Water |
| 43 | Loading/Unloading sand/ earth filled Geo bags (2.83 cft) in lorries; lead upto 50m. |
| 44 | Placing in dry |
| 45 | Placing in Water |
| 46 | Supply and Stacking of good earth at site excluding carraige |
| 47 | Shingle clearance from canals. |
| 48 | 12mm cement plaster of mix 1:4 (1 cement : 4 fine sand) |
| 49 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) |
| 50 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. |
| 51 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded. |
| 52 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry |
| 53 | Nallah |
| 54 | Dry random rubble masonry with hard stone in foundation and plinth:Quarry |
| 55 | Nallah |
| 56 | Open timbering over areas including strutting, shoring etc. complete (Measurements to be taken of the face area timbered):Depth not exceeding 1.5 m. |
| 57 | Depth exceeding 1.5 m but not exceeding 3 m |
| 58 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 59 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. |
| 60 | Engagement of labour / Beldar, Mazdoor |
| 61 | Fitter |
| 62 | Blacksmith IInd Class |
| 63 | Mason |
| 64 | Carpenter |
| 65 | Painter |
| 66 | Hire charges of J.C.B including fuel, driver and Crawling charges etc complete job (Idle charge) |
| 67 | Hire charges of J.C.B including fuel, driver and Crawling charges etc complete job (Running charges) |
| 68 | Hire charges ofChain MountedEarth moving equipment LNT etc including fuel ,driver and Crawling charges etc complete job |
| 69 | Hire charges of Tippers including fuel, driver etc Running charges |
| 70 | Hire charges of Tippers including fuel, driver etc Idle charges |
| 71 | Hire charges of Tractors including fuel, driveretc complete job Running charges |
| 72 | Hire charges of Tractors including fuel, driveretc complete job Idle charges |
| 73 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 30cm girth upto and including 60cm girth. |
| 74 | Beyond 60cm girth upto and including 120cm girth |
| 75 | Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position, incld. all carriages complete(Poplar Wood) |
| 76 | Providing and Laying PVC Polythene of special quality |
| 77 | Providing and Laying PVC Pipe Of approved brand and quality250 mm |
| 78 | 200 mm |
| 79 | 150 mm |
| 80 | 100 mm |
| 81 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete: 900mm |
| 82 | 600mm |
| 83 | 450mm |
| 84 | 300mm |
| 85 | 250mm |
| 86 | Providing and laying in position Precoated galvanised iron profile sheet 0.50 mm TCT, as per the directions of engineer in-charge. |
| 87 | Supply of A4 Paper 75 GSM for sub divisional use |
| 88 | Carraige of materials by Mechanical transport:Earth upto 1 km |
| 89 | 2 km |
| 90 | 3 Km |
| 91 | 4 km |
| 92 | 5 km |
| 93 | Beyond 5 Km upto 10 km /km |
| 94 | Beyond 10 Km upto 20 km /km |
| 95 | Beyond 20 km /everyadditional Km |
| 96 | Crates upto 1 km |
| 97 | 2 km |
| 98 | 3 Km |
| 99 | 4 km |
| 100 | 5 km |
| 101 | Beyond 5 Km upto 10 km /km |
| 102 | Beyond 10 Km upto 20 km /km |
| 103 | Beyond 20 km /everyadditional Km |
| 104 | Stone /Boulder upto 1 km |
| 105 | 2 km |
| 106 | 3 Km |
| 107 | 4 km |
| 108 | 5 km |
| 109 | Beyond 5 Km upto 10 km /km |
| 110 | Beyond 10 Km upto 20 km /km |
| 111 | Beyond 20 km /everyadditional Km |
| 112 | EC Bags upto 1 kms |
| 113 | 2 km |
| 114 | 3 Km |
| 115 | 4 km |
| 116 | 5 km |
| 117 | Beyond 5 Km upto 10 km /km |
| 118 | Beyond 10 Km upto 20 km /km |
| 119 | Beyond 20 km /everyadditional Km |
| 120 | 40 mm Agregrate 1 Km |
| 121 | 2 km |
| 122 | 3 Km |
| 123 | 4 km |
| 124 | 5 km |
| 125 | Beyond 5 Km upto 10 km /km |
| 126 | Beyond 10 Km upto 20 km /km |
| 127 | Beyond 20 km /everyadditional Km |
| 128 | 20 mm Agregrate 1 Km |
| 129 | 2 km |
| 130 | 3 Km |
| 131 | 4 km |
| 132 | 5 km |
| 133 | Beyond 5 Km upto 10 km /km |
| 134 | Beyond 10 Km upto 20 km /km |
| 135 | Beyond 20 km /everyadditional Km |
| 136 | Sand 1 km |
| 137 | 2 km |
| 138 | 3 Km |
| 139 | 4 km |
| 140 | 5 km |
| 141 | Beyond 5 Km upto 10 km /km |
| 142 | Beyond 10 Km upto 20 km /km |
| 143 | Beyond 20 km /everyadditional Km |
| 144 | Timber 1 km |
| 145 | 2 km |
| 146 | 3 Km |
| 147 | 4 km |
| 148 | 5 km |
| 149 | Beyond 5 Km upto 10 km /km |
| 150 | Beyond 10 Km upto 20 km /km |
| 151 | Beyond 20 km /everyadditional Km |
| 152 | RCC Spun pipes /DI Pipes600mm (1 km) |
| 153 | 2 km |
| 154 | 3 Km |
| 155 | 4 km |
| 156 | 5 km |
| 157 | Beyond 5 Km upto 10 km /km |
| 158 | Beyond 10 Km upto 20 km /km |
| 159 | 450mm (1 km) |
| 160 | 2 km |
| 161 | 3 Km |
| 162 | 4 km |
| 163 | 5 km |
| 164 | Beyond 5 Km upto 10 km /km |
| 165 | Beyond 10 Km upto 20 km /km |
| 166 | (300 mm)1 km |
| 167 | 2 km |
| 168 | 3 km |
| 169 | 4 km |
| 170 | 5 km |
| 171 | Beyond 5 km upto10 km per km |
| 172 | Beyond 10km upto20 km per km |
| 173 | (250mm)1 km |
| 174 | 2 km |
| 175 | 3 km |
| 176 | 4 km |
| 177 | 5 km |
| 178 | Beyond 5 km upto10 km per km |
| 179 | Beyond 10km upto20 km per km |
| 180 | D.I pipes (200 mm)1 km |
| 181 | 2 km |
| 182 | 3 km |
| 183 | 4 km |
| 184 | 5 km |
| 185 | Beyond 5 km upto10 km per km |
| 186 | Beyond 10km upto20 km per km |
| 187 | (150mm) 1 km |
| 188 | 2 km |
| 189 | 3 km |
| 190 | 4 km |
| 191 | 5 km |
| 192 | Beyond 5 km upto10 km per km |
| 193 | Beyond 10km upto20 km per km |
| 194 | Carraige of materials fromroad siteto site of work by manual labour including loading , unloading and stacking(Earth for First 50mtrs) |
| 195 | for every additional 50 mtrs |
| 196 | Crates for first 50 mtrs |
| 197 | for every additional 50 mtrs |
| 198 | Boulders for first 50 mtrs |
| 199 | for every additional 50 mtrs |
| 200 | Bages for first 50 mtrs |
| 201 | for every additional 50 mtrs |
| 202 | RCC Spun pipes First 50 mtrs (600mm) |
| 203 | 450mm |
| 204 | 300mm |
| 205 | 250mm |
| 206 | Additional (50 metres)600mm |
| 207 | 450mm |
| 208 | 300mm |
| 209 | 250mm |
| 210 | D.I pipes (First 50 metres) 200 mm |
| 211 | 150mm |
| 212 | Additional (50 metres) 200 mm |
| 213 | 150 mm |
| 214 | Stone For First 50 Mtrs |
| 215 | for every additional 50 mtrs |
| 216 | 40 mm For First 50 Mtrs |
| 217 | for every additional 50 mtrs |
| 218 | 20 mm For First 50 Mtrs |
| 219 | for every additional 50 mtrs |
| 220 | Sand For First 50 Mtrs |
| 221 | for every additional 50 mtrs |
| 222 | Timber For First 50 Mtrs |
| 223 | for every additional 50 mtrs |
| 224 | Hire charges for taxi/ cab including driver / fuel |
| 225 | Providing and fixing of wood work (popular wood) incld. All carriage complete for temperiory flumes at spots till the steel flumes (already advertised/allotted) shall be fixed / launched |
| 226 | Repairs to hydraulic gates by way of greasing, repalacement of rubber seals, which winch machines etc complete job |
AI Tender Summary
Tender Timeline
Apr 29, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedMay 06, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMay 08, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender