Tender For Labour Charges For Maintenance Improvement Dcw And Extension Work At Various Location In Operation Thiruvottiyur Section Of Tondiarpet Division
Tender Value
Ref. Documents
Estimated cost
Bid Submission
15 May 2023
0 days left
EMD
3000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
thiruvottiyur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Labour Charges For Maintenance Improvement Dcw And Extension Work At Various Location In Operation Thiruvottiyur Section Of Tondiarpet Division
BOQ
| Sl. No. | Item Description |
| 1 | LABOUR CHARGES FOR ERECTION OF DOUBLE POLE STRUCTURE WITH DISTRIBUTION TRANSFORMER. |
| 2 | Excavation of Structure Pole Pit 2\" x 3\" x 1/6 th of height of pole |
| 3 | Erection of 9.14 M RCC/9.0 Mtr PSC /RSJ pole |
| 4 | Transporting of 9.14 m poles from Road side to pole pit |
| 5 | Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement. |
| 6 | Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.DPDC channel, T.I. Fitting etc., in complete. |
| 7 | Excavation of stay pit 0.95x0.60x1.5m |
| 8 | Erection of Stay Set Complete |
| 9 | Sleeve concrete for stay set including all materials & cement |
| 10 | Erection of HG fuse set with transport |
| 11 | Erection of 11 KV AB switch complete set with transport |
| 12 | Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough |
| 13 | Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for DP Structure |
| 14 | Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for TP Structure |
| 15 | Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for Four Pole Structure |
| 16 | Erection of L.T.Open type fuse unit including cable jumpering upto the line. |
| 17 | Providing LT bus bar arrangementsin DT structure including fixing of cross arm and insulator. |
| 18 | Erection of H.T. jumpering in DP structure complete (150 * 3) |
| 19 | Erection of H.T. LAS(3 Nos) |
| 20 | Erection of L.T. LAS(4 Nos) |
| 21 | Erection of DT excluing loading and unloading using Crane - 63KVA/100KVA |
| 22 | Erection of DT excluing loading and unloading using Crane -Above 100 KVA |
| 23 | Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. Without Material |
| 24 | Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. - With Material |
| 25 | Painting of Structure pole with Distemper including cost of material |
| 26 | Loading and unloading of Distribution Transformer at site and store. (All Rating) |
| 27 | Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Upto 100 KVA |
| 28 | Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Above 100 KVA |
| 29 | LABOUR CHARGES FOR LAYING OF HT CABLE |
| 30 | Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Normal Road |
| 31 | Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Tar Road |
| 32 | Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,-Concrete Road |
| 33 | Loading and unloading of HT Cable including coiling and recoiling |
| 34 | Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle upto 5 Km |
| 35 | Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle above 5 Km |
| 36 | Laying of 11KV 3 X 300 sq mm XLPE cable |
| 37 | Laying of 11KV 3 X 120 sq mm XLPE cable |
| 38 | Covering HT cable by cement \"V\" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size onthe trough |
| 39 | Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. |
| 40 | Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) upto 5 Km |
| 41 | Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) above 5 Km |
| 42 | LABOUR CHARGES FOR LAYING OF LT CABLE |
| 43 | Loading and unloading of LT Cable including coiling and recoiling |
| 44 | Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle upto 5 Km |
| 45 | Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle above 5 Km |
| 46 | Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. - Normal Road |
| 47 | Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Tar Road |
| 48 | Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Concrete Road |
| 49 | Laying of LT 4 x 240 sq.mm cable |
| 50 | Laying of LT 4 X 120 sq.mm cable |
| 51 | Laying of LT 4 X 25 sq.mm cable |
| 52 | Laying of LT 2 X 16 sq.mm cable |
| 53 | Refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. |
| 54 | LABOUR CHARGES FOR ERECTION OF PILLAR BOX |
| 55 | Erection of 4 / 6 Way pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials,el. works, transportation, lead, lift etc., |
| 56 | Erection of Mini pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials,el. works, transportation, lead, lift etc., |
| 57 | Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 8 Way Pillar Box |
| 58 | Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 8 Way Pillar Box |
| 59 | Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 6 Way Pillar Box |
| 60 | Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 6 Way Pillar Box |
| 61 | Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 4 Way Pillar Box |
| 62 | Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 4 Way Pillar Box |
| 63 | Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - Mini Pillar Box |
| 64 | Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - Mini Pillar Box |
| 65 | LABOUR CHARGES FOR DISMANTLING OF PILLAR BOX |
| 66 | Dismantling of old 4 / 6 / 8 Way pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. |
| 67 | Dismantling of old Mini pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. |
| 68 | LABOUR CHARGES FOR MISCELLANEOUS WORK |
| 69 | Excavation of pole pit (pit size 2\"x3\"x1/6th of the length of poles) for 7.5mtrs/8 mtrs pole |
| 70 | Erection of 7.5m / 8m RCC/RSJ/PSC pole and other poles |
| 71 | Excavation of pole pit (pit size 2\"x3\"x1/6th of the length of poles) for 9.14m Pole |
| 72 | Erection of 9.14m RCC/RSJ/PSC pole and other poles |
| 73 | Trasportation of pole of all sizes from Road side to work spot |
| 74 | Trasportation of pole of all sizes from Stores to Road side upto 2KM |
| 75 | Trasportation of pole of all sizes from Stores to Road side upto Above 2 Km |
| 76 | Base concerting 30 cm thick for one pole including of all materials |
| 77 | Transporting of DTs/Metering sets/Line Materials through private vehicle from store to work spot / vice versa upto 10 Km |
| 78 | Transporting of DTs/Metering sets/Line Materials through private vehicle from store to work spot / vice versa Above 10 Km |
| 79 | Erection of V cross arm 3 1/2\"size |
| 80 | Erection of V cross arm41/2\" size |
| 81 | Erection of Tapping channel 5 \" size / V Cross Arm 5\" size |
| 82 | Excavation of stay pit |
| 83 | Erection of stay set complete |
| 84 | Fixing of 11 KV TI fitting |
| 85 | Fixing of 33 KV TI fitting |
| 86 | Fixing of LT 3 phase cross arm |
| 87 | Fixing of LT TI fitting |
| 88 | Fixing of single phase cross arm |
| 89 | LT pin insulator with pin |
| 90 | LT shackle with strap sets |
| 91 | 11 KV pin insulator with GI pin |
| 92 | 33 KV pin insulator with GI pin |
| 93 | 11 KV strain disc with metal parts |
| 94 | 33 KV strain disc with metal parts |
| 95 | Fixing of Aluminium knob |
| 96 | Fixing of caution / Danger Board |
| 97 | Providing of fly stay (excluding pole erection and earth excavation) |
| 98 | Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) - 7.5m/8m Pole |
| 99 | Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) - 9.14 metres pole (with coping of 1\" dia upto height of 1.1/2\" above ground level) Pole |
| 100 | Earthing of poles |
| 101 | Paving out conductor, stringing and sagging of line of 7/2.59mm ACSR / 7/2.50 mm AAAC conductors of LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. |
| 102 | Paving out conductor, stringing and sagging of line of 7/3.35mm ACSR / 7/3.15 mm AAAC conductors of LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. |
| 103 | Paving out conductor, stringing and sagging of line of 7/4.09mm ACSR Racoon conductors of HT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. |
| 104 | Paving out conductor, stringing and sagging of line of 7/4.72mm Dog conductors of HT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. |
| 105 | Numbering of location/each including cost of paint and labour |
| 106 | Providing of 2 wire flat guarding(Split neutral grounding)per span excluding of stay set erection |
| 107 | Providing of 4 wire flat guarding per span excluding of stay set erection |
| 108 | Providing of Craddle guarding including earthing and earth pit excavation per span excluding of stay set erection |
| 109 | Erection of street light fittings 2 feet/4 feet (All materials supplied by the Board) Labour alone. |
| 110 | Erection of cross bracing set 10\" / 15\" Structure - DP Structure |
| 111 | Erection of cross bracing set 10\" / 15\" Structure - TP Structure |
| 112 | Erection ofTop Channels 10\" / 15\" Structure - DP Structure |
| 113 | Erection ofTop Channels 10\" / 15\" Structure - TP Structure |
| 114 | Erection of33 KV centre rotating AB switch complete set |
| 115 | Erection of11 KV centre rotating AB switch complete set |
| 116 | Erection of Single phase spacer |
| 117 | Erection of Three phase spacer |
| 118 | Provision of jumper per phase for LT |
| 119 | Provision of Jumper per phase for HT |
| 120 | Provision of \"PA\" jumpers |
| 121 | Loading of Metering Set |
| 122 | Un loading of Metering Set |
| 123 | Erection of Metering Sets - Up to 11KV metering set |
| 124 | Erection of Metering Sets - Above 11KV metering set |
| 125 | Loading of 7.5/8 metres pole (RCC/PSC)/Each |
| 126 | Loading of9.14 metres pole RCC /9.0 mtr PSC/9.14 RSJ /Each |
| 127 | Unloading of 7.5/8 metres pole (RCC/PSC)/Each |
| 128 | Unloading of 9.14 metres pole RCC /9.0 mtr PSC/9.14 RSJ /Each |
| 129 | Loading of Conductor drum of all sizes with conductor |
| 130 | Loading of Conductor drum of all sizes without conductor |
| 131 | Unloading of Conductor drum of all sizes with conductor |
| 132 | Unloading of Conductor drum of all sizes without conductor |
| 133 | Manufacturing of MS clamps at works spot as per requirement , including alteration by using 50 x 8 mm Flat (with material) |
| 134 | Manufacturing of MS clamps at works spot as per requirement , including alteration by using 65 x 10 mm Flat (with material) |
| 135 | Cutting of Channel/Flat/Angle |
| 136 | Cutting of RSJ pole |
| 137 | Cutting of Tubular pole |
| 138 | Cutting of Rail pole |
| 139 | Drilling of 5/8\", 3/8\", 1/\" Holes in Channels / Angles - Slot Holes |
| 140 | Drilling of 5/8\", 3/8\", 1/\" Holes in Channels / Angles - Round Holes |
| 141 | Fixing of Missing doors in MS Mini Pillar Box |
| 142 | Fixing of Missing doors in MS 4 WayPillar Box |
| 143 | Fixing of Missing doors in MS 6 WayPillar Box |
| 144 | Fixing of Missing doors in MS 8 WayPillar Box |
| 145 | Fixing of Missing doors in FRPPillar Box |
| 146 | Provision of 2 Nos Hinges in all types of Pillar Box |
| 147 | LABOUR CHARGES FOR MAINTENANCE WORK |
| 148 | DP/TP Structure maintenance - Pole Mounted |
| 149 | DT maintenance for various capacity |
| 150 | Structure earthing wire redoing - Various capacity |
| 151 | Replacement of Structure earthing in complete without material - Various Capacity |
| 152 | DT structure Yard cleaning - Various Capacity |
| 153 | Watering to earth pits |
| 154 | Numbering of location including cost of paint and labour |
| 155 | Maintenance of 8 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. |
| 156 | Maintenance of 6 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. |
| 157 | Maintenance of 4 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. |
| 158 | Maintenance of Mini Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. |
| 159 | Numbering of Pillar with feeder details including cost of paint and labour |
| 160 | Maintenance of 11 KV ABS only at Structure.(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). |
| 161 | Maintenance of 11 KV ABS only at SS.(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). |
| 162 | Maintenance of 33 KV ABS at Structure(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). |
| 163 | Maintenance of 33 KV ABS at SS(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). |
| 164 | Cutting of big tree fouling on the line. |
| 165 | Cutting of tree branches fouling on the line. |
| 166 | Clearing of heavy bushes |
| 167 | Jungle/bushes/velikathan clearence |
| 168 | Set righting leanedHT/LT Poles at Pin Point Location |
| 169 | Set righting leanedHT/LT Poles at Cut Point Location |
| 170 | Re-sagging of HT Line -7/4.72 mm |
| 171 | Re-sagging (HT/LT) Line 7/4.09 mm |
| 172 | Re-sagging (HT/LT) Line7/3.35 mm |
| 173 | Re-sagging (HT/LT) Line 7/2.59 mm |
| 174 | DC of Single phase service |
| 175 | DC of Three phase service |
| 176 | RC of Single phase service |
| 177 | RC of Three phase service |
| 178 | LABOUR CHARGES FOR DISMANTLING WORK |
| 179 | Dismantling of 7.5m/8.0m Poles |
| 180 | Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles |
| 181 | Dismantling of Stay set complete |
| 182 | Dismantling of conductors including Coiling and Transporting from workspot to road side upto 7/3.35mm Conductor without transport |
| 183 | Dismantling of conductors including Coiling and Transporting from workspot to road side above 7/3.35mm Conductor without transport |
| 184 | Releasing of LT S ph \"X\" Arm/TI Fitting |
| 185 | Releaasing of LT 3 ph \"X\" Arm |
| 186 | Releasing of 3\" - 6\" \"V\" Cross Arm/Tapping channal/Guarding\"X\" Arm |
| 187 | Releasing of 4\" - 6\" and\"V\" Cross Arm |
| 188 | Releasing of5\"\"V\" Cross Arm |
| 189 | Releasing of Distn.Tr. Only at field |
| 190 | Dismantling of Transformer Structure materials - Up to 100 KVA |
| 191 | Dismantling of Transformer Structure materials - Above 100 KVA |
| 192 | Dismantling of 11KV AB Switch at Structure |
| 193 | Dismantling of 33KV AB Switch at Structure |
| 194 | Dismantling of H.G. fuse set |
| 195 | Dismantling of HT LAS at DT Structure |
| 196 | Dismantling of LT LAS at DT Structure |
| 197 | Dismantling of Earth Pipe and Structure earthing complete |
| 198 | Dismantling of 2 Sets Open type fuse unit with all wiring complete(including bus bar arrangement) |
| 199 | Dismantling of cross bracing set |
| 200 | Dismantling of Top Channel |
| 201 | Dismantling of Guarding including Dismantling of cross arm per span |
| 202 | Dismantling of Single ph service wire & re-effecting service including meter |
| 203 | Dismantling of three ph service wire & re-effecting service including meter |
| 204 | Breaking of RCC Damaged Poles after dismantling,releasing the grill including transporting to Road side |
| 205 | Stacking materials/Scrap |
| 206 | LABOUR CHARGES FOR ATTENDING 33KV & 11KV CABLE FAULT - MANUALLY |
| 207 | Earth work Excavation to the required depth, width(cable route)is 1.2m x 0.6m respectively(As per prevailingPWLC Rates) for attending HT Cable fault manually - Normal Road |
| 208 | Earth work Excavation to the required depth, width(cable route)is 1.2m x 0.6m respectively(As per prevailingPWLC Rates) for attending HT Cable fault manually - Tar Road |
| 209 | Earth work Excavation to the required depth, width(cable route)is 1.2m x 0.6m respectively(As per prevailingPWLC Rates) for attending HT Cable fault manually - Concrete Road |
| 210 | Earth work Excavation to the required depth, width(cable route)is 1.2m x 0.6m respectively(As per prevailingPWLC Rates) for attending LT Cable fault manually - Normal Road |
| 211 | Earth work Excavation to the required depth, width(cable route)is 1.2m x 0.6m respectively(As per prevailingPWLC Rates) for attending LT Cable fault manually - Tar Road |
| 212 | Earth work Excavation to the required depth, width(cable route)is 1.2m x 0.6m respectively(As per prevailingPWLC Rates) for attending LT Cable fault manually - Concrete Road |
| 213 | Installation of 11KV joint by private jointer in the absence of company jointer (intimation to be given to company through mail/ company phone Nos and record to be maintained) |
| 214 | Installation of 11KV joint by private jointer in the absence of company jointer (intimation to be given to company through mail/ company phone Nos and record to be maintained) |
| 215 | Refilling with M- sand over the cable and joints (cost of M.sand as per PWD schedule of rates @ Rs.1590/- per cub.M - 11 KV (10mx0.6mx0.15m)=0.9 cub.mx1590 |
| 216 | Refilling with M- sand over the cable and joints (cost of M.sand as per PWD schedule of rates @ Rs.1590/- per cub.M -33 KV (15mx0.6mx0.15m)=1.35 cub.mx1590 |
| 217 | Refilling labour charges /mtr - LT Cable |
| 218 | Refilling labour charges /mtr - HT Cable |
| 219 | Transporting of 11KV/33KV cables and joint kits from stores to site |
| 220 | Transporting of 11KV/33KV cables and joint kits from office to site |
| 221 | LABOUR CHARGES FOR ATTENDING 33KV & 11KV CABLE FAULT - BY USING TOOLS & PLANTS |
| 222 | Hire charges for engaging JCB |
| 223 | Hire charges for engaging Crane |
| 224 | Installation of joint by private jointer in the absence of company jointer (intimation to be given to company through mail/ company phone Nos and record to be maintained) - 11KV Fault |
| 225 | Installation of joint by private jointer in the absence of company jointer (intimation to be given to company through mail/ company phone Nos and record to be maintained) - 33KV Fault |
| 226 | Engaging Hydraulic compressor (Tractor) for Breaking concrete/Tar Roads (Wherever Necessary) |
| 227 | Rental for de-watering pump as per PWD schedule of Rate (Wherever necessary) |
| 228 | Engaging Labour for Manual excavation and cleaning the trench, joint pit excavation and identify the cable in addition to engaging JCB. -11 KV (Semi skilled Labour @ Rs.470/head) |
| 229 | Engaging Labour for Manual excavation and cleaning the trench, joint pit excavation and identify the cable in addition to engaging JCB. -33 KV (Semi skilled Labour @ Rs.470/head) |
| 230 | Concreting after rectification of 11KV / 33KV fault by using PCC 1:3:6(If applicable, with necessary justification & certification by concern Executive Engineer For reqd length,width and depth as per site condition) |
| 231 | LABOUR CHARGES FOR LAYING OF UG CABLE USING TRENCHLESS METHOD FOR FAULT RECTIFICATION / NEW WORK |
| 232 | Laying of HT UG Cable using Trenchless Technology without pipes |
| 233 | Laying of HT UG Cable using Trenchless Technology with pipes |
| 234 | LABOUR CHARGES FOR ERECTION OF SINGLE POLE STRUCTURE |
| 235 | Loading and Unloading of 9.0m Square Pole |
| 236 | Excavation of Pole Pit |
| 237 | Erection of 9.0m Square Pole |
| 238 | Transporting of Square Pole from Road Side to Pole Pit |
| 239 | Excavation of stay pit 0.95x0.60x1.5m |
| 240 | Erection of Stay Set Complete |
| 241 | Fixing of Single Pole Structure Material in complete shape |
| 242 | Erection of 16 / 25 / 40 KVA Distribution Transformer |
| 243 | Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough |
| 244 | Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement. |
| 245 | Sleeve concrete for stay set including all materials |
| 246 | Erection of HT LAS (3 Nos) |
| 247 | Erection of LT LAS (4 Nos) |
| 248 | Erection of LT Wiring Kit (Double Open Type Circuit) |
| 249 | Painting of single pole structure including iron materials double coat with materials |
| 250 | Painting of single pole structure including iron materials double coatwithout materials |
| 251 | Painting of Structure pole with Distemper including cost of material |
| 252 | GST |
AI Tender Summary
Tender Timeline
Apr 28, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedMay 15, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMay 16, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender