| 1 | GENERATOR Misc works in Generator overhauling:- |
| 2 | CLEANING / PAINTING OF BUS DUCT PRESSURIZATION UNIT |
| 3 | H2 PURGING AFTER UNIT SHUTDOWN & H2 REFILLING BEFORE OF UNIT LIGHT UP. |
| 4 | CLEANING / PAINTING OF H2 DRIER |
| 5 | TRANSFORMERS : GENERAL OVERHAULINGOF HT TRANSFORMERS -GENERATING TRANSFORMER |
| 6 | CLEANING / WASHING OF TRANSFORMERS & GT COOLER BANKS |
| 7 | TERMINAL TIGHTNESS |
| 8 | INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS ETC. |
| 9 | OVERHAULING OF FAN & PUMPMOTORS |
| 10 | STATION TRANSFORMER |
| 11 | CLEANING / WASHING OF TRANSFORMERS & GT COOLER BANKS |
| 12 | TERMINAL TIGHTNESS |
| 13 | INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS ETC. |
| 14 | OVERHAULING OF FAN & PUMPMOTORS |
| 15 | INTER-CONNECTING TRANSFORMER - |
| 16 | CLEANING / WASHING OF TRANSFORMERS & GT COOLER BANKS |
| 17 | TERMINAL TIGHTNESS |
| 18 | INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS ETC. |
| 19 | OVERHAULING OF FAN & PUMPMOTORS |
| 20 | UNIT AUXILIARY TRANSFORMER - |
| 21 | CLEANING / WASHING OF TRANSFORMERS & GT COOLER BANKS |
| 22 | TERMINAL TIGHTNESS |
| 23 | INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS ETC. |
| 24 | OVERHAULING OF FAN & PUMPMOTORS |
| 25 | NEUTRAL GROUNDING PANEL ( GEN., ST, UAT\"S) - |
| 26 | CLEANING / INSPECTION/ PAINTING |
| 27 | PAINTING OF TRANSFORMER OIL STORAGE TANK - |
| 28 | TRANSFORMER OIL STORAGE TANK 18 KL CAPACITY |
| 29 | PAINTING OF TRANSFORMER IDENTIFICATION BOARD AND LETTER WRITING |
| 30 | GENERAL OVERHAULING OF LT TRANSFORMERS CLEANING, WASHING, TIGHTNESS IF TERMINALS, INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS OF FOLLOWING : LT DRY TYPE TRANSFORMERS - |
| 31 | CLEANINGOF TRANSFORMERS |
| 32 | PAINTING OF TRANSFORMERS |
| 33 | TERMINAL TIGHTNES, INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS,ETC |
| 34 | LT OIL FILLED TRANSFORMERS - |
| 35 | CLEANINGOF TRANSFORMERS |
| 36 | TERMINAL TIGHTNES, INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS,ETC |
| 37 | SWITCHYARD : |
| 38 | BAY EQUIPMENTS: CT / PT/ LA, CIRCUIT BREAKERS, ISOLATORS, MARSHALLING BOX, MOM BOX, EARTH SWITCH ETC. CLEANING AND PAINTING, TERMINAL TIGHTNESS (220kV SWITCHYARD bay No. 23 & 24) |
| 39 | BAY EQUIPMENTS: CT / PT/ CVT/ LA, CIRCUIT BREAKERS, ISOLATORS, MARSHALLING BOX, MOM BOX, EARTH SWITCH ETC. CLEANING AND PAINTING, TERMINAL TIGHTNESS (400kV SWITCHYARD ) |
| 40 | CIRCUIT BREAKER PLATFORM CLEANING AND PAINTING |
| 41 | CIRCUIT BREAKER PLATFORM AND IDENTIFICATION BOARD CLEANING AND PAINTING |
| 42 | BUS DUCTS : INSPECTION, TIGHTNESS, CLEANING, PAINTING AND REPLACEMENT OF INSULATORS (IF REQUIRED) |
| 43 | 21 KV GEN BUS DUCT |
| 44 | 11 KV STATION BUS DUCT |
| 45 | 6.6 KV UAT/STATION BUS DUCT |
| 46 | LT TRANSFORMER BUS DUCT |
| 47 | ESP : |
| 48 | LTMSB, ACP BUSES & MCC (CLEANING , TIGHTNESS & COMPLETE INSPECTION OF ALL BUSES) |
| 49 | CLEANING ,TIGHTNESS WORK IN EC PANEL |
| 50 | REPAIRING OFEC PANEL |
| 51 | CLEANING & RESISTANCE CHECKING OF HEATERS, REPLACEMENT OF FAULTY ESP HOPPER HEATERS |
| 52 | SERVICING/REPLACEMENT OF SHAFT INSULATOR HEATING ELEMENTS |
| 53 | SERVICING/REPLACEMENT OF SUPPORT INSULATOR HEATING ELEMENTS |
| 54 | GENERAL OVERHAULING OFTR (TRANSFORMER RECTIFIER) SET |
| 55 | HT SWITCHGEAR (11/6.6 KV) |
| 56 | BUS CLEANING , TIGHTNESS & COMPLETE INSPECTION OF ALL BUSES. |
| 57 | BREAKER CLEANING,TIGHTNESS & OPERATION CHECKING |
| 58 | 415V LTSWBD/ MCC/ACDB/ SWITCHGEAR PANEL : |
| 59 | BUS CLEANING , TIGHTNESS & COMPLETE INSPECTION OF ALL BUSES |
| 60 | BREAKER /MODULE SERVICING,TIGHTNESS & OPERATION CHECKING |
| 61 | BOP SWITCHGEAR\"S PANEL : |
| 62 | BUS CLEANING , TIGHTNESS & COMPLETE INSPECTION OF ALL BUSES |
| 63 | BREAKER /MODULE SERVICING & OPERATION CHECKING |
| 64 | BOP LOCAL CONTROL PANELS / WALL MOUNTED PANELS- |
| 65 | BREAKER /MODULE SERVICING & OPERATION CHECKING |
| 66 | POWER HOUSE LIGHTING & POWER SUPPLY - |
| 67 | CLEANING , TIGHTNESS & COMPLETE INSPECTION OF ALL LIGHTNING TRANSFORMERS & LDB |
| 68 | PROVIDING POWER SUPPLY AS PER SITE REQUIREMENT & FOR OTHER MAINTENANCE WORK OF BMD,TMD ETC.ROUND O\"CLOCK |
| 69 | LIGHTING CIRCUITS IN TG, BOILER, SWITCHGEAR, WT PLANT, DM PLANT, FUEL OIL BUILDING |
| 70 | HT MOTORS(SERVICING OF HT MOTORS ) |
| 71 | CLEANING , TIGHTNESS, BEARING INSPECTION , GREASING ETC. |
| 72 | PAINTING OF HT MOTORS |
| 73 | NOMENCLATURE OF MOTORS |
| 74 | COMPLETE OVERHAULING OF HT MOTOR (UPTO 1000 KW) |
| 75 | COMPLETE OVERHAULING OF HT MOTOR (ABOVE 1000 KW) |
| 76 | HT MOTOR COOLER (GENERAL INSPECTION & CLEANING) |
| 77 | PAINTING OF CANOPY/ SHED OF HT MOTORS |
| 78 | LT MOTORS SERVICING |
| 79 | MOTORS ABOVE 40 KW |
| 80 | MOTOR 40 KW TO 11 KW |
| 81 | MOTORS 10 KW TO 5.5 KW |
| 82 | MOTORS 5 KW TO 1.1 KW |
| 83 | MOTORS 1 KW AND BELOW |
| 84 | LT MOTORS OVERHAULING:- |
| 85 | MOTORS ABOVE 40 KW |
| 86 | MOTOR 40 KW TO 11 KW |
| 87 | MOTORS 10 KW TO 5.5 KW |
| 88 | MOTORS 5 KW TO 1.1 KW |
| 89 | MOTORS 1 KW AND BELOW |
| 90 | SERVICING OF BATTERY BANK/ CHARGER/DCDB : |
| 91 | SERVICING OF UNIT / STATION / SWITCHYARD BATTERY SET |
| 92 | CLEANING / SERVICING OF 220 V DC DB |
| 93 | CLEANING / SERVICING OF 220 V DC SOLENOID VALVE DB |
| 94 | SERVICING OF SOOT BLOWERS : |