Name of Work:– NCTPS–I-M.II Circle- AHP Dn. – Unit – I, II & III – Outsourcing of Operation and Maintenance of PDFAC System consists of PLC, Switch gear panels, modules, breakers, Fly ash conveying, Instrument compressors, Intermediate conveying and Instrument compressors and Auxiliaries, PDFACS equipments in ESP area, Intermediate silo, cooling tower and fly ash pipelines to a length of 1500Mtrs from ESP NCTPS-I to 1000MT silo top located at NCTPS Stage-II including structural supports, silo top target box, vent bag filter system, silo unloading chutes, loading the fly ash vehicles round the clock and 100MT Weigh bridge and Auxiliaries, cleaning of silo area and silo approach road for a period of 60 days or until completion of quantity ( 58000 MT) whichever is earlier.
Sl. No.
Item Description
1
Unit I, II & III - Outsourcing of Operation and Maintenance of PDFAC System consists of PLC, Switch gear panels, modules, breakers, Fly ash conveying, Instrument compressors, Intermediate conveying and Instrument compressors and Auxiliaries, PDFACS equipments in ESP area, Intermediate silo, cooling tower and fly ash pipelines to a length of 1500Mtrs from ESP NCTPS-I to 1000MT silo top located at NCTPS Stage-II including structural supports, silo top target box, vent bag filter system, silo unloading chutes, loading the fly ash vehicles round the clock and 100MT Weigh bridge and Auxiliaries, cleaning of silo area and silo approach road for a period of 60 days or until completion of quantity ( 58000 MT) whichever is earlier Including cost of labour, spares and consumables, etc.,
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.