Rural Development And Panchayats Department has published Supply, Installation, Testing & Commissioning Of Hsd Fired Boiler Based Central Heating System Along With All Allied Equipment’S At Labour Saria, Guest House And Creech Centre At Sankoo. Submission Date for this Tender is 19-05-2023. Tanks and Cylinders Tenders in sankoo Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 08-May-2023 | Corrigendum | Other | 16-05-2023 |
2 | 16-May-2023 | Corrigendum | Date | 19-05-2023 |
3 | 17-May-2023 | Corrigendum 1 | Other | 19-05-2023 |
Sl. No. | Item Description |
1 | Supply, installation, testing and commissioning of: Hot Water Boiler. |
2 | HSD Fired, Horizontal Fire Tube, Hot Water Generator 2 lac Kcal/hr capacity,fitted wirth Combustion equipments, all boiler mountings control panel,control valves,and all other accessories recommended by OEM along with PCC, foundation block. MAKE: Riello/Baymak Capacity each 2 Lac-Kcal/Hr (1+1 stand by) |
3 | Chimney |
4 | Fabrication, Erection of M.S. chimney for flue gas ducts of 250 mm dia and thickness of 3MM .compleate with 50mm Insulation and 26SWGAluminiumCladding.The Chimney shall be measured as per actual. |
5 | Hot Water Circulation Pump |
6 | Hot Water Circulation Mono-block Pump complete with electric motor of Single-Phase along -with common base frame duly grouted in cement concrete foundation alongwith NRV"S as required. Suction 80 mm Delivery 65 mm MAKE: Kirlosker/Villo Discharge: 6LPS at 25 m Head Rating = 3HP (approx) |
7 | Oil Transfer pump Gear Oil Transfer Pump with electric motor single phase rating along with common base frame duly grouted in cement concrete foundation. MAKE: Rotodell |
8 | Capacity 2 LPS (min) @12 mtr Head |
9 | Soft Water /Glycol Pumps Soft Water Pumps complete with electric motor of 1dp, 230V,50Hz, 1HP rating along with common base frameduly grouted in cement concrete foundation. MAKE: Crompton/Kirlosker |
10 | Capacity 2 LPS (min) @12 mtr Head |
11 | Day Oil Tank |
12 | SITC of Day Oil Tank 200 ltr capacity HDPE triple layer insulated with 25mm thick nitrile foam with 26 Guage alminium cladding and mounted on a suitable iron stand. |
13 | Expansion tank |
14 | SITCofExpansion tank 200 ltr capacity HDPE triple layer insulatedwith25mmthicknitrilefoamwith26Guage aluminium cladding and mounted on a suitable iron stand. |
15 | Soft Water Tnak/Glycol Water Tank |
16 | Soft Watertank of HDPE(triplelayer)with necessary connections.Capacity 500 Ltrs. |
17 | Hot Water RadiatorsSteel Panel heating radiators conforming to EN442 with working pressure ranging from 10-13-bar having working temperature at 110 c, complete with top grils and side covers as standard alongwith inlet, otlet valves and threded plug etc. Inlet water Temp:75 degree C Oulet Water Temp:65 degree C Make Emtas/Borpan |
18 | 750 Kcal/hr (Double Panel Double Convector) |
19 | 2000 Kcal/hr (Double Panel Double Convector) |
20 | 2500 Kcal/hr (Double Panel Double Convector) |
21 | 3000 Kcal/hr (Double Panel Double Convector) |
22 | 3500 Kcal/hr (Double Panel Double Convector) |
23 | 4000 Kcal/hr (Triple Panel Triple Convector) |
24 | PipingHeavy Duty Ms class C pipe (external building) insulated with 25mm nitrile foam with 26SWG aluminium cladding for external pipes and with heat proof enamel paint for interior pipes along with all fitting like bends, TEE supports etc. |
25 | 65 mm DIA (50 mm thick insulation) |
26 | 50 mm DIA (50 mm thick insulation) |
27 | 40 mm DIA (25 mm thick insulation) |
28 | 32 mm DIA (25 mm thick insulation) |
29 | 20 mm DIA (25 mm thick insulation) |
30 | Piping measurement as per actual at site requirement. HeavyDutyPPRpipe(internalbuilding),PN10/SDR-11, insulatedwith25mmnitrilefoamwith26SWGaluminium cladding for external pipes and with heat proof enamel paint forinteriorpipesalongwithallfittingslikebends,TEE supports etc. |
31 | 40 mm DIA (25 mm thick insulation) |
32 | 32 mm DIA (25 mm thick insulation) |
33 | 20 mm DIA (25 mm thick insulation) |
34 | Control Valves |
35 | Butterfly Valves (CI/GM) 65mm= 10 NOs. Ball Valves (PPR) 50mm=06 Nos. 40mm=06 Nos. 32mm=10 Nos 25mm=30 Nos 20mm= 26 Nos. Y-Strainer 65mm DIA (C.I Flanged)= 02 Nos. Non-Return Valves 65mm DIA (C.I Flanged)= 02 Nos. |
36 | Electrical Main Panel |
37 | Main Control Panel having Separate cubicals for each equipments viz. Isolation for HOT Water Generator 2 Nos. (3hp each), DOL starter for Hot water Circulation Pumps 2 Nos. Soft Water Pumps 2 Nos. (1hp) and three empty), and on-load change over switch (100A), MCCB (100A). The control panel shall be provided with the copper bus dully insulated of required ratings and 3 in 1 digital Voltmeter/ Ammeter / frequency meer, indicators etc. |
38 | Cable Try |
39 | Perforated cable tray of 2mm thickenss and supported from ceiling the wall duly painted as per site condition. 150mm wide |
40 | Electrical cableProviding and fixing PVC insulated un-armoured copper conductor cables from main panel board to various equipments to be laid over cable trays with appropriate clamps and fixing arrangements. MAKE: Polycab/Finolex |
41 | 3 Core- 6sq.mm |
42 | 3 Core- 2.5sq.mm |
43 | 2 Core- 1.5sq.mm |
44 | 3.5Core-16sq.mm armoured service cable |
45 | 3 Core 35sq.mm aluminium cable from DG Set to main Control Panel |
46 | Servo Voltage Stabilizer Supply, installation, testing and commissioning of 20 KVA DG Set 3-phase, Oil cooled service stabilizer micro processor controled with high and low voltage cut-off, single phase preventer, short-circuit and over-load protection having digital display 220-460 volts phase to phase with panel as per specifications duly filled with recommended transformer oil upto full capacity. |
47 | Capacity: 20 KVA with input of 220 -460 volts phase to phase and output of 415 volts ± 1% phase to phase. |
48 | Earthing Pit |
49 | Earthing for various equipments inside boiler house using copper plate electrode of size 500x500x3mm placed in 1000x1000x1800mm pit filled with charcoal and salt by copper strip of size 20x3 mm along with perforated GI pipe. |
50 | Earthing Strip |
51 | Copper strip of size 15x3mm from earting electrode to the electic panel, stabilizer, boiler and pumps using proper fast fastener conceiled under floor. |
52 | Coolant |
53 | Providing and filling of non-toxic anti freeze(the right anti- freeze product intended for use in heating bioler) of propylene glycol solution and water mixture.The ratio of anti freeze solution to the water shall be the optimum to achieve desired freeze protection of-40°C. |
54 | Angle Iron GI Sheet Shed for DG Set including 1. RCC base of minimumfeet of height above ground in 1:2:4 for inhousing DG Set. 2. Angle iron posts of 12 feets including grouting length with a spacing of 6 feet minimum. 3. Truss with Angle iron using 65x65x6 mm angle and 50x50x6mm angle for including cost of purlines, rafters etc. as per standard. 4. Coloured sheet roufing (Hi Rib) fixed with GI Screw and G.I. limpet washers filled with rubber washer including cutting to size and shape where ever required (0.50 mm thick) including angle iron where ever required for fixing of j Hooks. For Generators and Boilers |