| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In lime mortar with old mughal bricks |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift up to 1.5 m. |
| 5 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.As in item 279 above but in proportions of 8:4:1 |
| 6 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.Same as above item no. 279 but with 2 cm. gauge stone grit instead of 4 cm. gauge stone ballast. |
| 7 | M-150 Brick Work in 1:6 cement & fine sand 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work.Same as item no. 305 but in 1:4 one cement & four Coarse sand of 2.20 F.M. mortar.As in item 309 above but for walls of one brick thick, add for extra labour to the rate of item no. 309. |
| 8 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 9 | P/F M.S. specials such as Tee , Bends , Collars , Tapers, Gap pieces,including Flange Ends as required , Painting ,Cutting, weldingas per site requirement of MSpipe thickness etc complete in all respect as per direction of E/I. |
| 10 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge.( for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) |
| 11 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 12 | 15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand) |
| 13 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 14 | Hiring of WeldingSet Running Time @ 6 Hrs |
| 15 | Hiring of Gas cutting Set With oxygenAnd LPG Running Time @ 6 Hrs |
| 16 | Supply of Tractor with Trolley Complete at site on hire basis including cost of disel and driver etc.completein all respect as per direcion of engineer in-charge. |
| 17 | Supply of J.C.B. Complete at site on hire basis including cost of disel and driver etc.completein all respect as per direcion of engineer in-charge. |
| 18 | Supply of Labour Complete at site on etc. in all respect as per direcion of engineer in-charge. |
| 19 | Providing and Laying rectified Glazed Ceramic Floor Tiles 300 mm x 300 mm or more (thk. to be specified by the manufacturer) of 1st quality confirming to IS 15622 of approved make in all colors, shades except white, ivory, grey, fume red brown, laid on 20mm tkh. cement mortar 1:4 ( 1 cement : 4 coarse sand) including pointing the joints with cement and matching pigmnets etc. complete. |
| 20 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars |