Irrigation Department has published Tender For Requirement Of Consumable Item At Rewari Store. Submission Date for this Tender is 05-05-2023. Cutting Crimping and Punching Tools Tenders in rewari Haryana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | PVC tape Roll ¾’’ (Make Steelgrip) |
2 | Emery Paper Rough (A4 size) 60 No., 80 No.(make-Max) |
3 | Hacksaw Blade D/E (Make Surya) |
4 | Copper Thimble 70mm2 Make Dowel |
5 | Copper Thimble 95mm2 Make Dowel |
6 | Araldite epoxy resin & hardener (1 Kg) Make Araldite |
7 | Rubber Chequeared Sheet (1mX 2mX 12.5mm thick) make Jyoti |
8 | Glass Tape Roll ¾’’As per sample |
9 | Empire tape roll ¾’’ As per sample |
10 | Waste Dhoti As per sample |
11 | Coupling Link Assy. For 20 to 50 Cs. Pump with Aluminium Bush/synthetic rubber bush As per sample |
12 | H.T Coupling Bolt with Nylock Nut (3/4” x 4”) As per sample |
13 | H.T Coupling Bolt (3/4” x 3.5”) As per sample |
14 | Coupling Rubbber Bush with Nut, Bolt & Washer synthetic for 10CsPump As per sample |
15 | Coupling Rubbber Bush with Nut, Bolt & Washer synthetic for 20Cs to 60Cs Pump As per sample |
16 | Rubber Sheet 1/8” make Jyoti |
17 | Enamel Paint Black Make Berger |
18 | Plastic Arm Chair (Modular Chair model No.) Make Italica |
19 | Hex. Nut & Bolt (1” x 3.5”) As per sample |
20 | Hex. Nut & Bolt (6/8” x 4”) Full thread IS-1363 P1, P3-2002 As per sample |
21 | Terms & Conditions:- 1. The quoted rate will be for F.O.R. destination and inclusive of GST and all incidental charges. Nothing extra shall be paid separately. 2. Material which to be supplied should be as per sample and conforming to I.S. Specification. 3. Department will not be responsible for non submission of BOQ / Bid Document online by due date, due to any fault of internet/ E-tendering. 4. Completion period – completion period is 30 Days. 5. The bidder must create their contractor ID on HEW portal (http://works.haryana.gov.in) and accordingly upload the contractor profile summary in bidding documents, failing which the bid will be rejected. 6. 100% payment will be made on receipt of material. 7. The material will be supplied within the period prescribed in the supply order failing which penalty shall be imposed @ 0.5% per week on approved rates. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail