Tender For Rate Contract For Erection, Maintenance And Dismantling Of Electrical Networks ( Oh Line &Cable ) Including Ss Maintenance In Redhills Subdivision Of Avadi Division. Erection Of Distribution Transformer Structure , Excavation Of Structure Pole Pit 2X3x1 / 6 Th Of Height , Erection Of 9.14 M Rcc / 9.0 Mtr Psc / Rsj Pole , Transporting Of 9.14 M Poles From Road Side To Pole Pit , Structure Pole Mass Concreting And Coping 0.6X0.6X1.65 For Dp Structure Including Cost Of Materials And Cement. , Erection Of Structure Materials Complete Such As Top Channel, Seating Channel, Belting Angle, Cross Bracing.Dpdc Channel, T.I. Fitting Etc., In Complete. , Excavation Of Stay Pit 0.95X0.60X1.5M And Erection Of Stayset Complete , Sleeve Concrete For Stay Set Including All Materials , Erection Of Hg Fuse Set With Transport , Erection Of 11 Kv Ab Switch Complete Setwith Transport , Transformer Structure Grounding And Earthing Of Structure Complete Including Excavtion Of Earth Pit And Erection Of Earth Pipe With Salt, Coal And Earth Refiling Etc., Completeincluding Cost Of Coal And Salt , Erection Of Aluminium Bus Bar Pipe Complete For H.T.Bus Bar Arrangements For Dp Structure , For Triple Pole And Four Pole Structure , Erection Of L.T.Open Type Fuse Unit Including Cable Jumpering Upto The Line. , Providing Lt Bus Bar Arrangementsin Dt Structure Including Fixing Of Cross Arm And Insulator. , Erection Of H.T. Jumpering In Dp Structure Complete , Erection Of H.T. Las , Erection Of L.T. Las , Erection Of Dt Excluing Loading And Unloading , Upto 100 Kva , Above 100 Kva , Painting Of Two Coats Of Aluminium Paints For Dp Structure And Iron Materials Including Cost Of Paint And Distemper Etc. , Loading And Unloading Of Distribution Transformer At Site And Store. , Dismantling Of Failed Dt From The Structure Including Removing Ht & Lt Connection And All Other Incidental Works. ( Excluding Loading And Unloading ) , Upto 100 Kva , Above 100 Kva , Crane Hire Charges , Laying Of Ht Cable , Excavation Of Cable Trench 0.6 Meters Width And 1.2 Meters Depth Including Cost Of Providing Sign Boards, Danger Lights, Indication Arrangements Lead, Lift, Labour And Tools And Plants Etc., , Normal Road ( Earth ) , Tar Road , Concrete Road , Transporting Of 11 Kv Ht Cable From Departmental Stores To Work Spot By Engaging Private Vehicle Including Recoiling , Coiling And Loading And Unloading At Both Sites. , 3X300 Sq Mm Xlpe ( 1 Drum: 200 M ) , 3X120 Sq Mm Xlpe ( 1 Drum: 200 M ) , Laying Of Ht Cable , Laying Of 300 Sq Mm Xlpe Cable , Laying Of 120 Sq Mm Xlpe Cable , Covering Ht Cable By Cement V Trough After Covering The Cable With Good Loose Earth Including Loading, Unloading And Transport From Stores To Site And Letter Painting Of Feeding Details & Cable Size Onthe Trough , Refilling With Excavated Earth Layers Well Consolidated As Per Std Specification Including All Materials, Lead, Lift Etc., Complete. , Transport Back Any Balance Cable, Empty Drums And Other Materials If Any By Engaging Private Vehicle Including Recoiling, Coiling And Loading And Unloading At Both Sides From Workspot To Departmental Stores ( Minimum 2 Empty Drums ) , Laying Of Lt Cable , Tansport Of Lt Cable To Work Site By Engaging Vehicle Including Recoiling, Coiling, Loading & Unloading At Both Sites. , 240 Sq.Mm ( 1 Drum - 200 M ) , 120 Sq. Mm ( 1 Drum - 500 M ) , Excavation Of Cable Trench Size 0.45M X0.75 M Including Cost Of Providing Sign Boards, Danger Lights, Indication Arrangements, Lead, Lift, Labour And T&P Etc. , Normal Road ( Earth ) , Tar Road , Concrete Road , Laying Of Lt Cable , Laying Of 240 Sq.Mm Cable , Laying Of 120 Sq.Mm Cable , Laying Of 25 Sq.Mm Cable , Laying Of 16 Sq.Mm Cable , Refilling With Excavated Earth Layers As Per Std Specification Including All Materials, Lead, Lift Etc., Complete. , Erection Of Pillar Box , Erection Of Pillar Box Including Excavation Of Foundation Pits As Per Standard Specification 2 Nos Pillar Concrete Walls, Coping And Earthing Including Cost Of All Materials, Elec. Works, Transportion, Lead, Lift Etc., , 4 / 6 / 8 Way & Mini Pillar Boxes For 2 Feet I-E 0.6M , 4 / 6 / 8 Way& Mini Pillar Boxes For 3 Feet I-E 0.9M ( Rate For Hb / Con ) , 4 / 6 / 8 Way & Mini Pillar Boxes For 4 Feet I-E 1.2 M ( Rate For Hb / Con ) , 4 / 6 / 8 Way & Mini Pillar Boxes For 5 Feet I-E 1.5 M ( Rate For Hb / Con ) , Cleaning & Painting With Aluminium Paint 2 Coats & Numbering With Fdr Details , 8 Way Pillar Box , 6 Way Pillar Box , 4 Way Pillar Box , Mini Way Pillar Box , Dismantling Of Pillar Box , Dismantling Of Old Pillar Box Including Associated Accessories, Loading On The Vehicle, Transporting, Unloading At Stores And Stacking. , 4 / 6 / 8 Way Pillar Box , Mini Pillar Box , Miscellaneous - Oherection Work , Erection Of Rcc / Rsj / Psc Pole And Other Poles Including Excavation Of Pole Pit ( Pit Size 2X3x1 / 6Th Of The Length Of Poles ) , Excavation Ofpole Pit For 7.5 / 8 Meters , Erection Of Pole Pit For7.5 / 8 Meters , Excavaion Of Polepit For 9.14 Meters , Erection Of Polepit For 9.14 Meters , Base Concerting 30 Cm Thick For One Pole Including Of All Materials , Erection Of V Cross Arm 3 1 / 2Size , Erection Of V Cross Arm41 / 2 Size , Erection Of Tapping Channel 5 Size , Erection Of Stay Set Complete , Fixing Of 11 Kv Ti Fitting , Fixing Of 33 Kv Ti Fitting , Fixing Of Lt 3 Phase Cross Arm , Fixing Of Lt Ti Fitting , Fixing Of Single Phase Cross Arm , Lt Pin Insulator With Pin , Lt Shackle With Strap Sets , 11 Kv Pin Insulator With Gi Pin , 33 Kv Pin Insulator With Gi Pin , 11 Kv Strain Disc With Metal Parts , 33 Kv Strain Disc With Metal Parts , Fixing Of Aluminium Knob , Providing Of Fly Stay ( Excluding Pole Erection And Earth Excavation ) , Concreting Of Poles With 1:3:6 Mix, 1.1 / 2 Broken Metal Jelly And M Sand Including Coping ( M Sand, Jelly And Cement, Will Be Supplied By The Contractor ) ( Size 2X3x1 / 6Th Of Pole Height ) , 7.5 Meters / 8 Meters Pole , 9.14 Meters Pole ( With Coping Of 1 Dia Upto Height Of 1.1 / 2 Above Ground Level ) , Earthing Of Poles , Paving Out Conductor, Stringing And Sagging Of Line Of All Sizes Of Acsr / Aaac Conductors Of Ht / Lt Lines Including Pin Binding Of Supports And Terminating At Shackle Points Using Aluminium Roller, Including Jumpering. , Upto 7 / 2.59 Mm Acsr / 7 / 2.50 Aaac , Upto 7 / 3.35 Mm Acsr / 7 / 3.15 Aaac , Raccoon 7 / 4.09 Per , Dog Conductor 7 / 4.72 , Numbering Of Location / Each Including Cost Of Paint And Labour , Providing Of Guarding Per Span Excluding Of Stay Set Erection , 2 Wire Flat Guarding ( Split Neutral Grounding ) , 4 Wire Flat Guarding , Craddle Guarding Including Earthing And Earth Pit Excavation , Erection Of Street Ligh Fittings 2 Feet / 4 Feet ( All Materials Supplied By The Board ) Labour Alone. , Erection Of Cross Bracing Set , Dp Structure , Tp Structure , Erection Oftop Channels , 10 Centre , 15 Centre , Erection Of33 Kv Centre Rotating Ab Switch Complete Set , Erection Of11 Kv Centre Rotating Ab Switch Complete Set , Erection Ofspacers , Line Seperators & Jumpers , Single Phase Spacer / Line Seperators , Three Phase Spacer / Line Seperators , Provision Of Paa Jumper Per Phase For Lt , Provision Of Paa Jumper Per Phase For Ht , Metering Set Loading & Unloading , Loading , Un Loading , Erection Ofmetering Sets , Up To 11 Metering Set , A ) .Loading Of Poles , 7.5 / 8 Meters Pole / Each , 9.14 Meters Pole Rcc / 9.0 Mtr Psc / 9.14 Rsj / Each , B ) .Un Loading Of Poles , 7.5 / 8 Meters Pole ( Rcc / Psc ) / Each , 9.14 Meters Pole Rcc / 9.0 Mtr Psc / 9.14 Rsj / Each , Loading Of Conductor Drum , Conductor Drum Of All Sizes With Conductor , Conductor Drum Of All Sizes Without Conductor , Un Loading Of Conductor Drum , Conductor Drum Of All Sizes With Conductor , Conductor Drum Of All Sizes Without Conductor , Maintenance Work , Maintenance Of Dt Structure For Various Capacity ( Pole Mounted Structure ) , Dp / Tp Structure Maintenance , Dt Maintenance , Replacement Of Ht Bushing Rod , Replacement Of Lt Bushing Rod , Replacement Of Gasket , Structure Earthi Re - Wiring . , Replacement Of Structure Earthing In Complete Without Material , Dt Structure Yard Cleaning , Numbering Of Location Including Cost Of Paint And Labour , Maintenance Of Pillars Works Such As Replacement Of Damaged Insulators Worn Out Stem Bolts, Lugs, Termination Of Cables And Dressing. , 8 Way Pillar Box / 6 Way Pillar Box , 4 Way Pillar Box , Mini Pillar Box , Fixingofmissing Doors In Pillars Including Materials , Ms Mini Pillar Door , Ms 4 Waypillar Door , Ms 6 Way / 8 Waypillar Door , Frp 4 Way Pillar Door , Maintenance Of 11 Kv Abs Only. ( Checking Of Alignment And Replacement Of Wornout Fixed And Moving Contacts Pt Insulator, Changing Earthing And Lubricating ) . , 11 Kv Ab Switch At Structure In Work Site , 11 Kv Ab Switch At Ss , Maintenance Of 33 Kv Abs Only. ( Checking Of Alignment And Replacement Of Wornout Fixed And Moving Contacts Pt Insulator, Changing Earthing And Lubricating ) . , 33 Kv Ab Switch At Ss / Structure , Tree Cutting ( Tree Clearance ) , Cutting Of Big Tree Fouling On The Line. , Clearing Of Heavy Bushes , Jungle / Bushes / Velikathan Clearence , Straitening Ofleanedht / Lt Poles , Pin Point Location , Cut Point Location , Resagging Of Ht / Lt Lines For All Conductor Sizes , Re-Sagging ( Ht ) 7 / 4.72 Mm , Re-Sagging ( Ht / Lt ) 7 / 4.09 Mm , Re-Sagging ( Ht / Lt ) 7 / 3.35 Mm And 7 / 3.15 Sqmm , Re-Sagging ( Ht / Lt ) 7 / 2.59 Mm And 7 / 2.50 Sqmm , Dismantling Works , Dismantling Of 9.14 Mtr. Poles / Rsj / Tubular Poles , Dismantling Of8mtr / 7.5 Mtr Poles / , Dismantling Of Stay Set Complete , Dismantling Of Conductors Upto 7 / 2.59 Mm Including Coiling And Transporting From Workspot To Road Side , Dismantling Of Conductors 7 / 3.35 Mm And Above Including Coiling And Transporting From Workspot To Road Side , Dismantling Of Damaged 6 Way / 4 Waypillar Box , Dismatling Of Transformer Structure Materials , Dismatling Ofab Switch With Hg Fuse Set , Releasingof V X Arm , Stacking Of Materials / Scarp , Substation Maintenance , Removing Weed In Substation / Office Premises Per Sq.Mtr ( Jungle Clearance ) , Hot Oil Circulation For Replacement Of Tr.Oil In Pr.Tr. With Filter Machine & Loading. , Transporting Offilter Machine Unit& Oil Drum ( To&Fro ) , Cleaning Of110 Kv Breakersincluding Cts And Allied Maintenance Work , Cleaning Of 110 Kvlas , Cleaning Of 110 Kvab Switch And Applying Petroleum Jelly , Cleaning Of 110 Kv Power Transformer Insulators And Other Maintenance Work , Cleaning Of 110 Kv Bus Insulators , Cleaning Of33 / 11 Kv Breakersincluding Cts And Allied Maintenance Work , Cleaning Of 33 Kv / 11 Kvlas , Cleaning Of 33 / 11 Kvab Switch Including Tightening Of Bolt & Nutt And Applying Petroleum Jelly , Cleaning Of 33 / 11 Kv Kv Power Transformer Insulators And Other Maintenance Work , Cleaning Of 33 / 11 Kvbus Insulators , Aluminium Painting In Substation , 33Kvstructure , 11Kv Structure , Power Transformer , Breaker , Erection Ofsingle Poledtstructure , Loading Andunloading Of Rcc 9 / 9.14 Mtrsquare Pole , Excavation Ofpole Pit For 3 X 3 X 6Size , Erection Of Rcc 9 / 9.14 Mtrsquare Pole Including Base Plate Erection. , Loading , Unloading And Erection Ofhvdsdt ( 16 , 25 & 40 Kva ) , Excavation Of Stay Pit For 2 X 2 X 6 Size , Erection Of Stay Set Complete Including Base Plate , Single Poletransformer Structure Grounding And Earthing Of Structure Complete Including Excavtion Of Earth Pit And Erection Of Earth Pipe And Pit Filled With Mixture Of Salt, Coal And Earth Refiling Etc., Completeincluding Cost Of Coal And Salt , Fixing Of Earth Connections With Gi Wire , Bolt And Nuts. , Erection Oftransformerstructure Materials , Erection Of Hg Fuse Set , Erection Of 11 Kv Ab Switch Complete Set , Provision Of Mass Concreting Of Pole With Cement , Sand And Jelly , Erection Of H.T. Las , Erection Of L.T. Las , Erection Of H.T. Jumpering In Dt Structure Complete , Erection Of L.T.Open Type Fuse Unit Including Cable Jumpering Complete Set. , Erection Of Ab Switch Alone For Dp Switch