|
| 1 | Earthwork Excavation for foundation in all types of soils and sub soils including soft disintegrated rock and soft rock to the full depth including all leads and lifts etc., complete complying with the standard specification, drawing and as directed by the departmental Engineers. |
| 2 | Supplying and filling with approved quality of dry river sand to filling in foundation and basement and filling the site in layers of not more than 15cm thicketc., complete. Complying with standard specifications and drawings and has directed by departmental Engineers |
| 3 | Cement concrete of mix 1:4:8 (one cement –four sand – eight broken stone) using Hard broken granite stone jelly of 40 mm gauge for foundation leveling course, standard specifications and drawings and has directed by departmental Engineers. Including cost and conveyance of all materials to working site, laying concrete and curing etc. |
| 4 | Supplying and erecting in the position of MS sheets including necessary supports for plane surfaces using MS Sheets of size 90cm x 60cm and or suitable shifted with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joints of size 10cm x 6.5cm, complete complying with standard specification below Ground level. |
| 5 | a). Square Columns & Sunshade |
| 6 | b) Lintel, Beam & Roof Slab |
| 7 | Supplying, fabricating and placing in position mild steel or tar steel bars for all reinforced cement concrete items of work including cost of steel transporting, straightening, cutting, bending, cranking, blinding, welding etc. including cost of MS or RTS rod and binding wire, all labour and materials complete Complying with standard specifications and drawings and has directed by departmental Engineers. |
| 8 | Providing and laying in position, standardizedconcrete mix M-20 Grade in accordance with IS 456-2000,using 20mm and downgraded hard broken granitestone jelly for all RCC items of works with minimum cement concrete of 325kg/M3 and maximum water cement ratio of 0.55, including admixture (plasticizer/super plasticizer) in recommended proportions as perIS :9103 to accelerate ,retard setting of concrete , improve workability without preparing strength and durability with about ( 5 cu.m) 7730 kg of 20mm machine crushed stone jelly and with about(3.30cu.m) 5156 kg of10-12mm machine crushed stone jelly and with about (4.79cu.m) 7670kg of sand, butexcluding cost of reinforcementgrill and fabricating charges , centering and shuttering and also including laying , vibrating with mechanical vibrators,finishingcuring etc., and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming etc.,complete |
| 9 | Foundation Basement |
| 10 | Upto 4.50 m Height |
| 11 | Brick work in cement mortar 1:5 mix using Fly Ash bricks of 230x110x70mm (8 3/4\" x 41/4\" x 23/4\") from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications |
| 12 | Supplying and fixing MS grill to doors windows and ventilators etc. using 20mm x 6mm as directed by the departmental officers inclusive of cost of MS grill and labour charges including one coat of red oxide and fixing in position etc. complete (as per schedule of rates) as per standard specification |
| 13 | Plastering with cement mortar 1:5 (one cement five sand) 12 mm thick etc., Complete. |
| 14 | Collection,supply and filling ofWell gravel from approved quarry to work site and stocking to the Departmental gauge for premeasurement as directed by the Departmental Engineer, to required depth not more than 15cm depth including cost andConveyance ofgravel to site and all labour charges for filling etc., Complete complying with Standard Specification |
| 15 | Supplying and laying Rubberised interlocking Paver blockM40 grade 83mmthick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with stone dust cushion below the uniform shap of approvednon skitting surface in the top and the rate including levelling the base preparation ofpavers as sub base, stone dust cushion 150mm thick layingout of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. |
| 16 | Painting two coats with ready mixed plastic emulsion paint of 1st class quality and of approved color over a priming coat including through scraping clean removal of dirt etc., complete and including necessary plaster of paris putty wherever required |
| 17 | Painting two coats with best approved quality colour enamel paint for new Iron Works excluding priming coat including cost and conveyance of enamel paint etc. |