Tender For E-Quotation For Seeking Firm Rates For Non-Schedule Items For Preparing Estimates Of Annual Repair And Maintenance Of Water Supply System And Sanitation T Rinpas, Kanke, Ranchi Under D.W And S Mechanical Division, Ranchi., ranchi-Jharkhand

Drinking Water And Sanitation Department has published Tender For E-Quotation For Seeking Firm Rates For Non-Schedule Items For Preparing Estimates Of Annual Repair And Maintenance Of Water Supply System And Sanitation T Rinpas, Kanke, Ranchi Under D.W And S Mechanical Division, Ranchi.. Submission Date for this Tender is 04-05-2023. Lathe Machine Tenders in ranchi Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

37406346
Tender For E-Quotation For Seeking Firm Rates For Non-Schedule Items For Preparing Estimates Of Annual Repair And Maintenance Of Water Supply System And Sanitation T Rinpas, Kanke, Ranchi Under D.W And S Mechanical Division, Ranchi.
Open Tender
Indian
Jharkhand
ranchi
04-05-2023

Tender Details

E-Quotation For Seeking Firm Rates For Non-Schedule Items For Preparing Estimates Of Annual Repair And Maintenance Of Water Supply System And Sanitation T Rinpas, Kanke, Ranchi Under D.W And S Mechanical Division, Ranchi. , Cost Towards Providing All Labours Tools & Techniciansfor Dismantling And Disconnecting Of 40 Hp Kirloskar Make Motor And Taken Out Rotor From Motor Stator Cutting Removing Burnt And Damaged Coil And After Repairing Refitting The Same Etc All Complete. , Cost Towards Full Rewinding Of 40 Hp Motor Stator With Supplying Of Super Enameled Round Copper Conductor Suitable Gauge Class F Insulating Materials Making All Connection Taping, Varnishing With Dr Beck Varnish All Complete With Deducting The Cost Of Taken Out Scrap Materials ( Wt. Of Wire Is 18.5Kg Approx ) . , S / F Ball Bearing Skf Make 6312&6309 At De&Nde Side Of 40 Hp Kirloskar Make Motor Including Proper Greasing All Complete. , Cost Towards Providing All Labour Tools And Tackles For Dismantling Of 40 Hp Single Stage Kirloskar Make C / F Pump With Changing Damaged Parts Such As Gm Neck Ring As Per Size And Sample 2 Nos. Shaft Sleeve 2 Nos. Shaft Sleeve Check Nut 2 Nos. Making Ci Bearing Housing As Per Size And Sample 2 Nos. Supplying And Fitting Ball Wearing Skf Make 6309 2Nos. Making Supplying And Fitting Ms Gland Tightner As Per Size And Sample 2 Pair Making Citric Motion Of Rotating Unit Assembling On Lathe M / C Etc All Complete , Cost Towards Repairing Of 40 Hp L&T Motor Starter By Supplying And Fitting L&T Make 3 Core Ml-4 Power Contactor 45 Amp. With Auxiliary Contractor Complete Set 2Nos. Supplying And Fitting Timer Type Lt -100 1Nos., Over Load Relay Suitable Range 1Nos.Etc All Complete. , Cost Towards Providing All Labours Tools & Technicians For Taking Out Damaged 250Amp. Tpn Hrc Fuse Type Disconnector Main Switch Replacing New Disconnector Fuse Unit With Hrc Fuse-1 Set Doing Electrical Connection And Testing On Full Load After Deducting The Cost Of Taken Out Scrap Materials , Supplying And Fitting 6”Dia Tyre Coupling Complete Set With Nut Bolt Washer And Tyre Of Reputed Make For 40 Hp Pump Set. , Cost Towards Providing All Labour Tools And Tackles For Dismantling And Taken Out Damaged Nr Valve And S / F 4”Dia C.I Df Nr Valve Heavy Duty Rating Pn-1 Isi Marked On Delivery Pipe Line With All Work Including Cost Of Labour Charge All Complete Testing On Full Load With Deducting The Cost Of Scrap Materials. , Cost Towards Supplying And Laying 50 Mm² X 3.5 Core Aluminium Armoured Cable From Main Switch To Industrial Panel. ( Both Sets ) . , Cost Towards Supplying And Laying 16 Mm² X 3 Core Copper Cable From Panel To Starter And Starter To Motor In Bunch Of Two. ( Both Sets ) . , Cost Towards Replacing Damaged Suction Pipe By Making Supply & Fitting 100 Mm Dia Heavy Duty M.S. Suction Pipe 10Feet Long Both And 100 Mm Dia M.S. Flange Welding, 100Mm Dia Long Bend 1 No With Nut Bolt Rubber Insertion Etc Required For The Job. , Transportation Charge Of Above P / Set From Work Site To Work Shop And Vice Versa Including Loading And Unloading Charge. , Cost Towards Dismantling Of 100 Hp Wpil Make Single Stage C / F Pump And Taking Out Its Rotating Unit Assembly With Changing Of Damaged Parts By New Making S / F Neck Ring As Per Sample Size-2 Nos, C.I Shaft Sleeve As Per Sample Size – 2Nos, Making S / F Shaft Sleeve Check Nut As Per Sample Size – 2 Nos , S / Fball Bearing Skf 6309- 2 Nos And Repairing Of Bearinghousing By Welding Turning Machining As Per Bearing Size-2 Nos, C.I Gland Tightner As Per Sample Size – 2Nos Including Cost Of Reassembling Of Rotating Unit Assembly Balancing Rotating Unit Assembly And Fitting The Pump With Supply Of Grease Gland Packing Oil Packing Paper With Transporting Cost Of Rotating Unit From P / Plant To Workshop And Back , Cost Toward Supplying Fitting & Changing Of 100 Hp Jyoti Make Motor Ball Bearing Skf 6316 At De Side 1 No. And Sk 6314 Nde 1 No. With Grease. , Cost Towards Repairing Of 100 Hp L & T Make F.A.S.D Starter With S / F Contactor Set-2 Sets ) , Relay Unit ( 85-135A ) -1Set, Timer Unit-1 Set, Making New Connection Etc All Complete. , Supplying And Fitting 6”Dia Tyre Coupling Complete Set With Nut Bolt Washer And Tyre Of Reputed Make For 100 Hp Pump Set. , Cost Towards Supplying And Fitting Mccb 630 Amp. For Bus-Bar Make L&T Schneider / Bch , Cost Towards Supplying And Fitting Mccb 250 Amp. For Bus-Bar Make L&T Schneider / Bch , Cost Toward Supplying Fitting & Changing 100Mm Dia Cidf Sluice Valve ( Pn-1 ) 1 Set & Cidf Nr Valve ( Pn-1 ) 1 No. Including Fitting Charge , Cost Toward Supplying Fitting & Changing 150 Mm Dia Ci Foot Valve Hiding Single Leather Flat And Gun Metal Seating All Complete. , Submersible Pump Sets , Cost Towards Providing All Labour Tools And Technicians For Dismantling And Taken Out 5Hp Submersible P / Set With Column Pipe For Bore Well. , Cost Towards Repairing Of5 Hp Submersible Pump With S / F Norylimpeller As Per Size And Sample, Diffuser, S.S. Shaft, S.S. Coupling, S.S. Sleeve, Nut, C.I. Suction Casing, C.I Nrv Etc. All Complete ( 23 Stage ) After The Deduction Of Cost Of Scrape Materials. , Cost Towards For Rewinding And Repairing Of5 Hp Submersible Motor With S / F 1.2 Swg Round Copper Winding Wire 24 Slot, Gun Metal Bush, Thrust Plate, Thrust Bearing, Diapharm, Oil Seal, Etc With Lathe Work. All Complete. After The Deduction Of Cost Of Scrape Materials. , Supplying All Material Such As 40 Mm Dia G.I. Pipe Medium Quality 15 Ft. Long, Charcoal Salt Etc. For Making Earthing Station As Per I.E. Rule , Cost Towards Replacement Of Old And Damaged Underground Service Line By Supplying New Overhead Line 10 Mm² 3Core Copper Wire After The Deduction Of Cost Of Scrap Materials. , Supplying And Laying ( Under And Over Ground ) 2 Dia Aqua Gold Weather Proof Pvc Pipe From Bore Well To Main Rising Pipe Line ( Damaged Pipe Replacement ) Make Supreme / Isi Mark ( Both Sets ) , Supplying And Laying Ground And On Wall 10 Swg, G.I. Wire For Doing Continuous Earthing For All Electrical Equipments , Cost Towards S / F And Changing Of 2”Dia Upvc Column Pipe With Heavy Duty Socket ( Make- Supreme / Paras ) For Both Sets. , Cost Towards Replacement Of Damaged Submersible Cable By Supplying And Fitting 4 Mm2x 3 Core Flat Submersible Cable Including Cable Jointing All Complete. After The Deduction Of Cost Of Scrape Materials. , Providing All Labour, Tools Tackles& Technicians For Lowering Of 5Hp Submersible Pump Set With All Accessories In The Bore Well , Cost Towards Supplying And Fitting ( 1 ) 50 Mm Dia G.M. Full Way Valve – 1 No ( 2 ) 40 Mm Dia Nr Valve – 1 No ( 3 ) 40 Mm Dia G.I. Bend ( 4 ) 2” Dia M.S. Clamp With Nut Bolt 2 Pair After The Deduction Of Cost Of Scrape , Supplying And Installation Suitable Size Panel Board For 5 Hp Submersible Pump Including Fixing On Wall Comprising Of Following Points Such As ( 1 ) D.O.L Starter -1No. ( 2 ) Hrc Fuse – 3 No. ( 3 ) Voltmeter With Selector Switch – 1 Set ( 4 ) Ammeter With Selector Switch – 1 Set ( 5 ) Phase Indicating Neon Lamp – 3 Nos. Etc. All Complete After The Deduction Of Cost Of Scrap Materials. , Supplying And Fitting Union 1.5 Dia , Supplying And Fitting Elbow 1.5 Dia , Supplying And Fittingtee 1.5 Dia , Supplying And Fitting Socket 1.5 Dia , Supplying And Fitting Upvc Valve 1.5 Dia , Transportation Charge Of Above P / Set From Work Site To Work Shop And Vice Versa Including Loading And Unloading Charge.

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: E-quotation for seeking firm rates for non-schedule items for preparing estimates of annual repair and maintenance of water supply system and sanitation t RINPAS, Kanke, Ranchi under D.W & S Mechanical Division, Ranchi.
Sl. No. Item Description
1Cost towards providing all labours tools & techniciansfor dismantling and disconnecting of 40 HP Kirloskar make motor and taken out rotor from motor stator cutting removing burnt and damaged coil and after repairing refitting the same etc all complete.
2Cost towards full rewinding of 40 HP motor stator with supplying of super enameled round copper conductor suitable gauge class F insulating materials making all connection taping, varnishing with DR beck varnish all complete with deducting the cost of taken out scrap materials (wt. of wire is 18.5kg approx).
3S/F ball bearing SKF make 6312&6309 at DE&NDE side of 40 HP Kirloskar make motor including proper greasing all complete.
4Cost towards providing all labour tools and tackles for dismantling of 40 HP single stage Kirloskar make C/F pump with changing damaged parts such as GM neck ring as per size and sample 2 nos. shaft sleeve 2 nos. shaft sleeve check nut 2 nos. making CI bearing housing as per size and sample 2 nos. supplying and fitting ball wearing SKF make 6309 2nos. making supplying and fitting MS gland tightner as per size and sample 2 pair making citric motion of rotating unit assembling on lathe m/c etc all complete
5Cost towards repairing of 40 HP L&T motor starter by supplying and fitting L&T make 3 core ML-4 power contactor 45 amp. With auxiliary contractor complete set 2nos. supplying and fitting timer type LT -100 1nos., over load relay suitable range 1nos.etc all complete.
6Cost towards providing all labours tools & technicians for taking out damaged 250amp. TPN HRC fuse type disconnector main switch replacing new disconnector fuse unit with HRC fuse-1 set doing electrical connection and testing on full load after deducting the cost of taken out scrap materials
7Supplying and fitting 6”dia tyre coupling complete set with nut bolt washer and tyre of reputed make for 40 HP pump set.
8Cost towards providing all labour tools and tackles for dismantling and taken out damaged NR valve and S/F 4”dia C.I DF NR valve heavy duty rating PN-1 ISI marked on delivery pipe line with all work including cost of labour charge all complete testing on full load with deducting the cost of scrap materials.
9Cost towards supplying and laying 50 mm² x 3.5 core aluminium armoured cable from main switch to industrial panel. (Both sets).
10Cost towards supplying and laying 16 mm² x 3 core copper cable from panel to starter and starter to motor in bunch of two. (Both sets).
11Cost towards replacing damaged suction pipe by making supply & fitting 100 mm dia heavy duty M.S. suction pipe 10feet long both and 100 mm dia M.S. flange welding, 100mm dia long bend 1 no with Nut bolt rubber insertion etc required for the Job.
12Transportation charge of above p/set from work site to work shop and vice versa including loading and unloading charge.
13Cost towards dismantling of 100 HP WPIL make single stage C/F pump and taking out its rotating unit assembly with changing of damaged parts by new making S/F neck ring as per sample size-2 nos, C.I shaft sleeve as per sample size – 2nos, making S/F shaft sleeve check nut as per sample size – 2 nos , S/Fball bearing SKF 6309- 2 nos and repairing of bearinghousing by welding turning machining as per bearing size-2 nos, C.I gland tightner as per sample size – 2nos including cost of reassembling of rotating unit assembly balancing rotating unit assembly and fitting the pump with supply of grease gland packing oil packing paper with transporting cost of rotating unit from p/plant to workshop and back
14Cost toward supplying fitting & changing of 100 HP Jyoti make motor ball bearing SKF 6316 at DE side 1 No. and SK 6314 NDE 1 No. with grease.
15Cost towards repairing of 100 HP L & T make F.A.S.D starter with S/F contactor set-2 sets) , Relay unit (85-135A)-1set, timer unit-1 set,making new connection etc all complete.
16Supplying and fitting 6”dia tyre coupling complete set with nut bolt washer and tyre of reputed make for 100 HP pump set.
17Cost towards supplying and fitting MCCB 630 Amp. for bus-bar make L&T Schneider / BCH
18Cost towards supplying and fitting MCCB 250 Amp. for bus-bar make L&T Schneider / BCH
19Cost toward supplying fitting & changing 100mm dia CIDF sluice valve (PN-1) 1 set & CIDF NR valve (PN-1) 1 No. including fitting charge
20Cost toward supplying fitting & changing 150 mm dia CI foot valve hiding single leather flat and gun metal seating all complete.
21Submersible Pump Sets
22Cost towards providing all labour tools and technicians for dismantling and taken out 5HP submersible p/set with column pipe for bore well.
23Cost towards repairing of5 HP submersible pump with S/F norylimpeller as per size and sample, diffuser, S.S. shaft, S.S. coupling, S.S. sleeve, nut, C.I. suction casing, C.I NRV etc. all complete(23 stage) after the deduction of cost of scrape materials.
24Cost towards for rewinding and repairing of5 HP submersible motor with S/F 1.2 SWG Round Copper winding wire 24 Slot, Gun Metal Bush, thrust plate, Thrust bearing, diapharm, oil seal, etc with lathe work. all complete. after the deduction of cost of scrape materials.
25Supplying all material such as 40 mm dia G.I. pipe medium quality 15 ft. long, charcoal Salt etc. for making earthing station as per I.E. rule
26Cost towards replacement of old and damaged underground service line by supplying new overhead line 10 mm² 3core copper wire after the deduction of cost of scrap materials.
27Supplying and laying (Under and over ground) 2" dia aqua gold weather proof PVC pipe from bore well to main rising pipe line (Damaged pipe replacement ) Make supreme / ISI Mark (both sets)
28Supplying and laying ground and on wall 10 SWG, G.I. wire for doing continuous earthing for all electrical equipments
29Cost towards S/F and changing of 2”dia UPVC column pipe with heavy duty socket (make- Supreme/ Paras) for both sets.
30Cost towards replacement of damaged submersible cable by supplying and fitting 4 mm2X 3 core flat submersible cable including cable jointing all complete. after the deduction of cost of scrape materials.
31Providing all labour, tools tackles& technicians for lowering of 5HP submersible pump set with all accessories in the bore well
32Cost towards supplying and fitting (1) 50 mm dia G.M. full way valve – 1 no (2) 40 mm dia NR valve – 1 no (3) 40 mm dia G.I. bend (4) 2” dia M.S. clamp with nut bolt 2 pair after the deduction of cost of scrape
33Supplying and installation suitable size panel board for 5 HP submersible pump including fixing on wall comprising of following points such as (1) D.O.L starter -1no. (2)HRC fuse – 3 no. (3) Voltmeter with selector switch – 1 set (4) Ammeter with selector switch – 1 set (5) phase indicating neon lamp – 3 nos. etc. all complete after the deduction of cost of scrap materials.
34Supplying and fitting union 1.5" dia
35Supplying and fitting elbow 1.5" dia
36Supplying and fittingTee 1.5" dia
37Supplying and fitting Socket 1.5" dia
38Supplying and fitting UPVC Valve 1.5" dia
39Transportation charge of above p/set from work site to work shop and vice versa including loading and unloading charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail