| 1 | Dismantling andremoving of cement concrete/RCC including stacking the sameuseful materials for reuse and removing the debris far away from working area with all leads, lifts & delifts including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. complete asper direction of Engineer-in-Charge. |
| 2 | Dismentaling Brick or stone masonary in line or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debries within 50m leadetc. complete as per direction of Engineer-in-Charge. |
| 3 | Providing cast insitu 375 mm dia double under reamed piles(6 Mtr. Long pile) drives to required depth below the ground levels as per specification with RCC 1:1:5:3 using 12mm size and downgraded hard crusher broken granite chips excluding cost of steel rod MS Rod as hall with CI core in RCC bore holes of required size including cost, carriage ,royality and all other taxes and labour charges etc. Complete as per direction of the Engineer-in-Charge. |
| 4 | Earth work in excavation of foundation in all kinds of soil by manual means/mechanical means with all leads, lifts & delifts including leveling and dressing the foundation bed upto design bed level and depositing the excavated earth away from the working area including breaking clods maximum 5cm to 7cm in size and laying in layers not exceeding 0.30mtr. in depth including bailing out water and dewatering if required etc. complete as per direction of Engineer-In-Charge |
| 5 | Filling foundation and plinth with sand including watering & ramming with all labour andT&P’s withall leads, lifts and delifts including cost carriage & royalty of all materials etc. complete asper direction of Engineer-in-Charge |
| 6 | Cement concrete (1:3:6) using 4cm size hard granite crusher broken metal free from weathered skin surface of uniform colour and texture from approved quarry and approved quality conferming to specification, mixing by concrete mixture including hoisting and laying concrete in position with all leads, lifts, and delifts including cost conveyance, royalty and taxes of materials including dewatering by suitable means, supplying T&P quaring for specified period with hire and running charges of machineries required for the work, construction and maintenance of coffer dam and approach road if required till completion of work etc. complete as per direction of Engineer-in-Charge. |
| 7 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working areaand stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. complete asper direction of Engineer-in-Charge. 1.Foundation |
| 8 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working areaand stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. complete asper direction of Engineer-in-Charge2.Superstructure |
| 9 | Labour charges for straighting, cutting, bending , binding and tying the grils and placing in position for fabrication and finishing of reinforcement including topping when necessary including supply of binding wire 18 to 20 gauge with all leads, lifts from binding yard including cost, carriage of un coated HYSD bar confirming to Fe 415 grade including over lapping, and wastage, welding as per direction of Engineer-in-Charge. |
| 10 | Cement concrete (1:2:4) using 20mm size hard crusher broken granite chips free from weathered skin surface, dust and all other deleterious materials includingcost, carriage, royalty and taxes of materials to the site of work with hoisting, laying concrete in position including curing upto required period etc. complete as per direction of Engineer-in-Charge. |
| 11 | Providing and laying cement concrete 1:1.5:3 with with 12mm downgraded hard granite chips free from weathered skin and other deleterious materials of approved quality of uniform colour and texture aggregate and sharp sand of approved grading and quality for RCC/CC confirming to the specifications with all leads, lifts delifts and and mixing by mechanical /manual means including cost, carriage, royalties and taxes of all materials including de watering by suitable means mixing concrete by concrete mixer and placing in position with all T&P curing for required period by suitable means, etc. complete asper direction of Engineer-in-Charge. |
| 12 | Filling foundation and plinth with excavated materialsincluding watering ramming with all labour and all T&P’s withall leads, lifts and delifts including cost carriage & royalty of all materials etc. complete asper direction of Engineer-in-Charge |