}

Tender For Supply Of Materials - Srp To Fort With Ancient Buildings Enclosed Therein, Sidhout, Ysr Kadapa District, A.P., sidhout-Andhra Pradesh

Archaeological Survey Of India -ASI has published Tender For Supply Of Materials - Srp To Fort With Ancient Buildings Enclosed Therein, Sidhout, Ysr Kadapa District, A.P.. Submission Date for this Tender is 15-05-2023. Construction Material Tenders in sidhout Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

37371333
Tender For Supply Of Materials - Srp To Fort With Ancient Buildings Enclosed Therein, Sidhout, Ysr Kadapa District, A.P.
Open Tender
Indian
Andhra Pradesh
sidhout
15-05-2023

Tender Details

Tender For Supply Of Materials - Srp To Fort With Ancient Buildings Enclosed Therein, Sidhout, Ysr Kadapa District, A.P.--- 1 Cost and supply of good quality Un-slaked/Kankar lime packed in air tight bags including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work. 2 Cost and Supply of Brick Surkhi free from organic impurities grit and silt including loading, unloading, transportation and neatly stacking at the site complete as directed by the site in-charge of work. 3 Cost and Supply of good quality River sand free from organic impurities grit and silt including loading unloading, transportation and neatly stacking at site etc. complete as directed by the site in-charge of work 4 Cost and Supply of good quality 40 mm brick aggregate including loading, unloading, transportation and neatly stacking at the site etc., complete as directed by the site in-charge of work. 5 Cost and supply of RR stones of size not less than 0.30x0.30x0.30m for footings including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work 6 Cost and supply of RR stones of size not less than 0.30x0.20x0.20m for gravity retaining wall including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work 7 Cost and supply of Cyclopean stones of size not less than 0.30 to 0.40m length 0.30 t0 0.45 m height and 0.60 to 0.80m width for fortification wall including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work 8 Cost and supply of Gravel including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work. 9 Cost and supply of RR stones of size not less than 0.20x0.20x0.15m for gravity retaining wall including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work. 10 Cost and supply of Mud Mortar including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work. 11 Cost and supply of Digging bar/ Crowbars of 6 feet length 32mm dia including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work. 12 Cost and supply of Spades with handle including loading, unloading, transportation etc., complete as directed by the site in charge of work. 13 Cost and supply of Plastic mortar pans including loading, unloading, transportation etc., complete as directed by the site in charge of work. 14 Cost and supply of Manila rope bundles of 2 inch dia (10 meters length each) including loading, unloading, transportation etc., complete as directed by the site in charge of work. 15 Cost and supply of Casurina ballies of 3” to 4” dia with 12 to 15 feet length including loading, unloading, transportation etc. complete as directed by the site in charge of work. 16 Cost and supply of Casurina ballies of 2” to 3” dia with 12 to 15 feet length including loading, unloading, transportation and fixing in the position etc. complete as directed by the site in charge of work. 17 Cost and supply of single wheel Wheel barrows(Iron) for carrying materials including loading, unloading, transportation etc. complete as directed by the site in charge of work. 18 Cost and supply of Hammer with handle (500Grams) including loading, unloading, transportation etc. complete as directed by the site in charge of work. 19 Cost and supply of Chisels -0.30mtr with 32mm dia including loading, unloading, transportation etc. complete as directed by the site in charge of work. 20 Cost and supply of Tamper with handle of size 0.20x0.20x1.23mtr including loading, unloading, transportation etc. complete as directed by the site in charge of work. 21 Cost and supply of Rubber boots including loading, unloading, transportation etc. complete as directed by the site in charge of work. 22 Cost and supply of Safety belt including loading, unloading, transportation etc. complete as directed by the site in charge of work. 23 Cost and supply of Hand gloves including loading, unloading, transportation etc. complete as directed by the site in charge of work. 24 Cost and supply of Safety helmets including loading, unloading, transportation etc. complete as directed by the site in charge of work. 25 Cost and supply of Plastic pots including loading, unloading, transportation etc. complete as directed by the site in charge of work. 26 Cost and supply of Empty water drums with capacity of 200 litre including loading, unloading, transportation etc. complete as directed by the site in charge of work. 27 Cost and supply of Wire rope with 12mm dia including loading, unloading, transportation and etc. complete as directed by the site in charge of work. 28 Cost and supply of Wire rope clamps including loading, unloading, transportation etc. complete as directed by the site in charge of work. 29 Cost and supply of Coir string including loading, unloading, transportation etc. complete as directed by the site in charge of work. 30 Cost and supply of ¾ “ Tata chisel rods- 0.15 to 0.20 mtr with 32mm dia including loading, unloading, transportation etc. complete as directed by the site in charge of work. 31 Cost and supply of 100 mm dia stone cutting blades (ISI Brand) including loading, unloading, transportation etc. complete as directed by the site in charge of work. 32 Cost and supply of Charcoalincluding loading, unloading, transportation etc. complete as directed by the site in charge of work 33 Cost and supply of Paint-3Ltrs & brushes- 5No.sto the site etc. complete as directed by the site in charge of work 34 Cost and supply of Dual power Lime grinder machine with followingSpecifications : Gear box type, 10HP Diesel engine and Electrical motor, 980 rpm, roller speed-25 rpm, grinding tub diameter 4to 5, Output-100 Cubic feet per hour, tub cast iron with marble, Grinding stone roller of weight about 200kgs including loading, unloading transportation etc., complete and as directed by the site in-charge.

Key Value

Document Fees
Refer document
EMD
INR 181692.0 /-
Tender Value
INR 72.67 Lakhs /-

BOQ Items

Name of Work: Supply of Materials - SRP to Fort with ancient buildings enclosed therein, Sidhout, YSR Kadapa district, A.P.
Sl. No. Item Description
1Cost and supply of good quality Un-slaked/Kankar lime packed in air tight bags including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work.
2Cost and Supply of Brick Surkhi free from organic impurities grit and silt including loading, unloading, transportation and neatly stacking at the site complete as directed by the site in-charge of work.
3Cost and Supply of good quality River sand free from organic impurities grit and silt including loading unloading, transportation and neatly stacking at site etc. complete as directed by the site in-charge of work
4Cost and Supply of good quality 40 mm brick aggregate including loading, unloading, transportation and neatly stacking at the site etc., complete as directed by the site in-charge of work.
5Cost and supply of RR stones of size not less than 0.30x0.30x0.30m for footings including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work
6Cost and supply of RR stones of size not less than 0.30x0.20x0.20m for gravity retaining wall including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work
7Cost and supply of Cyclopean stones of size not less than 0.30 to 0.40m length 0.30 t0 0.45 m height and 0.60 to 0.80m width for fortification wall including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work
8Cost and supply of Gravel including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work.
9Cost and supply of RR stones of size not less than 0.20x0.20x0.15m for gravity retaining wall including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work.
10Cost and supply of Mud Mortar including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work.
11Cost and supply of Digging bar/ Crowbars of 6 feet length 32mm dia including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work.
12Cost and supply of Spades with handle including loading, unloading, transportation etc., complete as directed by the site in charge of work.
13Cost and supply of Plastic mortar pans including loading, unloading, transportation etc., complete as directed by the site in charge of work.
14Cost and supply of Manila rope bundles of 2 inch dia (10 meters length each) including loading, unloading, transportation etc., complete as directed by the site in charge of work.
15Cost and supply of Casurina ballies of 3” to 4” dia with 12 to 15 feet length including loading, unloading, transportation etc. complete as directed by the site in charge of work.
16Cost and supply of Casurina ballies of 2” to 3” dia with 12 to 15 feet length including loading, unloading, transportation and fixing in the position etc. complete as directed by the site in charge of work.
17Cost and supply of single wheel Wheel barrows(Iron) for carrying materials including loading, unloading, transportation etc. complete as directed by the site in charge of work.
18Cost and supply of Hammer with handle (500Grams) including loading, unloading, transportation etc. complete as directed by the site in charge of work.
19Cost and supply of Chisels -0.30mtr with 32mm dia including loading, unloading, transportation etc. complete as directed by the site in charge of work.
20Cost and supply of Tamper with handle of size 0.20x0.20x1.23mtr including loading, unloading, transportation etc. complete as directed by the site in charge of work.
21Cost and supply of Rubber boots including loading, unloading, transportation etc. complete as directed by the site in charge of work.
22Cost and supply of Safety belt including loading, unloading, transportation etc. complete as directed by the site in charge of work.
23Cost and supply of Hand gloves including loading, unloading, transportation etc. complete as directed by the site in charge of work.
24Cost and supply of Safety helmets including loading, unloading, transportation etc. complete as directed by the site in charge of work.
25Cost and supply of Plastic pots including loading, unloading, transportation etc. complete as directed by the site in charge of work.
26Cost and supply of Empty water drums with capacity of 200 litre including loading, unloading, transportation etc. complete as directed by the site in charge of work.
27Cost and supply of Wire rope with 12mm dia including loading, unloading, transportation and etc. complete as directed by the site in charge of work.
28Cost and supply of Wire rope clamps including loading, unloading, transportation etc. complete as directed by the site in charge of work.
29Cost and supply of Coir string including loading, unloading, transportation etc. complete as directed by the site in charge of work.
30Cost and supply of ¾ “ Tata chisel rods- 0.15 to 0.20 mtr with 32mm dia including loading, unloading, transportation etc. complete as directed by the site in charge of work.
31Cost and supply of 100 mm dia stone cutting blades (ISI Brand) including loading, unloading, transportation etc. complete as directed by the site in charge of work.
32Cost and supply of Charcoalincluding loading, unloading, transportation etc. complete as directed by the site in charge of work
33Cost and supply of Paint-3Ltrs & brushes- 5No.sto the site etc. complete as directed by the site in charge of work
34Cost and supply of Dual power Lime grinder machine with followingSpecifications : Gear box type, 10HP Diesel engine and Electrical motor, 980 rpm, roller speed-25 rpm, grinding tub diameter 4"to 5", Output-100 Cubic feet per hour, tub cast iron with marble, Grinding stone roller of weight about 200kgs including loading, unloading transportation etc., complete and as directed by the site in-charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail