Tender For U1 Esp Overhauling Job During Under Ahp Em Stage1, murshidabad-West Bengal

West Bengal Power Development Corporation Limited has published Tender For U1 Esp Overhauling Job During Under Ahp Em Stage1. Submission Date for this Tender is 15-05-2023. Forming Tools Tenders in murshidabad West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

37362922
Tender For U1 Esp Overhauling Job During Under Ahp Em Stage1
Open Tender
Indian
West Bengal
murshidabad
15-05-2023

Tender Details

Tender For U1 Esp Overhauling Job During Under Ahp Em Stage1- 1 Dry Cleaning Work.Dry Cleaning Of Esp Starting From Esp Inlet Duct To Esp Outletduct , All Esp Hoppers, Gas Distribution Screens, All Emittingelectrodes And Collecting Plates And Other Allied Zones. 2 Water Jet Cleaninghp Water Jet Washing Of Total Esp Internal, Including All Hoppers, Collecting Plates, Emitting Electrodes And Other Allied Zones At Thetime Of Water Washing If Any Chocking Found In The Hoppers, Thechoking Shall Be Cleared Immediately. All Arrangements Includinghose And Hp Pump For The Job Will Be In PartyS Scope. 3 Erm System.Checking And Rectification Of Emitting Rapping System Of All Theesp Fields Thoroughly Including Housing Bearing Assembly Checkingand Replacement If Needed. 4 Crm System.Checking And Rectification Of Collecting Rapping System Of All Theesp Fields Thoroughly. 5 Support Insulator System.Replacement / Repair & Cleaning Of Support Insulator And Itsheater. 6 Hopper Heater.Replacement / Repair & Cleaning Of Hopper Heater. 7 Gd Screen.Replacement / Repair & Alignment Of Inlet Gd Screen ( Threestages ) . 8 Anvil Pads.Replacement / Re-Fitting Of Anvil Plate Of The All The Collectingplates Of Esp Fields, If Required After Checking. 9 Crm & Erm Systems.Replacement / Repair & Alignment Of Rapping Shafts, Bearings, Pin Wheel, Hammer Assembly Of All The Rapping Mechanism ( Collecting & Emitting ) , If Required After Checking For All Espfields ( 28 No ) . 10 Shock Bar System.Repair Of Shock Bar And Also The Alignment Of The Shock Bar. 11 Baffle Plates.Refitting / Repair Of Baffle Plates Of All The Esp Hoppers ( 56 Nos ) Thoroughly. 12 Cerm & Eerm Gear Boxes.Lubrication Of Collecting And Emitting Rapping Motor And Itsgearbox. Servicing / Rectification / Replacement Of Cerm / Eerm Gearbox If Needed. 13 Esp Fields.After Completion Of Aforesaid Jobs, Meggaring Of Each Field To Becarried Out Until It Comes To Its Desired Value. 14 Tr Sets.The Entire Transformer # Rectifier Units Should Be Checkedthoroughly And Cleaned Body Only Including Checking Of Oil Leveland Changing Of Silica Gel Depending Upon The Condition Then.Oc & Sc Testing ( 28 Nos. ) Of Tr Set . 15 Hv Safety Bkrs.Alignments Of All The Safety Breakers, 28Nos. ( 1 For Each Field ) Should Be Checked & Rectified. These Must Also Be Cleaned. 16 Esp Mcc Panels.All The Mcc Panels ( 28Nos. ) Of Esp Fields & Its Incomerbreakers ( 12 Nos. ) Including 6.6 Kv / 415V Dry Typetransformers ( Three Nos. ) To Be Cleaned & Tightness Checked. 17 Suspension Frame & I-Beam.Checking & Maintenance Of Collecting & Emitting Suspension Frameand I-Beam Of A-Path & B-Path. Suspension Point Of Collectingplate And Emitting Wire Also To Be Checked. 18 Esp Manhole Doors.Inspection And Repair Of All Manhole Doors Of A-Path & B-Path.All Rope Gasket Change. 19 Esp Hopper Liner Welding Inspection ( De-Metering ) And Repair Of Hopper Walls / Liner Weldingby Scaffolding Of 56 Number Of Esp Hoppers. 20 Guide Vane.Checking , Repair / Replacement And Strengthening Of Guide Vaneof Esp Inlet Duct. 21 Esp Hopper Acc Checkingesp Hopper Ali Probes & Controllerschecking / Calibration / Replacement Along With Solenoid V / V , Pu Tube& Connector Checking , Servicing And Replacement If Required. 22 Shaft Insulator System.Replacement / Repair & Cleaning Of Shaft Insulator And Its Heater 23 Gap Adjustment Of All Plates.Through Checking Of Collecting Plates ( Top To Bottom ) Andstraightening Of All The Collecting Plates Of 28 Nos. Of Esp Fields.Gap Adjustment Of All The Plates ( Between The Collecting Plates ) Ofall The Esp Fields. Inspection And Replacement Of Electrodes ( 1St, 2Nd & 3Rd Fields Having Multipeaks And 4Th , 5Th , 6Th & 7Thfields Having Spring Wires ) Etc. Field Alignment. 24 Fixing / Repairing / Realignment Of Cefixing / Repairing / Realignment Of Collecting Plates At Suspension Pointand Shock Bar Portion Of Esp Fields As Per Requirement.

Key Value

Document Fees
Refer document
EMD
INR 24212.0 /-
Tender Value
INR 12.10 Lakhs /-

BOQ Items

U#1 ESP Overhauling Job during under AHP (EM)- Stage#1(2X300MW)
Sl. No. Item Description
1Dry Cleaning Work. Dry cleaning of ESP starting from ESP inlet duct to ESP outlet duct ,all ESP hoppers,Gas distribution Screens,all emitting electrodes and collecting plates and other allied zones.
2Water Jet cleaning HP Water Jet washing of total ESP internal, including all hoppers, collecting plates, emitting electrodes and other allied zones at the time of water washing if any chocking found in the hoppers, the choking shall be cleared immediately. All arrangements including hose and HP pump for the job will be in party"s scope.
3ERM System. Checking and rectification of Emitting rapping system of all the ESP fields thoroughly including housing bearing assembly checking and replacement if needed.
4CRM System. Checking and rectification of collecting rapping system of all the ESP fields thoroughly.
5Support Insulator System. Replacement / Repair & Cleaning of Support Insulator and its Heater.
6Hopper Heater. Replacement / Repair & Cleaning of Hopper Heater.
7GD Screen. Replacement / Repair & Alignment of Inlet GD screen (three stages).
8Anvil Pads. Replacement / re-fitting of Anvil Plate of the all the collecting plates of ESP fields, if required after checking.
9CRM & ERM Systems. Replacement / Repair & Alignment of rapping shafts, bearings, Pin wheel, hammer assembly of all the rapping mechanism (Collecting & Emitting), if required after checking for all ESP Fields (28 No).
10Shock Bar System. Repair of shock bar and also the alignment of the shock bar.
11Baffle Plates. Refitting/ Repair of Baffle plates of all the ESP hoppers (56 nos) thoroughly.
12CERM & EERM Gear Boxes. Lubrication of Collecting and Emitting rapping motor and its gearbox. Servicing/Rectification/Replacement of CERM/EERM Gear box if needed.
13ESP Fields.After completion of aforesaid jobs, Meggaring of each field to be carried out until it comes to its desired value.
14TR Sets. The entire Transformer # Rectifier units should be checked thoroughly and cleaned body only including checking of oil level and changing of silica gel depending upon the condition then. OC & SC Testing (28 nos.)of TR Set .
15HV Safety Bkrs. Alignments of all the safety breakers, 28Nos. (1 for each field) should be checked & rectified. These must also be cleaned.
16ESP MCC Panels. All the MCC panels (28Nos.) of ESP fields & its Incomer Breakers (12 Nos.) including 6.6 KV/ 415V Dry type Transformers (Three Nos.) to be cleaned & tightness checked.
17Suspension Frame & I-Beam. Checking & maintenance of collecting & emitting suspension frame and I-beam of A-path & B-path. Suspension point of collecting plate and emitting wire also to be checked.
18ESP Manhole Doors. Inspection and repair of all manhole Doors of A-path & B-path. All rope gasket change.
19ESP Hopper Liner Welding Inspection (De-metering) and repair of hopper walls/Liner welding by scaffolding of 56 number of ESP Hoppers.
20Guide Vane. Checking , Repair/Replacement and strengthening of Guide Vane of ESP Inlet Duct.
21ESP Hopper ACC checking ESP Hopper ALI probes & controllers checking/calibration/replacement along with solenoid V/V ,PU Tube & connector checking ,servicing and replacement if required.
22Shaft Insulator System. Replacement / Repair & Cleaning of Shaft Insulator and its Heater
23Gap adjustment of all Plates. Through checking of collecting plates (top to bottom)and straightening of all the collecting plates of 28 nos. of ESP fields. Gap adjustment of all the plates (between the collecting plates) of all the ESP fields. Inspection and replacement of electrodes (1st ,2nd & 3rd fields having Multipeaks and 4th ,5th ,6th & 7th fields having Spring wires) etc. Field Alignment.
24Fixing/Repairing/Realignment of CE Fixing/repairing/realignment of collecting plates at suspension point and shock bar portion of ESP fields as per requirement.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail