}

Tender For Consultancy Services For Preparation Of Detailed Project Report And Providing Pre-Construction Services In Respect Of Up-Gradation To 2/4/6 Lane From Km 343 (Kumarghat) To Km 397 (Ambassa) And From Km 422 (Mugiakami) To Km 456.5 (Champaknagar),, tripura-Tripura

National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Tender For Consultancy Services For Preparation Of Detailed Project Report And Providing Pre-Construction Services In Respect Of Up-Gradation To 2/4/6 Lane From Km 343 (Kumarghat) To Km 397 (Ambassa) And From Km 422 (Mugiakami) To Km 456.5 (Champaknagar),. Submission Date for this Tender is 12-06-2023. Consultancy Service Tenders in tripura Tripura. Bidders can get complete Tender details and download the document.




Tender Notice

37354862
Corrigendum : Tender For Consultancy Services For Preparation Of Detailed Project Report And Providing Pre-Construction Services In Respect Of Up-Gradation To 2/4/6 Lane From Km 343 (Kumarghat) To Km 397 (Ambassa) And From Km 422 (Mugiakami) To Km 456.5 (Champaknagar),
Open Tender
Indian
Tripura
tripura
12-06-2023

Tender Details

Consultancy Services For Preparation Of Detailed Project Report And Providing Pre-Construction Services In Respect Of Up-Gradation To 2 / 4 / 6 Lane From Km 343 ( Kumarghat ) To Km 397 ( Ambassa ) And From Km 422 ( Mugiakami ) To Km 456.5 ( Champaknagar ) , ( Total Length: 88.5Km ) On Churaibari To Agartala Road Section On Nh-08 In The State Of Tripura On Epc Basis. 1 Schedule A ( Fixed Lumpsum Cost ) 2 Remuneration For Local Staff ( Including Per Diem Allowance ) 3 A. Key Professionals 4 Team Leader Cum Senior Tunnel Engineer 5 Senior Bridge Engineer 6 Highway Cum Pavement Engineer 7 Material-Cum-Geotechnical Engineer- Geologist 8 B. Other Professionals 9 Senior Survey Engineer 10 Traffic And Safety Expert 11 Environmental Specialist 12 Quantity Surveyor / Documentation Expert 13 Land Acquisition Expert 14 Utility Expert 15 Sub-Professional Staff: ( To Be Assessed By Consultant As Per Requirement Of Assignment, Minimum 6 To Be Deployed ) 16 Bridge Engineer 17 Assistant Highway Cum Pavement Engineer 18 Assitant Material Cum Geotechnical Engineer 19 Survey Engineer 20 Assitant Quantity Surveyor / Documentation Expert 21 Support Staff ( Fixed Rates ) 22 Office Manager ( 1 No. ) 23 Typist ( 1 No. ) 24 Office Boy ( 1 No. ) 25 Night Watchman ( 1 No. ) 26 Transportation ( Fixed Costs ) 27 The Vehicles Provided By The Consultants Shall Include The Cost For Rental, Drivers, Operation, Maintenance, Repairs, Insurance, Etc. For Use Of Consultants ( 3 Vehicle For 6 Months Each ) ( Bolero Or Equivalent ) 28 Duty Travel To Site ( Fixed Costs ) 29 All Trips 30 Office Rent ( Fixed Costs ) 31 The Rent Cost Includes Operation & Maintenance, Cleaning, Repairs, Etc For Entire Duration Of Services. 32 Office Supplies, Utilities And Communication ( Fixed Costs ) 33 Office Supplies, Drafting Supplies, Computor Running Costs, Domestic And International Communication 34 Office Furniture And Equipment ( Fixed Costs ) 35 Office Furniture And Equipment 36 Reports And Document ( Fixed Costs ) 37 Monthly Report ( 03 Sets ) 38 Inception Report & Qap 39 Environment And Social Impact Screening Report 40 Draft Feasibility Report 41 Final Feasibility Report 42 Strip Plan With L.A. Reports 43 Draft La And Clearances I Report 44 Final La And Clearances I Report 45 Draft Environmental Assessment Report & Rap 46 Final Environmental Assessment Report & Rap 47 Draft Detailed Design Report & Drawings Etc. 48 Draft Emp 49 Draft Bidding Documents 50 Final Detailed Project Report With Bill Of Quantities, Cost Estimates, Updated Drawings Etc. 51 Final Emp 52 Final Bidding Documents 53 Draft 3 ( A ) , 3 ( A ) And 3 ( D ) Notification For Land Acquisition ( 3 Copies Each ) 54 La & Clearances Ii Report 55 Survey And Investigation 56 A.Topographical Survey ( Fixed Rate ) 57 Complete Topographic Survey Using Mobile / Aerial Lidar Or Equivalent / Better Technology For Project Approach Area Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc. Inclusive Of Cost Of Materials, Labourer, Preparation Of Drawings And Their Submission As Per Contract Provision. 58 B. Investigation ( Fixed Cost ) 59 All Investigations / Surveys Including Road And Bridge Inventory, Fwd Test And Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey And Investigation, Sub-Grade Investigation, Traffic Survey, Socio-Economic & Census Survey / Studies, Land Acquisition Studies, Etc. 60 Schedule B ( Item Rate Costs ) 61 Sub-Soil Investigation & Other Works 62 Sub-Soil Investigation 63 A ) Boring In All Type Of Soils ( Other Than Hard Rock ) 64 B ) Boringinhard Rock 65 Net Work Survey And Gpr 66 Net Work Survey Of The Existing Highways As A Repository For Civil Work As Per Directions From Authority. 67 Gpr Survey For Detection Of Under Ground Utilities. 68 Cost Of Supply And Fixing Boundary Pillars 69 Procuring And Fixing Boundary Pillars And Its Installation, Complete In All Respect As Per Irc:25, 1967: Wherever The Proposed Alignment Follows The Existing Alignment, The Boundary Pillars Shall Be Fixed At An Interval Of 200 M On Either Side Of Proposed Right Of Way. Whereever There Is A Proposal Of Realignment Of The Existing Highway And / Or Construction Of New Bypasses, Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval. 70 Land Acquisition Team Including Support Staff And Logistics / Transportation 71 A. Land Acquisition Team Including Support Staff 72 Ex-Land Revenue Inspector / Officer Or Equivalent 73 Ex-Kanoongo / Girdawar Or Equivalent 74 Ex-Patwari Or Equivalent 75 Typist 76 Peon 77 B. Logistics For Land Acquisition Team 78 Computer Including Necessary Peripherals ( 2 No For 6 Months Each ) 79 Printers ( 2 No For 6 Months Each ) 80 Vehicles ( Bolero Or Equivalent ) Withmonthly Running Limit Of 4000 Km ( 1 No For 6Months ) 81 Grand Total ( Schedule A+B )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 19-May-2023 Corrigendum No. 2 Date 12-06-2023
2 19-May-2023 Corrigendum No. 1 Other 12-06-2023

Key Value

Document Fees
INR 5900 /-
EMD
INR 200000.0 /-
Tender Value
Refer document

BOQ Items

Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect of up-gradation to 2/4/6 lane from km 343 (Kumarghat) to km 397 (Ambassa) and from km 422 (Mugiakami) to km 456.5 (Champaknagar), (Total Length: 88.5km) on Churaibari to Agartala road section on NH-08 in the State of Tripura on EPC basis.
Sl. No. Item Description
1Schedule A (Fixed Lumpsum Cost)
2Remuneration for Local Staff (including per diem allowance)
3A. KEY PROFESSIONALS
4Team Leader Cum Senior Tunnel Engineer
5Senior Bridge Engineer
6Highway cum Pavement Engineer
7Material-cum-Geotechnical Engineer- Geologist
8B. OTHER PROFESSIONALS
9Senior Survey Engineer
10Traffic and Safety Expert
11Environmental Specialist
12Quantity Surveyor/Documentation Expert
13Land Acquisition Expert
14Utility Expert
15Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment, Minimum 6 to be deployed)
16Bridge Engineer
17Assistant Highway cum Pavement Engineer
18Assitant Material cum Geotechnical Engineer
19Survey Engineer
20Assitant Quantity Surveyor/Documentation Expert
21Support Staff (Fixed Rates)
22Office Manager (1 No.)
23Typist (1 No.)
24Office Boy (1 No.)
25Night Watchman (1 No.)
26Transportation (Fixed costs)
27The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (3 Vehicle for 6 months each) (Bolero or equivalent)
28Duty Travel to Site (Fixed Costs)
29All Trips
30Office Rent (Fixed Costs)
31The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
32Office Supplies, Utilities and Communication (Fixed Costs)
33Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication
34Office Furniture and Equipment (Fixed costs)
35Office Furniture and Equipment
36Reports and Document (Fixed costs)
37Monthly Report (03 sets)
38Inception Report & QAP
39Environment and Social Impact Screening Report
40Draft Feasibility Report
41Final Feasibility Report
42Strip Plan with L.A. Reports
43Draft LA and Clearances I Report
44Final LA and Clearances I Report
45Draft Environmental Assessment report & RAP
46Final Environmental Assessment report & RAP
47Draft Detailed Design Report & Drawings etc.
48Draft EMP
49Draft Bidding Documents
50Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
51Final EMP
52Final Bidding Documents
53Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
54LA & Clearances II Report
55Survey and Investigation
56A.Topographical Survey (Fixed Rate)
57Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.
58B. Investigation (Fixed cost)
59All investigations/surveys including Road and Bridge Inventory,FWD Test and Pavement Evaluation,Roughness Survey,Axle Load Survey,Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies,Land Acquisition Studies, etc.
60Schedule B (Item rate costs)
61Sub-soil Investigation & Other Works
62Sub-Soil Investigation
63a)Boring in all type of soils (other than hard rock)
64b) Boringinhard rock
65Net work Survey and GPR
66Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.
67GPR Survey for detection of under ground utilities.
68Cost of supply and fixing Boundary Pillars
69Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200 m on either side of proposed Right of Way. Whereever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.
70Land Acquisition Team including support staff and logistics/transportation
71A. Land acquisition Team including support staff
72Ex-Land Revenue Inspector/Officer or equivalent
73Ex-Kanoongo/ Girdawar or equivalent
74Ex-Patwari or equivalent
75Typist
76Peon
77B. Logistics for Land acquisition Team
78Computer including necessary peripherals (2 No for 6 months each)
79Printers (2 No for 6 months each)
80Vehicles (Bolero or equivalent) with monthly running limit of 4000 km (1 No for 6months)
81Grand Total (Schedule A+B)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail