Work Related To Uninterrupted Power Supply Of Damaged Electricity Lines Due To Natural Disaster In The Jurisdiction Of Edd-V, Khair
Tender Value
Ref. Documents
Estimated cost
Bid Submission
25 Apr 2023
0 days left
EMD
5000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
khair → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Work Related To Uninterrupted Power Supply Of Damaged Electricity Lines Due To Natural Disaster In The Jurisdiction Of Edd-V, Khair
BOQ
| Sl. No. | Item Description |
| 1 | Cartage of following PCC/STpoles from Store centre or from any other place to the respective site of work through the Kachha Pacca roadincluding the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). |
| 2 | PCC poles 8.5 Mtr./09 Mtr. |
| 3 | ST poles 11 Mtr./13 Mtr. |
| 4 | Cartage of line material viz Cable, Weasal Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). |
| 5 | Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 6 | PCC poles 8.5 Mtr. |
| 7 | ST pole 11 Mtr./13 Mtr. |
| 8 | Dismentling of old and damaged double pole after dismentling of all accessories. |
| 9 | Dismentling of old and damaged Single supportpole after dismentling of all accessories. |
| 10 | Erection of double pole on PCC pole/ST pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 11 | 11 KV line double pole |
| 12 | 33 KV line double pole |
| 13 | Providing and fixing of stay insulator. |
| 14 | Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. |
| 15 | ACSR Weasal Conductor. |
| 16 | ACSR Dog Conductor. |
| 17 | Grouting :- |
| 18 | PCC poles 8.5 Mtr./09 Mtr. Long as per RESPO norms |
| 19 | ST poles 11 Mtr./13 Mtr. Long as per RESPO norms |
| 20 | Making the plinth of Steel poles. |
| 21 | Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work. |
| 22 | Chopping of tree branches which are touching to HT/LT lines. |
| 23 | Retighting of stay complete with nozelling & binding including cost of labour T&P etc required for proper completion of work. |
| 24 | Straightening of tilted PCC/Steel pole at various places as per direction of JE. |
| 25 | Re-sagging of loose HT/LT line conductor as per direction of supervising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work. |
| 26 | ACSR Weasal Conductor |
| 27 | ACSR Dog Conductor |
| 28 | LT ABC 3x120+1x95+1x16/ 3x95+1x70+1x16/ 3x50+1x9351x16 Sq.mm. Bunch Conductor |
| 29 | Replacement/Re-fixing of following damaged/ disturbed/de-aligned accessories:- |
| 30 | 11 KV Disc Insulator with fitting |
| 31 | 11 KV Pin Insulator with fitting |
| 32 | 11 KV V-type Cross Arm |
| 33 | F bracket |
| 34 | 33 KV Disc Insulator with fitting |
| 35 | 33 KV Pin Insulator with fitting |
| 36 | 33 KV V-type Cross Arm |
| 37 | Dismantling and removal of existing conductor from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. |
| 38 | ACSR Weasal Conductor/GI wire. |
| 39 | Safe carriage of Old line material viz. Conductor, G.I. Earth wire, ABC conductor, Cross Arm, Angle, Channel, Insulators, Clamps & other line material from any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 40 | Guarding of old 11 KV line damaged due to storm by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work. |
| 41 | Providing/Fixing of missing Nut bolts and washer |
| 42 | Providing & Fixing ofClamps of LT,Cross Arm Holding, F-Clamp, Stay Clamp, Danger board clamp with Nut & Bolts. |
AI Tender Summary
Tender Timeline
Apr 20, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedApr 25, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedApr 25, 2023
Bid Opening Date
Technical bids will be opened and evaluated.