South Eastern Coalfields Limited-SECL has published Tender For Assistance In Major Shutdown/Preventive/ Breakdown Mechanical Maintenance Works At Various Locations Of Conveyors, 20,000 Te. Bunker And Trs-1 Sections Of New Chp Phase-1 And Ac-4 Feeder Breaker. Submission Date for this Tender is 09-05-2023. Man Power Supply Tenders in Korba Chhattisgarh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 05-May-2023 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 09-05-2023 |
Sl. No. | Item Description |
1 | Scope/Nature of Work:-1. The work will be taken up as and when required basis on a very short notice subjected to availability and shutdown of circuits.2. The Welding electrode, industrial gas, other consumables will be provided by the department. 3. The working site may be dusty & mucky.4. For installation of drive units/other sub-assembling, desired preparation should be done.5. Work should be carried out as per existing design. 6. The repairing/maintenance work carried out on site will be as per instruction of Engineer I/C.7. All tools, tackles & safety standards to engaged personnel will be provided by the Contractor. |
2 | Dismantling/disassembling/handling job in major shutdown/ preventive/ breakdown mechanical maintenance works:- Dismantling/ lowering of counter weights, dismentling/lowering of idlers and idler frames, pulling of damaged/ existing steel cord belt/ rubber belt, dismantling and disassembly of damaged assembly/ sub-assembly, pulleys, rolling elements, drive units, conveyor take up units etc. and other allied works at various locations of conveyors, bunker & TRS-1 at New CHP phase-1. Dismentling of crusher roll (primary/secondary), bearing blocks, bearings, shear hubs and allied works at AC-4 Feeder Breaker. |
3 | Assembling/ Installation/handling job in major shutdown/ preventive/ breakdown mechanical maintenance work:- Handling of counter weights, mounting of idlers and idler frames, laying/ placing/ positioning of new steel cord/ rubber belt, re-installation/ re-erection, setting of new/ repaired assembly/ sub-assembly, pulleys, rolling elements, drive units, conveyor take up units etc. & other allied works at various locations of conveyors, bunker & TRS-1 at New CHP phase-1. Fitting of crusher roll (primary/secondary), bearing blocks, bearings, shear hubs and allied works at AC-4 Feeder Breaker. |
4 | Total impact of GST for the purpose of CTC |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail